49.3 Energy Code Certification
Key Takeaways
Use Michigan’s county table and amended component or assembly criteria. Keep climate, jurisdiction and edition with the project inputs.
The ceiling table value is R-38 in Zone 5A and R-49 in Zones 6A and 7. The prescriptive attic allowance has full-coverage and eave-depth conditions.
Total UA uses actual assembly U-factors, framing paths and component areas. Document all applicable components and still meet the mandatory provisions.
Post the builder or design professional’s certificate on or in the panel without covering required labels. Installer documentation serves a separate purpose.
The prescriptive blower-door limit is 4 ACH50, measured after envelope penetrations have been made and documented in a signed report.
Michigan Residential Energy Compliance
Use Chapter 11 of the 2015 Michigan Residential Code and the applicable Michigan amendments. Chapter 11 covers the enclosure, mechanical and service systems, lighting, compliance paths and documentation. LARA identifies the 2015 residential provisions as remaining in effect while implementation of the later residential and energy rule sets is stayed. The state uses the county assignment in Table N1101.10. For example, Kent is Zone 5A, Grand Traverse is Zone 6A and Chippewa is Zone 7. Verify the actual county from the table before submitting a design.
Michigan Table N1102.1.1 Component Values
| Zone | Fenestration maximum U | Skylight maximum U | Minimum ceiling R | Wood-frame wall R | Mass wall R | Floor R | Basement wall R | Slab edge R and extent | Crawl wall R |
|---|---|---|---|---|---|---|---|---|---|
| 5A | 0.32 | 0.55 | 38 | 20 or 13 + 5 | 13/17 | 30 | 10/13 | 10, 2 ft | 15/19 |
| 6A | 0.32 | 0.55 | 49 | 20 or 13 + 5 | 15/20 | 30 | 15/19 | 10, 4 ft | 15/19 |
| 7 | 0.32 | 0.55 | 49 | 20 or 13 + 5 | 19/21 | 38 | 15/19 | 10, 4 ft | 15/19 |
The fenestration column excludes skylights. The amended component table has no SHGC column. In the mass-wall column the second value applies where more than half of the insulation is on the interior. For 13 + 5, the second number means continuous insulation or qualifying insulated siding. The limited sheathing adjustment permits a reduction of at most R-3 at the sheathed locations where structural sheathing covers no more than 40 percent of the exterior and the adjustment keeps the total sheathing thickness consistent. The 10/13 and 15/19 foundation entries distinguish continuous insulation on the interior or exterior from cavity insulation at the interior. The 15/19 entry also permits R-13 interior cavity plus R-5 continuous. The floor footnote permits insulation filling the cavity at a minimum of R-19. Heated slab edges require an added R-5. Where insulation is installed at less than its labeled or designed thickness, use its installed R-value.
For a ceiling with an attic on the prescriptive R-value path, N1102.2.1 permits R-30 for a table value of R-38, or R-38 for a table value of R-49, when the substitute covers all ceiling area requiring insulation and extends at full uncompressed depth over the wall top plate at the eaves. For a ceiling without attic space where the design cannot fit the required insulation, N1102.2.2 provides a separate R-30 allowance limited to the lesser of 500 ft² and 20 percent of the total insulated ceiling area.
Choose and Document the Compliance Path
- Component R-value. Use qualifying installed insulation layers. For blown insulation, use the product's settled R-value at the specified application. Air films and other building materials do not add to this component insulation sum.
- Assembly U-factor. Compare the proposed whole assembly with the corresponding limit. Include framing bridges and the relevant complete assembly. In Michigan's table the Zone 5A ceiling limit is U-0.030 and the wood-frame wall limit is U-0.057.
- Total UA. Compare the proposed sum of assembly U-factor times area with the reference sum using corresponding Michigan values and the same areas. Include framing bridges under a method consistent with ASHRAE Fundamentals. Mandatory requirements still apply.
- Simulated performance. Section N1105 compares the proposed building with a standard reference design. Submit the approved report and the actual system and enclosure inputs.
- Energy rating index. Section N1106 uses an approved third party and the state table's maximum ERI of 55 in Zone 5, 54 in Zone 6 and 53 in Zone 7. Check the mandatory requirements and the state's 2009 IECC envelope baseline under N1106.2.
