52.3 Installation & Flashing of Windows, Doors & Skylights
Key Takeaways
MRC R609.1 requires exterior windows and doors to be installed and flashed in accordance with the fenestration manufacturer's written instructions and the opening flashed per R703.4, and it requires the manufacturer to supply those instructions.
R703.4 requires approved corrosion-resistant flashing applied shingle-fashion, extended to the exterior finish or to the water-resistive barrier for drainage, at every exterior window and door opening.
Under the R703.4 instruction-based route, use pan flashing at the sill when neither applicable instruction set provides a detail. Drain it to the finish or WRB and protect the head and sides.
In a selected WRB-first, drained flanged-window detail, the pan drains out and the head flashing laps the jamb flashing. The upper WRB flap laps over the head flashing.
Follow the product’s exterior sealant pattern and preserve the designed drainage outlet. At a roof pitch below 3:12, R308.6.8 calls for a curb at least 4 inches above the roof plane unless the skylight instructions specify otherwise.
The rules that govern the opening
Under MRC R609.1, follow the fenestration manufacturer’s written installation and flashing instructions for exterior windows and doors. Flash the opening under R703.4 as well. The unit manufacturer provides written instructions for each window or door. Check those instructions for compatible materials, fastener locations, sill pan and sealant details.
R703.4 calls for approved corrosion-resistant flashing installed shingle-fashion. For exterior openings, drain to the finish or WRB. When used, self-adhered membranes follow AAMA 711, mechanically attached flexible flashing at these openings follows AAMA 712, and fluid-applied wall flashing follows AAMA 714. Use the fenestration instructions and the flashing manufacturer’s details where the fenestration instructions leave an application open. If neither supplies a detail, R703.4 Item 1.1 calls for a draining sill pan and protection at the head and sides. A registered design professional’s flashing design or another approved method is a separate route.
A draining pan collects sill water and directs it to the face of the finish or the WRB. This example uses DuPont Tyvek and FlexWrap with a compatible integral-flanged window installed after the WRB. Select the drained version of the detail and verify the unit maker’s instructions before installing.
The sequence, in order
| Step | Work | What to verify |
|---|---|---|
| 1 | Prepare the opening in the WRB. | Repair damage and retain the upper flap for the head lap. |
| 2 | Measure the rough opening and check plumb, level and diagonals. | Match the size and tolerances for the unit. |
| 3 | Flash the sill and turn the membrane up the jambs. | Preserve the pan outlet. |
| 4 | Apply the exterior sealant pattern, set and shim the unit. | Keep the flange and frame straight. Use the specified supports. |
| 5 | Fasten per the unit instructions. | Confirm location, spacing and anchorage before covering. |
| 6 | Flash jamb flanges first, then the head over the jamb flashing. | Preserve upper-over-lower laps. |
| 7 | Return the upper WRB flap over the head flashing. | Tape the diagonal cuts and seal the flap as directed. |
| 8 | Check sash operation and install the interior perimeter air seal. | Keep the separate exterior outlet open and recheck operation before trim. |
Prepare the WRB. DuPont’s integral-flanged window example cuts the wrap at the opening, folds the jamb flaps into the opening and temporarily folds the diagonal-cut head flap up. Leave the lower WRB available for the pan’s exterior lap. Check the window maker’s rough-opening width, height and squareness tolerances before cutting or adding shims.
Form the pan. The cited detail turns FlexWrap at least 6 inches up the jambs and out onto the lower WRB. For a different assembly, use the specified compatible pan, slope or back dam. The R703.4 fallback requires the pan to be sealed or sloped so water can drain to the exterior finish or WRB.
Set the unit. In the drained version of this DuPont example, seal the head and jambs and keep the sill outlet open. Follow the exact unit guide for the sealant locations, shims, flange holes, fastener type and anchorage. Use approved fasteners where the instructions place them and avoid overtightening that distorts the flange or frame.
