59.2 Hoisting Equipment
Key Takeaways
Michigan Part 10 incorporates crane operator training, applicable certification or licensing, and employer evaluation. Accredited certification may be by equipment type alone or by type and capacity. Part 15 separately governs construction material and personnel hoists.
Read the manufacturer’s chart for the actual configuration and required radius throughout the lift. Account for the hook block, slings, spreader beams and other deductions as directed by the chart.
For crane operations at up to 350 kV, evaluate the full reach within the work zone for entry inside 20 ft. Choose the applicable §1926.1408 option. Table A is 10 ft up to 50 kV, 15 ft over 50 to 200 kV, and 20 ft over 200 to 350 kV. Section 1926.1409 applies a 50-ft screening distance above 350 kV.
Section 1926.1412 includes each-shift inspection by a competent person, documented monthly inspection with records retained at least three months, at least annual comprehensive inspection by a qualified person, and inspection after assembly.
Under §1926.1425, distinguish the limited exceptions for a suspended load at rest, the rigging protections for workers hooking, unhooking, guiding or initially connecting it in the fall zone, and the rule allowing only workers needed to receive a load to enter the fall zone during landing.
Quick Answer: Identify the machine and task, then use the rated capacity for the whole lift path. For a crane near an overhead line, apply the work-zone test and the applicable protection option before the lift.
The Equipment Families
Michigan Construction Safety Standard Part 10, Cranes and Derricks (R 408.41001), adopts federal Subpart CC as amended November 16, 2020, with listed exceptions and substitutions. The separately adopted operator qualification and training provisions date to November 9, 2018. Michigan Part 15 covers mobile hydraulic excavators, construction material and personnel hoists, elevators, helicopters and conveyors.
- Mobile cranes and boom trucks. Equipment that hoists, lowers and horizontally moves suspended loads in construction is generally in Part 10. Certain articulating-boom deliveries are excluded under §1926.1400(c)(17). Setting trusses is distinct from ordinary delivery to the ground.
- Powered industrial trucks and telehandlers. Regular fork work uses the powered industrial truck requirements. When the machine is configured to hoist and lower by hook or winch and move a suspended load horizontally, §1926.1400(c)(8) brings it into crane scope. Verify the approved attachment and its rating. Excavators and backhoes remain excluded from Subpart CC even when using rigging to lift a suspended load.
- Overhead and gantry cranes. Covered construction installations follow §1926.1438; when that section references 29 CFR 1910.179, Michigan Part 10 substitutes General Industry Part 18. Equipment hoisting by a come-along or chainfall is excluded under §1926.1400(c)(10).
- Material and personnel hoists. Under Part 15 Rules 1543 and 1550, use the hoist within its applicable operating limits, post capacities and instructions, and protect the landing openings. Post the material hoist signal system and prohibit riding except for inspection and maintenance. Use a personnel hoist meeting the separate personnel requirements for routine movement of workers.
Who May Operate
For covered crane work, §1926.1427 sets three employer duties:
- Training. Provide formal and practical training. An operator-in-training must be continuously monitored on site and may only do permitted tasks within their ability.
- Certification or licensing. Use a qualifying government license where required, or certification through an accredited testing organization or qualifying audited employer program. Accredited testing can certify by equipment type alone or by type and capacity. Check credential scope and validity.
- Evaluation. Assess and document the operator's ability to use the assigned equipment safely for the work. Include relevant equipment configuration and assigned tasks. Certification does not replace this evaluation.
Derrick operators (§1926.1436), sideboom crane operators (§1926.1440) and operators of equipment with a maximum manufacturer-rated capacity of 2,000 lb or less (§1926.1441) are excepted from §1926.1427, with applicable training duties under the referenced provisions.
A signal person must qualify under §1926.1428 for the signals used, with documented assessment. A qualified rigger is required for the work covered by §1926.1425(c) in the fall zone.
