60.3 Roof, Deck & Ladder Jacks

Key Takeaways

  • For covered low-slope roofing work, §1926.501(b)(10) allows warning lines combined with a listed system. A safety monitor alone is an option only at 50 ft or less in width under that roofing provision.

  • A slope greater than 4 in 12 is a steep roof. For an unprotected steep roof with a drop of 6 ft or more, use guardrails with toeboards, safety nets or personal fall arrest.

  • Under Michigan Rule 1256 a ladder jack scaffold is light duty, uses Type I manufactured ladders and is limited to 20 ft. Provide personal fall arrest and check the platform and jack instructions.

  • Roofing brackets support a level working platform and are secured under Rule 1253. A crawling board has its own size, attachment and fall-protection provisions.

  • Protect temporary deck edges and openings before employee exposure. Where used, Part 45 guardrails generally have a 42 ± 3 in. top rail; the completed deck has separate applicable building-code requirements.

Last updated: November 2026

Separate the roof's slope and the work being performed from the staging equipment. A roof jack supports a plank. The choice of fall protection depends on the worker's exposure and the applicable rule.

Slope drives the method

A steep roof is defined in 1926.500(b) as a roof with a slope greater than 4 in 12 (vertical to horizontal). A 4-in-12 roof rises 4 in per 12 in of run, about 18.4 degrees; a 6-in-12 rises 6 in per 12 in, about 26.6 degrees. Anything above 4 in 12 is steep, and steep changes the permitted systems.

Low-slope roofing: 1926.501(b)(10)

For qualifying roofing activities on a roof of 4 in 12 or less with unprotected edges 6 ft or more above a lower level, §1926.501(b)(10) allows:

  • a guardrail system;
  • a safety net system;
  • a personal fall arrest system; or
  • a combination of a warning line with a guardrail, safety net, personal fall arrest system, or safety monitoring system.

Under that paragraph a stand-alone safety monitor is an option for a roof 50 ft or less in width. Determine width under Subpart M Appendix A. Roof deck installation is outside the roofing-work definition. Check the leading-edge or residential provisions for installing the deck.

Erect the warning line around all sides of the protected roof work area. Warning line requirements (§1926.502(f)):

FeatureRequirement
Setback, no mechanical equipmentNot less than 6 ft from the roof edge
Setback, mechanical equipment in use6 ft from edges parallel to travel; 10 ft from edges perpendicular to travel
HeightLowest point including sag no less than 34 in; highest point no more than 39 in
FlaggingHigh-visibility material at intervals no greater than 6 ft
Stanchion strengthResist 16 lb applied horizontally 30 in above the surface
Line strengthMinimum 500 lb tensile strength
Access pathsTwo warning lines forming a path, closed off when not in use

A safety monitor must recognize fall hazards, stay on the same walking/working surface within sight and speaking distance, warn workers and perform no duties that distract from monitoring. The monitor must be a competent person. Mechanical equipment may not be used or stored in the area being monitored. Materials and equipment may not be stored within 6 ft of a roof edge unless guardrails are erected at the edge.

Steep roofs: 1926.501(b)(11)

On a steep roof with unprotected sides and edges 6 ft or more above a lower level, the only permitted systems are:

  1. guardrail systems with toeboards,
  2. safety net systems, or
  3. personal fall arrest systems.

A warning line or monitor cannot serve as the required protection under the steep-roof paragraph.

Residential work and temporary access

Apply §1926.501(b)(13) to qualifying residential construction. Use conventional systems or an applicable alternative provided in §1926.501(b). Michigan's January 2026 instruction discusses properly rigged restraint that prevents access to a fall hazard and the written site-specific plan where an applicable exception is established. A platform or slide guard alone cannot meet the steep-roof requirement.

Ladder jack scaffolds

A ladder jack scaffold carries a working platform on jacks attached to ladders. Michigan Rule 1256 limits it to light duty, Type I manufactured ladders and a platform no higher than 20 ft from the ground or floor. Under adopted §1926.452(k), use no job-built support ladders, secure the supporting ladders against slipping and do not bridge platforms between jacks on different scaffolds. The jack bears on side rails and rungs, or on rungs alone with at least 10 lineal inches of bearing per rung. Match the jack and ladder models and the manufacturer's permitted span, plank or pick, fasteners and loading limits. For example, the Werner AC10-20-02 specifies compatible extension ladders; using a rated jack does not change the Michigan requirements.

The AC10-20-02 accepts stages up to 20 in. wide and has a platform clamp system. Confirm that the actual stage width and fastening satisfy both its instructions and Michigan's requirements.

A ladder jack scaffold can use a manufactured pick at least 12 in. wide. For wood planks, apply Rule 1217's separate scaffold-grade material, two-plank and span, bearing and securement requirements. Use the lower applicable component or design load limit. Rule 1213(2) requires each employee to use personal fall arrest. Set the portable ladders under Part 11; the 3-ft projection or approved alternative applies when using a portable ladder to access an upper landing.

