38.1 Fireblocking & Draftstopping
Key Takeaways
MRC R302.11 requires fireblocking to cut off both vertical and horizontal concealed draft openings and to form an effective fire barrier between stories and between the top story and the roof space.
R302.11 covers concealed wall cavities at floor and ceiling levels and at intervals of at most 10 feet along the wall, connected concealed soffits or ceilings, the ends of concealed stair-stringer runs, specified service penetrations, chimney and fireplace details, and the separation line at two-family cornices.
R302.11.1 lists solid and layered lumber, backed wood structural panels or particleboard, gypsum, millboard, securely retained batts or blankets, and cellulose tested for the specific use. Match the selected material to its installation conditions.
R302.12 divides a qualifying combustible floor/ceiling cavity between usable spaces into approximately equal areas of at most 1,000 square feet. In membrane-enclosed assemblies, check for a suspended ceiling or open-web or perforated framing.
Draftstops use at least 1/2-inch gypsum board, at least 3/8-inch wood structural panels or another approved material. Provide adequate support, maintain their integrity and install them parallel to the floor members unless the building official approves another orientation.
Why Concealed Cavities Are a Fire Path
A soffit or dropped ceiling can connect several wall cavities. A furred basement wall or a balloon-framed wall can connect those spaces vertically across floor levels. When open pathways communicate, smoke and hot gases can spread beyond the room where the fire began.
In combustible construction, fireblocking interrupts concealed paths for flame and combustion products between stories and at the top-story-to-roof transition. Use §R302.11 for the required locations and §R302.11.1 for the materials. Michigan’s Rule 509 places inspection after the specified framing and blocking work and approval of the rough trade inspections.
Required locations — R302.11
| Code item | Where it applies | What the installation looks like |
|---|---|---|
| Item 1.1 | Concealed spaces of stud walls and partitions, including furred spaces and parallel or staggered studs — vertically at ceiling and floor levels | Solid blocking between studs at the top plate line, at the floor line, and in the furred space between a basement wall and the framed wall |
| Item 1.2 | Same cavities — horizontally at intervals not exceeding 10 feet (3,048 mm) | Separate a laterally connected cavity with barriers spaced along the wall run. Check the approved material for the assembly. |
| Item 2 | Interconnections between concealed vertical and horizontal spaces | Blocking at soffits, drop ceilings and cove ceilings, where a horizontal chase meets a wall cavity |
| Item 3 | Concealed spaces between stair stringers at the top and bottom of the run | Block concealed spaces between stringers. Protect enclosed accessible under-stair spaces separately under R302.7. |
| Item 4 | Annular openings around vents, pipes, ducts, cables and wires at ceiling and floor levels | An approved material that resists the free passage of flame and products of combustion |
| Item 5 | Chimneys and fireplaces | Use the chimney/fireplace detail. R1003.19 requires noncombustible blocking at a chimney’s floor or ceiling penetration. |
| Item 6 | Cornice of a two-family dwelling | Blocking at the dwelling-unit separation line |
At a platform floor line, check whether the solid plate and floor assembly actually close the passage. Trace any bypass beside the plate, behind furring or through service holes. At a balloon-framed floor line, close the continuous stud cavities. Behind a 24-foot-long wall with one continuous furred cavity, barriers at 8 and 16 feet split the run into three 8-foot segments when both ends are closed. Check floor and ceiling closure separately from that horizontal layout.
Prescribed materials and approved alternatives — R302.11.1
| Material | Minimum form | Field notes |
|---|---|---|
| Dimensional lumber | 2-inch nominal (1-1/2 inch actual) | Cut and secure to close the opening |
| Layered lumber | Two thicknesses of 1-inch nominal with broken lap joints | Joints must not line up; each layer covers the other's seam |
| Wood structural panel | One thickness of 23/32 inch, joints backed by 23/32 inch | Use the stated thickness for the prescriptive single-layer WSP option |
| Particleboard | One thickness of 3/4 inch, joints backed by 3/4 inch | Back every joint |
| Gypsum board | 1/2 inch | Useful at soffits and chase enclosures where blocking is impractical |
| Cement-based millboard | 1/4 inch | Use within the approved assembly |
| Mineral wool or glass fiber batts or blankets | Securely retained in place | Approved nonrigid materials may serve the 10-foot horizontal rule in parallel-row or staggered-stud walls |
| Cellulose insulation | Tested under ASTM E119 or UL 263 for the specific application | Install as tested |
For unfaced fiberglass batt fireblocking, fill the whole cross-section for at least 16 inches measured vertically and pack tightly around obstructions. Loose-fill needs specific testing showing that it stays in place and retards fire and hot gases. Keep the completed barrier intact under R302.11.2.
