58.3 Excavation Safety (MIOSHA Part 9)
Key Takeaways
MIOSHA Construction Safety Standard Part 9 (R 408.40901 to R 408.40953, amended effective January 3, 2024) requires the side of an excavation more than 5 feet deep to be sloped to the angle of repose in Table 1 or supported, and requires effective protection at less than 5 feet whenever examination of the ground indicates hazardous earth movement.
For excavations employees must enter, keep excavated and other stored material at least 2 feet from the edge. An occupied excavation at least 48 inches deep needs the access in Rule 933, and lateral travel along a trench wall to egress cannot exceed 25 feet.
Michigan classifies soil as soft clay under 1.0 ton per square foot, medium or plastic clay at 1.0 ton per square foot minimum, firm clay at 1.5 tons per square foot minimum, stiff clay at 2.5 tons per square foot minimum, plus granular, organic, running, and fill soils -- Michigan Part 9 does not use the federal Type A, B, C labels.
Protective systems for excavations more than 20 feet deep must be designed by a registered professional engineer (Rule 942(8)), and support system designs must be kept at the jobsite with changes approved by a qualified person.
A competent person inspects continuously as work progresses and reinspects after each rainstorm or other hazard-producing occurrence. Stop work if inspection finds evidence of possible slides or cave-ins and add protection before resuming.
The Standard, and What Changed
Michigan regulates excavation under Construction Safety Standard Part 9, "Excavation, Trenching, and Shoring," R 408.40901 to R 408.40953. The part was amended by 2023 MR 24, effective January 3, 2024, and the current text matters because older study material still circulates with a federal accent that Michigan never adopted.
Two definitional anchors. Rule 925(1) defines the angle of repose as "the maximum permissible slope as determined by table 1," and Rule 925(5) defines the competent person as an individual capable of identifying existing and predictable hazards in the surroundings or working conditions and who has the authorization to take prompt corrective measures to eliminate them. That authorization clause is the heart of the standard: a field engineer who can only report a bad trench is not a competent person for purposes of Part 9.
Under Michigan Rule 927(3), a trench is an excavation deeper than its width measured at the bottom. If a form or wall creates a trench alongside the cut, Rule 932(5) directs the employer to apply Rules 941 through 944 to that space.
The Five-Foot Rule and the Slopes
Rule 941(1): the side of an excavation more than 5 feet deep must be sloped as prescribed in Table 1, unless supported as prescribed in the part. Rule 941(2) adds the trap: an excavation less than 5 feet deep must still be effectively protected when examination of the ground indicates hazardous earth movement may be expected. For instance, a shallow cut where soil is visibly sloughing needs protection even though it is less than 5 feet deep.
How do you slope it? Michigan does not import the federal Type A / Type B / Type C scheme. Rule 926(7) defines Michigan soil conditions:
| Michigan soil term | Defining criterion |
|---|---|
| Soft clay | Unconfined strength less than 1.0 ton per square foot |
| Medium (plastic) clay | Minimum unconfined strength of 1.0 ton per square foot |
| Firm clay | Minimum unconfined strength of 1.5 tons per square foot |
| Stiff clay | Minimum unconfined strength of 2.5 tons per square foot |
| Granular soil | Coarse-grained, no cohesion; strength from internal friction |
| Running soil | Insufficient strength to stand unsupported; sloughs as dug |
| Organic soil | Contains significant peat, muck, or marl |
| Fill | Manmade condition of any soil or combination |
The maximum allowable slope for each condition is read from Table 1 of the standard, which is published as a table in the rule. Do not substitute the federal appendix B angles for Table 1; Michigan's soil descriptors, and therefore Michigan's table, are different. Where different textured soils appear in the same face, Rule 932(1) requires each type to be cut to its own proper angle of repose, and the slope may not steepen between the toe of the slope and grade where soft clay or running soil lies in the lower cut.
Rule 944(1) requires the angle of repose to be flattened for water conditions, silty materials, loose boulders, erosion, deep frost action, or slide planes. Evaluate those conditions while the cut is open, especially when thawing can change the face.