Roof brackets and crawling boards

Rule 1253 and §1926.452(h) require roofing brackets that fit the roof and support a level working surface. The Michigan rule calls for nailing in addition to the pointed projections, with first-quality ¾-in. manila rope or equivalent where nailing is impractical. Follow the bracket manufacturer's requirements for the attachment points and fasteners, pitch, platform width, load and spacing. For example, Guardian's model 2500 accepts 2-by-10 planking with specified angle settings. It has a model-specific 8-ft maximum bracket spacing and a load limit. Those product limits cannot be generalized to other brackets or slopes. Do not use a roof jack as a fall-arrest anchor.

A crawling board is separate from the bracket-supported plank. Rule 1253 calls for a board at least 1 by 10 in., extending eave to ridge and secured against movement. For crawling-board scaffold protection check §1926.451(g)(1)(iii), which specifies fall arrest, a qualifying guardrail, or a secured grabline or equivalent handhold in its scope. Apply the steep-roof protection rule where employees are working on the steep roof itself.

Decks, leading edges, and temporary guardrails

An open deck perimeter can be an unprotected edge, and the moving edge of the deck under construction can be a leading edge. Apply §1926.501(b)(1) or (b)(2) as appropriate at 6 ft or more. Select a compliant system before exposure. Where the frame can safely support temporary guardrails, install them early enough to protect exposed crews. Use applicable protection for installation itself.

  • Guardrails where used: 42 ± 3 in. top rail, midpoint midrail where used, 200-lb top-rail strength and falling-object protection where required.
  • Openings: secure covers against displacement and mark or color-code them. Size ordinary covers for twice the weight expected to be imposed. Keep protected access to the opening if it is a ladderway.
  • Material receiving: only open guardrails for the necessary operation, and protect employees exposed to falling through the opening under the hoist-area provisions. Restore the rail, chain or gate before normal access resumes.

When workers use a bracket-supported temporary deck as a work platform, select and attach the brackets under the applicable scaffold rule. For example, Part 12 Rule 1254 prescribes attachments for carpenters’ bracket scaffolds, and Rules 1213 and 1217 govern fall protection and platforms. An adjustable shore that carries a concrete form deck serves a different function. Use the shoring plans and Part 25, specifying the support and load path and inspecting the shoring before placement. Keep work-platform ratings separate from formwork support ratings.

Temporary construction guardrails protect workers during the job. The finished deck's guards are separately governed by the applicable Michigan construction code.

Worked scenario: 6-in-12 roof, 20 ft above grade

A 40-ft by 28-ft house with a symmetrical gable roof needs tear-off and re-roofing. The eave is 20 ft above grade, and the 14-ft horizontal run from eave to ridge rises 14 × 6 ÷ 12 = 7 ft. The ridge is about 27 ft above grade.

Select protection. The roof is steep. A guardrail with a toeboard may work if the supporting structure and product can carry the imposed loads and the crew can install it safely. A net requires adequate placement, outward extension and clearance below it. Personal fall arrest is another option if the crew can use compatible gear anchored to appropriate structure, maintain clearances and provide prompt rescue. The width-based monitoring allowance does not apply to steep roofs.

Check the proposed arrest system. Suppose the roof crew proposes a ridge anchor and a compatible self-retracting device. The ridge's height above grade alone cannot establish clearance at a lower point of the work path. Identify the shortest available clearance at the eave and at any lower roof, porch or other obstruction. Compare those distances with the selected device's chart using its stated reference point, approved anchorage elevation and permitted work angle. Check for swing into the building and contact with a leading edge. Where the values or approvals are missing, use a verified system or change the method before workers are exposed.

Plan material and rescue. Prepare a prompt rescue method suited to the roof, its access and the hazards below. Use an appropriate lifeline arrangement for each worker. Under Part 8 Rule 818(7) and §1926.502(j)(7), do not store roofing materials or equipment within 6 ft of the edge unless guardrails are erected there. Verify the roof and platform can support the staged load.

Test Your Knowledge

A crew will re-roof a 40-ft-wide roof with a 6-in-12 slope and unprotected eaves 20 ft above grade. Which protection is permitted by the steep-roof paragraph of Part 45?

A

Warning lines set back 6 ft from the eave, because the roof is more than 6 ft above grade

B

A safety monitoring system alone, because the roof is only 40 ft wide

C

Guardrails with toeboards, safety nets or personal fall arrest

D

Warning lines combined with a safety monitor

Test Your Knowledge

Which statement correctly describes the limits Michigan places on a ladder jack scaffold?

A

Light duty only, on Type I manufactured ladders, platform height not more than 20 ft, with a personal fall arrest system for the worker

B

Medium duty on any ladder rated Type II or better, with a guardrail

C

Heavy duty if three or more planks are used

D

Any duty rating, provided both ladders are tied off at the top

Sections you finish are checked off in the contents.