45.3 Masonry Flashing & Weep Holes

Key Takeaways

  • In a drained veneer wall, the water-resistive barrier, airspace sized for the tie system, flashing and weeps form a path to the exterior.

  • R703.4 covers flashing protection at openings and intersections. R703.8.5 also requires flashing beneath the first masonry course above finished ground level and at other veneer supports.

  • R703.8.6 sets outside-wythe weeps at most 33 inches on center and at least 3/16 inch in diameter, immediately above the flashing. BIA recommends open head joint weeps at most 24 inches on center.

  • Use the specified compatible laps, backing attachment, end dams and UV protection so water stays on the flashing and reaches an exposed outlet.

  • Check R1003.10.1 for masonry veneer on a framed chimney. R1003.20 requires a cricket for a chimney wider than 30 inches parallel to the ridge if it does not intersect the ridge.

Last updated: November 2026

Follow the Cavity Drainage Path

Rain can pass through a brick wythe. In a drained veneer wall, the water-resistive barrier (WRB) protects the backing, the clear airspace gives water a route downward, and through-wall flashing collects water and directs it to weep holes immediately above the flashing. Size the airspace using the backing and tie detail in 2015 MRC R703.8.4. For example, the table lists a nominal 1 inch between sheathing and veneer for corrugated ties on wood framing. R703.8.4.2 gives a separate grouted-back detail with its own WRB requirements. Michigan Rule 545 provides typical wall and shelf-angle details.

Select and Install Through-Wall Flashing

2015 MRC R703.4 requires approved corrosion-resistant flashing layered to shed water. The general provision carries it to the exterior finish. The opening-specific provision also allows drainage to the WRB. Self-adhered flashing must comply with AAMA 711-13. Fluid-applied flashing for exterior walls must comply with AAMA 714-12, and mechanically attached flexible flashing at window and door openings with AAMA 712-11.

Use a compatible flashing product specified for the exposure and substrates. Examples in BIA Technical Note 7A include stainless steel, copper composites, and purpose-made flexible rubber and rubberized-asphalt products. Use the specified primers, adhesives and sealants. BIA advises against using sheet polyethylene, building paper or housewrap as through-wall flashing. Protect a UV-sensitive membrane at the wall face with a durable compatible drip edge.

  • Support the flashing across the cavity as detailed. Bring it to the outer face and turn it up at the backing. BIA Technical Note 7 recommends an 8-inch upturn at typical wall flashing. Integrate the top with lapped sheet WRB, the specified fluid-applied transition, or the approved sealed attachment. A termination bar can hold flexible flashing at a suitable backing when the detail calls for one.
  • Seal overlaps with a compatible product. BIA recommends at least 6 inches for conventional flexible flashing laps. BIA gives 3 to 4 inches as a typical lap for self-adhered products. Follow the specified product detail. At a step in grade or support, coordinate the transition with the finished grade and maintain a continuous sealed path to an exposed outlet.
  • At a discontinuous termination, BIA recommends turning the flashing up at least 1 inch to form an end dam. At the head of an opening, coordinate the projection past the jamb and the dam with the lintel, WRB, and adjacent outlets so that water cannot run off the sides into the wall.

Weep Holes, Vents, Wicks and Tubes

R703.8.6 sets three checks for weep holes in the outside wythe. The spacing is at most 33 inches on center, the diameter is at least 3/16 inch, and the location is immediately above the flashing.

BIA recommends open head joint weeps at least 2 inches high and at most 24 inches on center. Screen or mesh inserts can address insects where specified. Verify that they preserve the drainage opening. BIA recommends a length of at least 16 inches for wicks and advises against tubes because they are prone to clogging. If either is used, BIA recommends spacing no more than 16 inches on center. Clean out mortar before covering the flashing and confirm each outlet is open. A specified drainage or mortar collection device can help preserve outlets. Keep droppings from bridging the cavity even when using one.

On a wall with open head joint weeps every 24 inches, check their height and look for the flashing directly below them. A row 40 inches on center exceeds the code spacing. A row 24 inches on center a full course above the flashing fails the placement check. Locate the flashing before clearing or adding any outlet so the repair preserves the membrane.

Check Flashing at Each Location

LocationDetail to verify2015 MRC
Base above foundation wall or slabFlash under the first masonry course above finished ground. Set weeps in the outside wythe directly above the flashing.R703.8.5–R703.8.6
Structural floors, shelf angles, lintels and other veneer supportsFlash at the support and carry collected water out.R703.8.5
Exterior windows and doorsFollow the applicable installation or approved design detail and use the sill-pan fallback where required.R703.4 item 1
Masonry where it meets frame or stucco wallsFlash the intersection. Under stucco copings, extend the lips on both sides.R703.4 item 2
Masonry, wood or metal sills and copingsFlash beneath them and at their ends.R703.4 item 3
Projecting wood trimFlash continuously above it.R703.4 item 4
Porch, deck or stair connection to wood framingFlash where the connection meets the wall or floor framing.R703.4 item 5
Wall-to-roof intersections and built-in guttersContinue the roof and wall drainage layers at their intersections. Flash built-in gutters.R703.4 items 6–7
Masonry veneer of a framed chimneyInstall through-flashing and weeps as required by R703.R1003.10.1

For exterior windows and doors, R703.4 allows flashing per the fenestration manufacturer's details, then the flashing manufacturer's instructions if the fenestration instructions omit that application. It also permits a registered design professional's design or another approved method. Under the instruction-based route, if neither instruction supplies a detail, use a sill pan sealed or sloped to direct water to the exterior finish or the WRB. Provide flashing or protection at the head and sides of a pan-flashed opening. This detail coordinates with flashing at the veneer sill and lintel. Keeping the head and sill drainage paths continuous across the change of materials helps water escape.

Check the Chimney and Roof Together

Michigan Rule 547b amends the chimney cap provision and adds Figures R1003.9.1(1) and (2). Its masonry chimney detail shows noncombustible through flashing and weeps, along with step flashing and counterflashing. These protect different points along the drainage path. Under R1003.20, a chimney measuring more than 30 inches parallel to the ridge needs a cricket if the chimney does not intersect the ridge. Flash and counterflash the cricket-to-chimney junction. R903.2.2 gives the separate roof provision for crickets or saddles, with the width measured perpendicular to the slope.

Check the backing attachment and WRB integration before it is concealed. At the base and each support, follow the flashing across the airspace, inspect seams and end dams, and make sure the discharge reaches the exterior above the grade or obstruction. Michigan's severe weathering exposure underscores the importance of this inspection. Trapped moisture can increase the risk of frost damage to brick, corrosion of steel and moisture damage at the backup. The useful field check is whether water can travel through each part of the drainage detail without collecting behind a blocked outlet.

Test Your Knowledge

Under 2015 MRC R703.8.6, what is the maximum weep spacing in the outside wythe of anchored masonry veneer?

A

16 inches on center

B

33 inches on center

C

24 inches on center

D

48 inches on center

Test Your Knowledge

Under 2015 MRC R703.8.6, what is the minimum diameter of a weep hole in the outside wythe of masonry veneer?

A

3/16 inch

B

1/8 inch

C

1/4 inch

D

3/8 inch

Sections you finish are checked off in the contents.