Benching limits
When benching instead of sloping: the vertical rise may not exceed 5 feet and each step back must extend at least to the angle of repose (Rule 944(2)). When benching a trench, the lower bench height may not exceed the lesser of 5 feet or the trench width measured at the bottom (Rule 944(3)). No employee may work on a sloped or benched excavation at a level above another employee unless the lower worker is protected from falling, rolling, or sliding material (Rule 944(4)).
Shoring, Shields, and Deep Cuts
A support system is a structure such as underpinning, bracing, or shoring that supports an adjacent structure, an underground installation, or the sides of an excavation (Rule 926(10)). Under Rule 942(2) the support system must be designed by a qualified person, the design must be maintained at the jobsite, and any change from the design must be approved by a qualified person.
Other requirements engineers and foremen trip over:
- Tie backs restraining the top of sheeting must be anchored a minimum of 10 feet, measured from the intersection of the angle of repose with the retained soil surface (Rule 942(3)).
- Additional bracing is required when a new cut runs alongside a previous excavation or known fill, particularly when the separation is less than the depth of the excavation (Rule 942(6)).
- Excavations more than 20 feet deep require a protective system designed by a registered professional engineer (Rule 942(8)).
- Removal of a trench support system must progress with backfilling from the bottom of the trench, and in unstable or running soil the jacks and braces are removed from above the trench after employees have cleared it (Rule 943).
Trench boxes and shields may replace sloping or shoring if they provide protection equal to or greater than the required system (Rule 945(1)). Benching may be used with a box only when the toe of the box is not more than 2 feet above the trench bottom the box is designed for the full trench depth, and there is no indication of a possible cave-in below the box (Rule 945(2)). No employee may be inside a shield while it is being installed, removed, or moved vertically (Rule 945(3)), shields may not be loaded beyond design (Rule 945(4)), and employees must be protected from cave-in while entering and exiting the shielded area (Rule 945(6)).
Spoil, Egress, Equipment, Water, Air
Spoil and materials: 2 feet. For an excavation an employee is required to enter, Rule 933(2) requires excavated and other material to be stored and retained not less than 2 feet from the excavation edge. That is the minimum; with a surcharge from a concrete truck or a spoil pile five feet high, the number that matters is the one in the engineered protective system.
Egress: 48 inches and 25 feet. Rule 933(4) requires any occupied excavation 48 or more inches deep to have a ladder extending at least 3 feet above the top, or a compliant ramp, with lateral travel along the trench wall to egress not exceeding 25 feet. An earth ramp is allowed if it is stable, the sides above it are at the angle of repose or shored, the ramp angle is not more than 45 degrees, and the vertical height from trench floor to the toe of the ramp is not more than 30 inches (Rule 933(5)).
Mobile equipment. Where equipment operates next to an excavation and the operator's vision is restricted, Rule 933(3) requires stop logs, barricades, or a signal person.
Water. No employee may work in an excavation with accumulated water or accumulating water unless precautions are taken -- special support or shields, water removal, or a harness and lifeline (Rule 932(2)). If pumps control the water, a competent person or a monitoring system must watch the equipment (Rule 932(3)).
Atmosphere. Rule 934 requires testing before entry into excavations more than 4 feet deep where an oxygen deficiency (below 19.5 percent oxygen) or another hazardous atmosphere exists. Assess potential sources such as sewer tie-ins, landfills or nearby fuel storage. Prevent employee exposure to flammable gas concentrations above 20 percent of the lower flammable limit, and testing must be repeated as often as necessary while controls are in use.
Adjacent structures. Rule 953 requires protection of any structure adjacent to an excavation that goes below the level of its foundation or retaining wall, with the protection designed before excavation begins by a qualified person, and daily inspection of shoring, bracing, and underpinning. For work below a footing that could reasonably endanger employees, Rule 953(5) requires one of the listed conditions: adequate support, an excavation in stable rock, or a registered professional engineer's approval of the determination that the structure is sufficiently far away or that the work poses no hazard to employees.
