53.1 Siding Installation Elements
Key Takeaways
The ordinary R703.2 felt detail uses intact ASTM D226 Type I No. 15 asphalt felt, with at least 2 inches of course overlap and 6 inches at joints. Approved alternative WRBs follow their applicable instructions.
For the 2015 code defaults, space fasteners no more than 16 inches apart for horizontal vinyl and 12 inches apart in both directions for vertical vinyl. Use the product instructions and any supporting test report for a different schedule.
In the VSI horizontal field example, center fasteners in their slots, leave about 1/32 inch under the head and leave 1/4 inch at receivers, or 3/8 inch below 40°F. Follow the product details at corners, gables and other transitions.
Install R703.4 flashing shingle-fashion. At openings, follow the applicable drain-to-exterior or drain-to-WRB detail. R903.2.1 requires runoff diversion where a sloped roof eave meets a vertical sidewall.
Match corrosion-resistant fasteners to the cladding, substrate and treatment. R317.3 has separate preservative and exterior fire-retardant provisions, and R703.6.3 specifies Type 316 for the covered treated shakes and shingles.
Cladding sheds most rain. The water-resistive barrier (WRB) behind it, together with flashing and drainage openings, carries water that gets through the cladding back outside. MRC R703.1 requires a weather-resistant exterior envelope with flashing under R703.4. The ordinary framed wall under R703.1.1 needs a WRB and a way to drain. R703.2 allows intact ASTM D226 Type I No. 15 asphalt felt or an approved alternative. For felt, lay horizontal courses with an upper-over-lower lap of at least 2 inches and joint laps of at least 6 inches. Continue to the wall top and detail the penetrations. Use the approved alternative’s applicable laps and fastening instructions.
The installation sequence
The example below follows a typical horizontal vinyl wall. Coordinate window, ledger, roof and vent flashings with the WRB in the order required for their assemblies. Install parts that will be concealed while there is still access to lap and inspect them.
| Step | What to check |
|---|---|
| Backing and WRB | Flat, stable nailing surface. Approved course and joint laps, integrated penetrations. |
| Drainage transitions | Flash openings, roof intersections and attachments as required. Keep the intended outlet open. |
| Starter strip | Set it level before engaging the bottom lock of the first course. |
| Corner posts and receivers | Set plumb and leave the specified movement clearance. Install before the field panels reach them. |
| First and field courses | Engage locks without stretching panels, stagger end laps and keep panels free to move. |
| Openings and top course | Use utility trim and snap-lock lugs where a cut removes the upper lock, as directed. |
| Soffit and fascia | Fasten each soffit panel to its specified support. Coordinate trim and keep designed intake area open. |
| Final | Check grade, roof and deck clearances, flashing outlets and sealant locations. |
Fastening the cladding
R703.3.2 calls for corrosion-resistant fastening under Table R703.3(1) or an approved alternative. Its general nail and staple provisions refer to ASTM F1667 and specify at least 16-gage wire with a 7/16-inch crown for staples. Use the material-specific schedule where it applies. With fiberboard or gypsum backing, reach the framing. With wood structural panels, check whether the manufacturer’s instructions or Table R703.3.2 permit attachment to the sheathing alone. The optional table is for nonvertical siding weighing at most 3 psf, over wood structural panels at least 7/16 inch thick. It allows direct attachment or up to 2 inches of intervening foam. Check its fastener and spacing requirements. For foam, check the cladding and substrate provisions of R703.15–R703.17 and the applicable material-specific rules.
For vinyl, R703.3.3 and R703.11.1 normally require at least 1-1/4 inches of penetration into nailable wood sheathing and framing combined, or 1-1/4 inches into framing when the sheathing is fiberboard or gypsum. The R703.11.1.2 alternative uses nailable sheathing without reaching framing where the manufacturer’s instructions and a test report support it. When the fastener passes fully through that sheathing, allow at least 1/4 inch beyond its back face. Check R703.11.2 for foam. The R703.11.1 default uses a 0.120-inch nail shank and 0.313-inch head, or a 16-gage staple with a 3/8- to 1/2-inch crown. Default maximum fastener spacing is 16 inches for horizontal siding and 12 inches in both directions for vertical siding. Check product instructions and supporting tests for departures.
The VSI horizontal field example allows the panel to move:
- Center field fasteners in the slots. Follow the product’s separate details where a corner post hangs from a top slot or a roofline fastener directs movement away from the roof.
- Leave about 1/32 inch between the nail head and the hem in this example. Drive straight to prevent distortion.
- Start fastening at the center of the panel and work toward the ends, so the panel is not stretched.
- Panels must slide freely side to side after fastening.
- In this example, leave 1/4 inch at corner posts, J-channel and other stops, increasing to 3/8 inch below 40°F. Use the manufacturer’s gap for panels 20 feet or longer.
- Do not caulk where panels enter receivers, and do not caulk overlap joints.
VSI gives a sense of the movement involved. A 12-foot-6-inch panel can change length by 1/2 inch or more through normal seasonal temperature swings. Set the gaps and end laps for the actual profile and installation temperature, then check the completed panel can slide.
Check fastener compatibility with treated backing. R317.3.1 for preservative-treated wood and R317.3.3 for fire-retardant-treated wood in exterior or damp service generally use hot-dipped galvanized steel, stainless steel, silicon bronze or copper, with limited exceptions. R317.3 references ASTM A153 for zinc coating weight. The more specific R703.6.3 requires Type 316 stainless for fire-retardant-treated or pressure-impregnated preservative-treated shakes and shingles covered by that section.
