21.2 Plan Symbols & Legends

Key Takeaways

  • Use the sheet and discipline legends, schedules and notes. Common drafting standards illustrate conventions, and the actual project set identifies how its marks are used.

  • In a common hinged-door symbol the leaf line and swing arc locate the pivot and swing. Check the door and hardware schedules before framing or ordering.

  • Follow the view and sheet numbers on section, elevation and detail references, then check the detail title, limits and conditions.

  • A revision cloud and matching delta can identify a change. Verify that the sheet issue is authorized for the current work and that the change has any required permit approval.

  • Common abbreviations include O.C. for on center, TYP. for matching conditions in context, and N.T.S. for not to scale. Use the project legend and tied product information for marks such as R.O. and window size codes.

Last updated: November 2026

A Shorthand That the Legend Controls

Use symbols to find and connect information across a set. Drawing standards such as the National CAD Standard provide common conventions. Confirm how the particular project uses them through the cover, discipline and sheet legends, notes and schedules. When an unfamiliar mark affects the work and the set gives no interpretation, ask the issuer what it means.

Doors and Windows

A common hinged door symbol shows the leaf and a quarter-circle swing arc. The arc shows which side the door swings to and how far it travels; the point where the leaf line meets the wall is the hinge jamb. Use the pivot and arc to check the opening against a vanity, appliance or other obstruction. Use the hardware and door schedules to verify handing, latch location and any required reinforcement. Other drawing conventions include the following: double doors show two opposed arcs; sliding or bypass doors show offset parallel lines in the opening; a pocket door appears as a dashed leaf tucked inside the wall cavity, so check the pocket assembly clearance and coordinate utilities around the door’s travel; bi-fold doors show a zigzag; and an overhead garage door appears as a dashed rectangle with an arrow indicating travel.

Windows are drawn as a break in the wall with thin lines representing frame and glazing. For operation, glazing and opening information, follow the window mark (such as W-7) to the referenced schedule and product details.

Walls, Stairs and Cross-References

Walls may be drawn between face lines and shown with poché or fill. Confirm the assembly thickness and dimension references in the wall type and details. Existing, removed and new work can have distinct line types or tones. Verify the phase legend and demolition limits before removal.

Stairs appear as a series of parallel tread lines with a direction arrow labelled UP or DN. A diagonal break line shows where the flight continues beyond the floor being drawn. For example, a straight flight with 14 risers at 7-1/2 inches and 13 treads at 10 inches rises 105 inches and runs 130 inches between the first riser and the upper level’s riser. Compare rise to the scheduled finished levels and check the run and headroom at the opening. For ordinary straight treads, Michigan Rule 519 gives an 8-1/4-inch maximum riser and a 9-inch minimum tread. Check uniformity, nosing and the other applicable rules as well.

A section cut mark typically identifies the cutting plane, view direction and destination view or sheet. An elevation marker identifies a projected interior or exterior view using its direction and reference. Follow the legend to interpret the reference format and request a missing view when it is necessary to resolve the work.

Level tags are circles or hexagons carrying an elevation such as EL. +0'-0" or F.F.E. +0'-0", showing an elevation relative to a stated datum. A garage slab can have a different elevation on that same datum. North arrows establish orientation. Read the sheet note to learn which direction they reference. Revision clouds can outline changed areas. A triangle with a number or letter can cross-reference the dated revision block. Confirm the sheet’s issue and approval status before using the change. Keynote bubbles carry numbers keyed to a note list, usually on the same sheet. Grid lines are reference axes, often ending in labeled bubbles, used to locate elements such as beams or columns, and match lines tell you where an adjacent plan continues.

Plumbing, Electrical and Mechanical Symbols

Discipline legends can assign different meanings to similar symbols. On a plumbing sheet, examples include FD for a floor drain, WH for a water heater and fixture outlines keyed to the schedule. An electrical legend might show a duplex receptacle with parallel strokes inside a circle, or use separate marks for a switch, luminaire, panel and alarm. Read the circuit, ratings and device notes before confirming the hardware. On a mechanical sheet, look for diffuser or grille symbols, arrows indicating supply air throw where shown, and thermostat and equipment tags. Resolve ambiguous tags from the applicable legend and schedule.

Material hatches describe what a cut assembly is made of: stippled dots for concrete, diagonal lines for earth, a running-bond pattern for brick, block coursing for concrete masonry, wavy lines for batt insulation, grain lines for wood, and a grid or crosshatch for rigid insulation. Check the material legend and assembly callout for the actual material.

Symbol Table

The table below lists the symbols a residential contractor meets most often. Treat the drawn form as typical rather than universal, and always confirm against the project legend.

SymbolDrawn asMeansWhat to watch
Hinged doorLeaf line plus quarter-circle arcDoor and its swingHinge side, swing clearance, blocking
Pocket doorDashed leaf inside wall cavityDoor slides into wallVerify the pocket kit, fastener limits and clearance from utilities
Sliding / bypass doorOffset parallel lines in openingSliding panelsHeader and floor track
Bi-fold doorZigzag leaf linesFolding panelsClear floor space in front
WindowThin frame lines in wall breakGlazing in an openingType and size come from the window mark
StairParallel tread lines plus UP/DN arrowDirection of travelRiser and tread counts, headroom, floor opening
Section cutHeavy line, arrows, bubble with labelWhere the section is cutArrow direction and target sheet
Elevation markerTriangle or arrow with numberWhich projected view is referencedInterior or exterior view and its direction
Level tagCircle or hexagon with EL. or F.F.E.Height relative to a datumCompare garage slab and grade on the same datum
Revision cloud and deltaScalloped cloud plus numbered triangleChanged area and revision referenceConfirm authorized issue and any required approval
Revision blockTable at sheet edgeDate and description of each revisionCompare with addenda log
North arrowArrow with NPlan orientationConfirm the stated north reference
Duplex receptacleCircle with two parallel linesReceptacle type in the example legendCheck rating, protection, circuit and mounting
SwitchS or circle with a tickLighting controlThree-way and dimmer annotations
Ceiling luminaireCircle with a crossLight fixtureCross-check the fixture tag and schedule
Smoke deviceCircle tagged SD in one possible legendSmoke detection or alarm device as scheduledVerify device type, power and interconnection
Floor drainCircle with diagonal or FDDrain pointSlope direction on the plan
Water heaterCircle or tank marked WHWater-heating equipmentType and installation clearances or connections
Supply diffuserSquare or rectangle with arrowHeated or cooled air outletThrow direction and balancing
ThermostatT or STATTemperature controlLocation relative to returns
Match lineDashed line with labelDrawing continues elsewhereDo not double count the overlap