Utilities. Rule 931 prohibits excavating in a street, highway, public place, or utility easement without first ascertaining the location of underground facilities, and requires hand digging where facilities will be exposed. The MISS DIG statute (Public Act 174 of 2013) sets the mechanics: call 811 with a dig notice at least 72 hours but not more than 14 calendar days before excavation, with nonbusiness-day hours excluded from the count; a ticket is valid 21 days (180 days if the notice states the work will not finish within 21 days). The caution zone is the area within 48 inches of either side of the facility marks, and the act requires soft excavation for exposure, agreement on protection if full exposure is impractical, and additional soft digging at suitable intervals when running parallel. Apply MIOSHA's hand-digging requirement separately in the settings covered by Rule 931.
Trench Scenario: 8-Foot Sewer Repair
A crew is replacing 40 feet of sanitary sewer in a residential street. The trench is 8 feet deep and 4 feet wide, cut in soft clay with seepage at the bottom, 12 feet from a 1940s house footing, with the sidewalk 6 feet from the edge.
- Locate first. Submit the ordinary dig notice, check positive responses and wait for the legal start. Hand-dig where public utility facilities are likely to be exposed under Rule 931, and protect them under the Act.
- Protective system. Eight feet exceeds 5 feet, and soft clay with seepage will not stand. Either slope to Table 1 with the flattening required by Rule 944(1), or install a designed shoring or shield system. The support system design stays in the truck or trailer at the site.
- Spoil and equipment. Spoil 2 feet back minimum; the excavator works from stop logs, a barricade or a signal person because the operator cannot see the near wall.
- Egress. Ladder within 25 feet of every worker, extending 3 feet above grade, because the trench is over 48 inches deep.
- Atmosphere. Sewer tie-in means testing before entry at more than 4 feet deep: oxygen at or above 19.5 percent, flammable gas below 20 percent of the lower flammable limit, repeat testing while the work continues.
- Adjacent structure. The trench bottom is below the house footing, so Rule 953 requires a protection design before digging and a PE-approved determination if the contractor wants to argue the house is unaffected.
- Sidewalk and pedestrians. Avoid undermining the sidewalk, or provide the protection required by Rule 951. Use a safe and accessible pedestrian route approved for the work zone.
- Traffic. Implement the approved temporary traffic control plan for site speed, traffic volume, visibility, access and pedestrian needs.
- Inspection. Competent person inspects at the start of each shift, after rain, and after any slide indication; work stops until shoring is added or the slope is reduced.
Daily Inspection Checklist
- Protective system matches the design and the design is on site.
- Excavated and other material at least 2 feet back for occupied work, with equipment, stockpiles and other loads allowed for in the protection design.
- Lateral travel along the trench wall to an exit is no more than 25 feet. Ladders extend at least 3 feet above the top, and ramps meet Rule 933.
- Water hazards controlled before entry and pumping monitored when used.
- Atmosphere tested where required and results recorded.
- Adjacent structures, sidewalks, and pavements supported and monitored.
- Cracks, tension cracks, bulging, subsidence, or sloughing reported and evaluated before re-entry.
- Utilities exposed and protected; caution zone respected.
- Barricades, covers, and warning signs in place; egress path clear.
A trench can collapse suddenly. Inspect around the work and keep employees within the protected area, including while entering and exiting.
An occupied trench is 6 feet deep. Under MIOSHA Part 9, which combination of protective and access measures is required?
No protective system, because sloping is only required at 8 feet; egress required at 5 feet
A protective system only if the competent person finds fissured clay, with egress within 50 feet
Protective system at 4 feet; ladder within 15 feet; spoil 5 feet back
A protective system because the cut exceeds 5 feet, plus a ladder or ramp within 25 feet of lateral travel because the trench is 48 inches or more deep
For an ordinary 18-inch-deep street trench, the contractor called 811 two days ago. Public utilities are marked and likely to be exposed. What must happen before powered excavation near the marked facilities?
Nothing further, because the trench is less than 5 feet deep and no protective system is required
Wait for the legal start and verify positive response. Use hand digging where public utilities are likely to be exposed and protect them before powered work.
A 30-day advance notice and a registered professional engineer's design for the trench
Only that the excavator notify the utility after any contact with a line