Starter strips, corners, J-channels, backers
A vinyl starter strip supports the first course through its interlocking lower edge. In the VSI horizontal detail, hang each corner post from the top of the uppermost slot on either side, leave 1/4 inch at the soffit and extend it 3/4 inch below the starter strip where the termination allows. Center the other fasteners so the post can move. J-channel receives the cut ends around an opening. Preserve the channel’s drainage and install the required head flashing behind the trim system.
Backing at joints depends on the cladding. Under R703.5.2, vertical joints in wood, hardboard or wood structural panel siding ordinarily land over framing or qualifying wood sheathing and use a shiplap or batten. Use at least a 1-inch lap, a shiplap or Z-flashing at horizontal joints, and provide solid blocking or qualifying wood sheathing at the joint as required. In the prescriptive R703.10.1 fiber-cement panel detail, joints land over framing and use an allowed joint treatment, such as a batten, flashing, caulking or shiplap. Fiber-cement lap siding uses its own R703.10.2 treatment and approved instructions. Set backers before the wall is covered.
Soffit closes the underside of the overhang. R703.11.1.4 calls for individual panel fastening to supporting elements such as a nailing strip, fascia or subfascia, or as the product specifies. At a vented eave, keep insulation clear of the intake path. Fascia covers the edge framing at the eave. Coordinate the gutter support with the fascia or framing and carry the roof drip edge over the fascia detail.
A crew follows the VSI example for an ordinary horizontal vinyl field panel on a 70°F afternoon. How should it drive the fasteners?
Tight against the nail hem, centered between slots, to resist wind uplift
About 1/8 inch off the hem, at the end of each slot, so the panels hang plumb
About 1/32 inch off the hem, centered in the slots, so the panels can move side to side
About 1/4 inch off the hem, with washers under each head to spread the load
Under MRC R703.2, what laps are required for No. 15 asphalt felt applied as the weather-resistant barrier?
Upper layer lapped at least 2 inches over the lower layer, with joints lapped at least 6 inches
Upper layer lapped at least 6 inches over the lower layer, with joints lapped at least 2 inches
A single 12-inch lap at the top and bottom of each sheet, with butt joints between sheets
Laps are set by the siding manufacturer and are not specified in the code
Flashing integration (R703.4)
R703.4 requires approved corrosion-resistant flashing installed shingle-fashion. Wall flashing generally extends to the face of the finish. At windows and doors, follow the applicable manufacturer’s instructions or approved detail and drain to the exterior finish or the WRB as specified. The instruction-based fallback uses sill pan flashing and side and head protection where the directions lack the details. Other required locations include designated masonry intersections, copings and sills, above projecting wood trim, where exterior stairs, porches or decks attach to a wood-frame wall or floor, roof-wall intersections, and built-in gutters. Self-adhered wall flashing meets AAMA 711, and fluid-applied wall flashing meets AAMA 714.
For the drained flanged-window example in the WRB lesson, preserve the selected sill outlet and lap the head flashing over the jambs. For asphalt-shingle roof sidewalls, R905.2.8.3 requires base flashing at least 4 inches high by 4 inches wide. Direct the runoff clear of the wall at the lower end using the applicable diversion under R903.2.1. The 0.019-inch minimum for metal flashing in that roof provision applies to the roof detail. Use the approved wall and ledger flashings for their respective assemblies. Michigan Rule 523a details flashing over the attached ledger.
Weeps, vents, and the inspection list
Anchored masonry veneer drains through weep holes in the outside wythe: maximum 33 inches on center, at least 3/16 inch in diameter, located immediately above the flashing (R703.8.6). Veneer support, ties, and airspace are covered in Chapter 44; the masonry flashing and weep detail is developed in Chapter 45.
At a wall penetration, integrate the mounting block or flashable flange with the WRB. In a flanged detail, the upper drainage layer laps the upper flange so water can exit over the lower layer. Match the termination to the equipment. Michigan Rule 507 requires a backdraft damper and prohibits a screen at a dryer exhaust termination. Use the specified wall cap for a bath fan or the specified inlet and screen for outdoor air. Keep each terminal open and accessible.
Common failures to catch before the punch list:
- Vinyl nails driven tight or out of position, leaving panels pinned.
- Panels butted tight, or hung from fasteners instead of seated in receivers.
- Caulk smeared into panel-to-trim joints and overlap joints, trapping water and locking movement.
- Missing kick-out flashing at a roof-to-wall termination — the classic rotten corner.
- WRB lapped backwards (lower layer over upper) or cut away at penetrations.
- J-channel used as window flashing instead of a receiver.
- Butt joints between studs with no backer or flashing.
- Face-fastening outside the limited applications permitted by the instructions.
- Siding buried in grade, mulch, or a new patio pour.
- Soffit vents blocked by insulation, or head flashing omitted over a wide opening.
The eave of an asphalt-shingle roof intersects a vertical sidewall. Which detail at the bottom of the intersection directs runoff clear of the wall below?
A continuous J-channel run under the siding to catch and redirect the water
A second layer of housewrap taped to the siding above the intersection
A caulked seam where the siding meets the roof, renewed annually
Kick-out flashing that diverts water away from the wall at the bottom of the intersection
Sections you finish are checked off in the contents.