For service annular openings, Item 4 allows approved material that resists the passage of flame and combustion products. ASTM E136 compliance is unnecessary for that fill. Verify the evaluation, gap, materials and installation conditions. For chimneys and fireplaces, use the separate clearance and noncombustible blocking details. For a rated assembly, check the applicable rated penetration system. Keep the fireblocking intact when later trade work opens the cavity.
Which single-layer wood structural panel detail satisfies the listed material option in 2015 MRC R302.11.1 for a fireblock?
One thickness of 23/32-inch wood structural panels with joints backed by 23/32-inch panels
One thickness of 1/2-inch oriented strand board with joints taped
One thickness of 3/8-inch plywood nailed to the plate
One layer of 1/4-inch plywood with construction adhesive at the joints
Draftstopping — the Large-Cavity Rule
Draftstopping subdivides qualifying concealed floor/ceiling spaces. Under R302.12, in combustible construction with usable space above and below, divide the concealed area into approximately equal compartments of no more than 1,000 square feet each.
Where the floor and ceiling membranes enclose the assembly, R302.12 identifies these floor/ceiling configurations for draftstopping:
- The ceiling is suspended under the floor framing.
- The floor framing is constructed of truss-type open-web or perforated members.
For a rectangular 2,000-square-foot concealed assembly between usable floors with open-web trusses, a continuous line placed parallel to the trusses can make two approximately equal 1,000-square-foot spaces. Determine the split from the actual plan. Close the cavity across the full draftstop plane, including transitions at its ends and above and below it.
Materials and orientation — R302.12.1
R302.12.1 allows 1/2-inch gypsum board, 3/8-inch wood structural panels or another approved material, adequately supported. Align the draftstop parallel to the floor members unless the building official approves another orientation. If later work penetrates it, restore its integrity with an approved detail.
| Question | Fireblocking (R302.11) | Draftstopping (R302.12) |
|---|---|---|
| What is being protected | Small interconnected wall, soffit, stair and chase cavities between stories and to the roof space | Qualifying concealed floor/ceiling spaces |
| How the requirement is sized | By location, plus a 10-foot horizontal interval in walls | By area: compartments not exceeding 1,000 square feet, approximately equal |
| Minimum materials | 2-inch nominal lumber, 23/32-inch WSP, 1/2-inch gypsum, 1/4-inch millboard, retained mineral wool, and the other R302.11.1 items | 1/2-inch gypsum board, 3/8-inch wood structural panels, or other approved material |
| Orientation | Fits the cavity it blocks | Parallel to the floor framing unless approved otherwise |
| Who installs it | Framer, at framing stage | Framer or drywall crew, before the ceiling membrane closes the cavity |
Check Before Concealment
- Soffits and dropped ceilings. Check where each connects to a concealed wall space.
- Plumbing and furred walls. Inspect bypasses behind framing and approved protection around service penetrations at floors and ceilings.
- Cantilevered floors and exterior soffits. Close paths where the concealed spaces communicate.
- Stairs. Check the ends of each concealed stringer run and the separate R302.7 gypsum requirement for enclosed accessible under-stair surfaces.
- Open-web floor framing. Check the draftstop area, orientation and continuous fit. A bearing wall below the floor framing may leave the floor cavity open above it.
Scenario: the failed soffit inspection
At a two-story house, a 16-foot kitchen soffit drops 14 inches below the ceiling and ends at an interior wall. The rough opening allows air to pass from the soffit into a vertical wall cavity. R302.11 Item 2 requires a fireblock at that hidden connection. Gypsum applied only to the visible soffit and wall faces leaves the connection open.
Before closing the soffit, fit and secure nominal 2-inch lumber across the opening, or use another listed material such as properly backed 23/32-inch wood structural panel or 1/2-inch gypsum. Confirm the cavity is closed at the edges. A duct or cable crossing a floor or ceiling requires its applicable penetration protection as well. Inspect the completed route and fireblock before cover.
For comparison, a 1,600-square-foot membrane-enclosed open-web floor between usable stories calls for approximately equal draftstop compartments of about 800 square feet each. Place the dividing line parallel to the trusses and support the draftstop through the whole depth, with no open bypass at the perimeter.
A combustible floor/ceiling cavity between usable stories is enclosed by floor and ceiling membranes and framed with open-web trusses. Under R302.12, what is the maximum area of each draftstop compartment?
500 square feet
750 square feet
1,000 square feet
1,500 square feet
Which statement correctly distinguishes fireblocking from draftstopping under the Michigan Residential Code?
Fireblocking is used only in attics, while draftstopping is used only in crawl spaces
Fireblocking and draftstopping are interchangeable terms for the same R302 requirement
Draftstopping is required in every stud bay at the top plate, while fireblocking is required only in floor/ceiling assemblies
Fireblocking closes concealed pathways at specified locations. Draftstopping subdivides qualifying floor/ceiling cavities into areas of no more than 1,000 square feet.
Sections you finish are checked off in the contents.