Reading a Reference Across Sheets

Begin with the legend for the view. A door mark on the floor plan leads to the door schedule for the opening and handing, while a hardware tag can lead to a separate schedule. Read the note on the source view, then check the destination view or schedule for scope and issue date. If a new wall changes the door swing, verify that the coordinated issue updates the necessary drawings and approvals before framing.

Abbreviations That Change a Dimension

Abbreviations are the most common source of expensive misreading, because a two-letter suffix can change whether you order 12 units or 13, or whether a number describes a finished surface or a rough opening.

AbbreviationMeaningWhy it matters
O.C.On centerSpacing measured center to center, not clear distance
TYP.TypicalThe condition repeats without a new callout
U.N.O.Unless noted otherwiseApplies within the scope of the note unless overridden
E.W.Each wayReinforcement or framing in both directions
R.O.Rough openingCheck the approved opening and product instructions
F.F.E.Finished floor elevationFinished surface height relative to the stated datum
A.F.F.Above finished floorHeight of an item measured from the floor surface
N.T.S.Not to scaleNever scale this view; use the printed numbers
B.O.F.Bottom of footingDepth reference for excavation and concrete
FDN.FoundationSheet or note prefix
FTG.FootingConcrete element below the foundation wall
P.T.Pressure treatedVerify whether the exposure requires treated or durable wood under R317
SIM.SimilarClose to, but confirm the referenced detail
V.I.F.Verify in fieldCheck the field condition and resolve any effect on the design
CL.CenterlineReference line for layout
U/SUndersideUnderside of beam, stair or deck framing
EXIST.ExistingPresent condition. Check the drawing for whether it remains.
REV.RevisionTies a cloud to the revision block
MFR.ManufacturerRead the complete manufacturer and product reference
GWBGypsum wallboardDrywall assembly designation

Worked Example: Decoding a Sheet Note

A project’s framing and finish notes refer to the window schedule and detail sheet.

2x10 DF-L #2 @ 16 in. O.C. TYP. — 1/2 in. GWB U.N.O. — W-7 ADH3050, R.O. 3 ft × 5 ft — SIM. TO 4/A-6 — BEAM BEARING V.I.F.

  1. 2x10 DF-L #2 specifies nominal 2 by 10 members of the Douglas Fir-Larch species group and No. 2 grade in this example. Match the required grade and species group when ordering.
  2. @ 16 in. O.C. TYP. means 16 inches from one joist center to the next in the matching bays. If the first and last centers are exactly 12 feet apart, 144 ÷ 16 = 9 intervals, or 10 centers. A count from outside faces, or a layout with rim, doubled or opening members, needs its own takeoff.
  3. 1/2 in. GWB U.N.O. gives the default gypsum board thickness for the surfaces covered by the note. A different assembly called out in one room changes the requirement where that note applies.
  4. W-7 ADH3050 ties the window mark to the specified product. For the example Andersen A-Series double-hung unit with Stormwatch protection, the size chart lists unit dimensions of 2 ft 11-1/4 in. by 4 ft 11-1/4 in. and a minimum rough opening of 3 ft by 5 ft. This size code identifies a particular product entry. Verify the approved series, clearance, opening and installation details before framing or ordering.
  5. SIM. TO 4/A-6 leads to detail 4 on sheet A-6. Compare the shown head, jamb and flashing with the actual condition and resolve any material difference before building.
  6. BEAM BEARING V.I.F. asks the crew to measure the existing bearing condition. Compare the result with the structural details. Send mismatches or missing design information to the responsible designer before pricing or installing the beam.

The note connects framing, finish, product data, details and field information. Use the product and detail references for their respective questions, then record the resolved condition on the issued set.

Test Your Knowledge

On this framing plan the legend defines TYP. as applying to matching bays. What does the joist note 2x10 @ 16 in. O.C. TYP. specify?

A

Two 2x10 members for every 16 feet of wall

B

Nominal 2x10 members at 16 inches center to center in the matching bays

C

A nominal 2x10 member with a maximum span of 16 feet

D

Sixteen 2x10 members in the whole room

Test Your Knowledge

The legend identifies revision changes with a cloud and numbered triangle. The triangle at a wall is 3. Revision 3 in the sheet history describes a wall relocation. What does this establish?

A

The clouded wall was changed under revision 3. Verify the current authorized issue before building it.

B

The cloud requests a field measurement of the wall thickness

C

The cloud is a section cut referencing section 3

D

The cloud locates structural grid line 3

Test Your Knowledge

On a basement plumbing plan, the legend’s drain-symbol entry matches the circle marked FD beside the water heater. A mechanical sheet in the same set uses FD for a fire damper. What does the plumbing mark locate?

A

A furnace disconnect

B

A fire damper

C

A floor drain

D

A forced-air duct terminal