Complete the drainage laps. Take the jamb flashing above the top flange and overlap it with the head flashing. Lower and seal the upper WRB flap over that head flashing. Seat self-adhered flashing using the pressure and tools the maker specifies. DuPont allows firm hand pressure or a suitable roller for the cited flashing application.
Check before trimming. Operate and latch the window after positioning and again after fastening and air sealing. Where specified, integrate the metal drip cap with the WRB and jamb flashing. Photograph the sill outlet, fastener layout and head lap while they are still visible.
In the WRB-first drained flanged-window detail described here, which layer laps over the side jamb flashing?
The sill pan membrane
The head flashing, followed by the upper WRB flap
The interior casing
The sealant bead at the sill flange
Doors and thresholds
For example, JELD-WEN JII106 uses a draining sill pan for a prehung exterior entry door. In the rigid-pan detail, put the continuous sealant bead along the interior upturned leg and end dams, and confirm the back dam seals to the inside face of the sill. Follow its separate sill-shim instructions for the threshold system, including exceptions for the positively sloped pan and ADA sill. Support the jambs and fasten where directed, then check the door reveal, latch and sweep. Preserve the outlet at the step-down landing. Exterior casing such as brickmold may arrive attached. Integrate its head and side flashing and sealants with the WRB as the product directs.
Skylights and curbs
For unit skylights on a roof below 3:12, MRC R308.6.8 calls for a curb projecting at least 4 inches above the roof plane unless the manufacturer’s installation instructions specify otherwise. Select the unit, curb and flashing kit for the roof covering and pitch. In the VELUX ECL curb-mounted step-flashing example, integrate the approved adhesive underlayment, place the low-side sill flashing over the roofing, weave side steps into the courses, then lap the upper roofing over the head or saddle flashing. Keep fasteners at the illustrated locations.
A deck-mounted unit attaches to the roof deck. Its flashing sequence and pitch limits come from the selected unit and kit. The VELUX EDL deck-mounted example is designed for thin roof coverings and starts at 14°, given as 3:12 in its instructions. A 2:12 roof is below that published range. Where the local ice-barrier designation and R905.1.2 apply, maintain the required roof membrane coverage and integrate it at any skylight it reaches with the approved flashing detail.
Sealants, foams and the rules for both
Use sealant compatible with the flashing, frame and adjacent insulation. Prepare the surfaces and tool or press each material as directed. At the interior frame-to-opening gap, use compatible low-expansion window-and-door foam or backer rod and sealant at the air-control line. Overfilling foam can bow a jamb. Keep exterior weeps and the specified sill outlet open.
Common failures
| Failure in the selected detail | What to investigate |
|---|---|
| Required pan or jamb returns omitted | Moisture at the rough sill and lower corners |
| Upper WRB behind head flashing | Water tracking behind the head flashing and into the opening |
| Sill outlet or frame weep blocked | Water retained in the pan or window track |
| Fastener outside the specified position | Damaged flashing, restricted drainage or a distorted flange |
| Jamb flashing terminates behind the pan | Water bypassing the pan at a lower corner |
| Skylight flashing kit mismatched to roof or pitch | Vulnerable laps and drainage at the roof opening |
Inspection points
Check the WRB laps, the opening and unit alignment, and the specified pan, outlet, fasteners and flashing. For the window example, trace the upper WRB over the head and the head over the jambs. At the door, check threshold support and operation. At the skylight, check curb height where applicable, the kit and roofing laps. At each opening, confirm the interior air seal and drainage outlet before covering.
Under R703.4 Item 1.1, neither applicable instruction set has a flashing detail for the opening. What detail is required at the sill?
Seal all four flanges and rely on the WRB
Install head flashing only
Install pan flashing, sealed or sloped to drain to the exterior finish or WRB, with flashing or protection at the head and sides
Fill the rough opening with expanding foam
What does head flashing do in the drained window detail?
It receives water from above the opening and laps it onto the next exterior drainage surface
It stiffens the header above the opening
It satisfies the emergency escape opening requirement
It replaces the water-resistive barrier at the opening
Sections you finish are checked off in the contents.