Load Charts and Gross Load
Determine the chart entry at every required configuration, radius and swing quadrant. A larger radius increases the moment from a given load, but stability and structural strength both limit the chart. Use the chart notes and the approved setup. They may specify which entry to use between chart values.
| Chart factor | Effect on capacity | What the operator or planner does |
|---|---|---|
| Radius (distance from rotation center to load) | Capacity falls as radius grows — the dominant factor | Measure the actual radius at the worst point of the pick, not at the start |
| Boom length and angle | Longer boom at the same radius usually reduces capacity | Use the shortest boom that clears the obstruction |
| Counterweight and counterweight configuration | More counterweight increases capacity in some charts | Confirm the machine matches the chart's counterweight assumption |
| Outriggers fully extended vs. on rubber | On-rubber capacities are often a fraction of outrigger capacities | Match the supported or on-rubber configuration, including any manufacturer-approved intermediate extension |
| Quadrant (over front, side, rear) | Ratings differ by machine, setup and quadrant | Check every quadrant along the swing path |
| Jib, stinger, or attachment | Attachment, offset and stowed equipment may change rated capacity | Use the chart and deductions for the actual setup |
| Parts of line and block weight | Permitted reeving affects line capacity | Check permitted line pull and apply the chart’s listed weight deductions |
Worked example. A rooftop unit weighs 12,000 lb. The hook block, spreader, shackles and slings add 800 lb. Assume a gross chart with no additional deductions for this configuration. The suspended total is 12,800 lb. At 30 ft the chart shows 11,500 lb on full outriggers and 7,200 lb on rubber, so the lift exceeds either rating. If a different setup limits the entire path to a maximum 25-ft radius and the controlling chart capacity is 14,000 lb, the capacity check clears by 1,200 lb. Complete the ground, wind and travel-path checks before lifting. Grove's RT625 chart notes illustrate how gross ratings include the block, slings and lifting devices.
Setup and Ground Bearing
Under §1926.1402, crane ground conditions must be firm, drained and graded enough to meet manufacturer support and level requirements with supporting materials if needed. The controlling entity must arrange necessary ground preparation and report known hazards beneath the setup area, such as tanks, utilities and voids. Set outriggers or stabilizers as specified for the charted operation. When the assembly/disassembly provisions of §1926.1404(q) apply, use full extension or the manufacturer-permitted chart configuration.
Worked bearing check. Assume the lift plan finds a maximum reaction of 28,800 lb at one pad. With an effective bearing area of 9 ft², average contact pressure is 3,200 psf. A verified, stiff support that distributes the reaction over 16 ft² reduces the average to 1,800 psf. Check the support itself, effective contact area and allowable ground pressure. Use the worst individual reaction over the full pick rather than dividing crane weight equally between pads. Check level within tolerances before each shift and after movement and setup under §1926.1412(d)(1)(xi).
Power Line Clearances
29 CFR 1926.1408, as adopted by Part 10, uses a 20-ft screening distance for crane operation near lines up to 350 kV. Assembly and disassembly are addressed separately in §1926.1407. Before operating, the employer must identify the work zone (by demarcating boundaries or by treating the area 360 degrees around the machine out to its maximum radius as the zone) and determine whether any part of the equipment, load line, or load could come within 20 ft of a power line. If it could, one of three options must be used:
- Deenergize and ground — confirmed with the utility owner and visibly grounded at the site.
- 20-ft clearance — ensure nothing gets closer than 20 ft, using encroachment precautions.
- Table A clearance — determine the voltage and Table A distance. If the equipment, rigging or load could enter that distance in the work zone, use paragraph (b) measures to prevent encroachment.
| Nominal voltage (kV, AC) | Minimum clearance distance (ft) |
|---|---|
| up to 50 | 10 |
| over 50 to 200 | 15 |
| over 200 to 350 | 20 |
| over 350 to 500 | 25 |
| over 500 to 750 | 35 |
| over 750 to 1,000 | 45 |
| over 1,000 | As established by the utility owner/operator or a registered professional engineer |
When §1926.1408(b) applies, hold a planning meeting. Use nonconductive tag lines if tag lines are used. Put a visible high-visibility elevated warning line, barricade or line of signs at the required clearance, and use at least one listed measure, such as a dedicated spotter, proximity alarm, range warning or limiting device, or listed insulating link. A spotter needs an effective vantage point, a visual reference and continuous operator contact. If the operator cannot see the warning line, assign a dedicated spotter and another listed measure.
Treat overhead lines as energized unless the utility confirms they are deenergized and visibly grounded at the worksite. The utility must provide requested voltage information within two working days when Option 3 is used. A residential service drop can present an electrical hazard. For lines over 350 kV, §1926.1409 substitutes 50 ft for the 20-ft distances in §§1926.1407 and 1926.1408.
Signals and Communication
Under §1926.1419, provide a signal person when the operator cannot fully see the point of operation, travel view is obstructed, or the operator or person handling the load identifies a site-specific need. Use the standard hand signals in Appendix A or agree on allowable nonstandard signals before starting. Choose a communication method suited to the site and safely stop operations that require signals if communication is interrupted.
One person at a time directs a crane or derrick. Anyone who detects danger can give the stop or emergency stop signal, which the operator must obey. Keep a dedicated power-line spotter able to gauge clearance and give timely warning.
Inspections
29 CFR 1926.1412 includes these inspection intervals and also addresses qualifying repairs, modifications and severe service:
- Before each shift — a competent person performs a visual inspection, including control mechanisms, pressurized lines, hydraulic fluid level, hooks and latches, wire rope reeving and condition, electrical apparatus, tires, ground conditions under outriggers, level position, cab windows, and safety devices.
- Monthly — the shift inspection items are repeated, documented with items checked, inspector name and signature, and date, and the record retained at least three months.
- At least annually (comprehensive) — a qualified person inspects structure, sheaves, drums, brakes, clutches, power plant, chains, tires, hoses, valves, cylinders, outrigger pads, warning decals, and seat, with disassembly as necessary and functional testing.
- After assembly — a qualified person verifies the configuration before use. Use the manufacturer’s criteria or the replacement criteria procedure in §1926.1412(c) if they are unavailable.
The Exclusion Zone and the Lift Plan
29 CFR 1926.1425 requires using available hoisting routes that minimize employee exposure. While the suspended load is stationary, keep workers out of the fall zone, except those hooking, unhooking, guiding, making an initial connection or operating a concrete hopper or bucket. For employees hooking, unhooking, guiding or initially connecting the load in the fall zone, prevent unintentional displacement, use self-closing hook latches or equivalent (with the stated wooden-truss J-hook exception), and have a qualified rigger rig the load. While landing a load, only employees needed to receive it may be in the fall zone. Tilt-up or tilt-down has separate limits in §1926.1425(e), including keeping workers directly below the load out of that position.
Crane-hoisting people is generally prohibited unless conventional access would be more hazardous or not possible because of project or worksite conditions. When allowed by §1926.1431, meet the applicable platform, trial lift, proof test and operating safeguards. Material-hoist access is a separate Part 15 question.
A written lift plan is useful for a nonroutine pick. Use any applicable project criteria and check these inputs before proceeding:
- Load weight verified from a shipping document or calculated, plus the weight of rigging and any attached hardware.
- Required radius measured at the worst point of the pick, with the chart capacity for that radius and configuration written down.
- Crane position, outrigger spread, pad size, and ground bearing checked against soil conditions.
- Power line voltage and distance confirmed and the applicable option selected, with required controls in place.
- Rigging selected for the hitch, angle, and load edges, with WLL verified against tension per leg.
- Swing path cleared of people, obstructions, and anything the tail swing can strike.
- Signal person identified where required and the applicable signals and communications reviewed.
- Weather checked: wind limit from the manufacturer, plus lightning and visibility.
- Landing zone prepared, blocked, and clear of anyone not needed to receive the load.
A crane’s maximum working reach within its defined work zone can bring rigging within 18 ft of an energized 12.5 kV line. Under §1926.1408, what is the Table A clearance and what must the employer decide before operations?
10 ft. Choose and meet the deenergize-and-ground, 20-ft clearance, or Table A option, including the measures triggered by the selected option
20 ft. Any lift near an energized line is prohibited outright
4 ft. Use the unloaded travel clearance for the crane during the pick
25 ft. All distribution voltages use the same clearance
A rooftop unit weighs 12,000 lb; hook block and rigging weigh 800 lb. At the required 30-ft radius, the applicable gross load chart shows 11,500 lb and has no other deductions. What does the capacity check show?
It passes because a 10% margin may be added to the chart
It passes if the operator lowers the boom after the load clears the roof
It fails because 12,800 lb exceeds 11,500 lb; revise the lift configuration or select a suitable crane
It passes because the chart check considers only rigging weight
For a Michigan construction crane subject to §1926.1427, which qualification statement is correct?
Only an NCCCO credential can satisfy the requirement
The employer ensures training, applicable certification or licensing, and evaluation. An accredited certification may be based on crane type alone
A backhoe operator can substitute previous experience for evaluation whenever another worker is present
Only cranes rated over 100 tons require a credential