Use the plans, listed fenestration ratings and the required calculations for the chosen route. Confirm that the code official accepts the tool and that its inputs represent the state edition and amendments. A whole-envelope calculation and a component table have different scopes.
Worked Example: Zone 5A UA Trade-Off
Compare four envelope components in a Zone 5A design. The example uses 1,800 ft² of net framed wall area with the 300 ft² of windows counted separately. The reference inputs come from the Michigan rules, including U-0.32 for windows under Part 10 Rule 1065. Assume an accepted assembly calculation gives U-0.024 for the complete proposed ceiling and U-0.060 for the complete framed wall. These factors already account for framing and are stated inputs. The ceiling's nominal insulation R-value alone cannot establish its U-factor.
| Assembly | Area (ft²) | Reference U | Reference UA | Proposed U | Proposed UA |
|---|---|---|---|---|---|
| Ceiling | 1,400 | 0.030 | 42.0 | 0.024 | 33.6 |
| Framed wall | 1,800 | 0.057 | 102.6 | 0.060 | 108.0 |
| Basement wall | 800 | 0.059 | 47.2 | 0.059 | 47.2 |
| Windows | 300 | 0.32 | 96.0 | 0.30 | 90.0 |
| Four-component subtotal | 287.8 | 278.8 |
The proposed wall adds 5.4 Btu/h·°F. The ceiling saves 8.4 and the windows save 6.0, making the subtotal 9.0 Btu/h·°F lower. If the other applicable envelope terms agree on both sides, the same difference carries to the whole calculation. Use the actual geometry and include every applicable component in the final submittal. This subtotal alone establishes no whole-building approval. Apply the separate fenestration trade-off limits, including N1102.5 where applicable, and the mandatory installation and leakage provisions. The attic prescriptive R-value reduction does not enter the assembly U-factor or total-UA alternatives.
Certificate, Installer Evidence and Inspection
Permanent certificate. Michigan Rule 547c, N1101.16, requires the builder or registered design professional to complete the certificate and post it on or in the electrical distribution panel. Keep the circuit directory, service disconnect and required labels visible. Record predominant insulation R-values for roof or ceiling, walls, foundation components and ducts outside conditioned space, plus fenestration U-factors. When multiple values occur in a component, list the value covering the largest area. Record heating, cooling and service water-heating equipment types and efficiencies. List a gas-fired unvented room heater, electric furnace or electric baseboard heater by the applicable type without assigning an efficiency under this provision.
Installer records. Michigan N1101.12.1 uses the insulation identification marks or an installer certification to document what was installed. Section N1101.12.1.1 governs depth markers. The certification lists the type, manufacturer and R-value for the applicable envelope elements. For blown or sprayed fiberglass or cellulose, record initial depth, settled depth and R-value, installed density, coverage and bag count. For sprayed polyurethane foam, document installed thickness and R-value. Sign, date and post the applicable certification at the job site. Use attic depth markers for blown or sprayed fiberglass or cellulose roof-ceiling work, at least one per 300 ft², attached to the framing facing the attic access, with minimum initial depth marked in digits at least 1 inch high.
Inspection. Coordinate the inspection while identification, installation, depths and air-barrier details remain visible. Follow the enforcing agency's sequence for exterior insulation before backfill and for wall or ceiling insulation before concealment. Rule 509a bars proceeding past a required inspection point without approval.
Prescriptive blower door. Rule 547d's N1102.4.1.2 sets a maximum of 4 air changes per hour at 50 Pa. Test after all enclosure penetrations are created. Close exterior openings and dampers without adding seals beyond intended controls, close and seal exterior openings of the specified continuous ventilation systems, open interior doors, turn off heating and cooling, and open supply and return registers. The tester signs the report for the code official. The official can require a certified independent third party.
Where does Michigan N1101.16 require the permanent energy certificate and what information does it include?
Only in the permit file, recording the permit number.
On or in the electrical distribution panel, with predominant R-values, fenestration U-factors and equipment information.
At the attic hatch, with only the ceiling insulation value.
On the furnace, with only the heating efficiency.
What is Michigan’s prescriptive maximum envelope air leakage in the N1102.4.1.2 blower-door test at 50 pascals?
2 air changes per hour at 50 pascals
3 air changes per hour at 50 pascals
5 air changes per hour at 50 pascals
4 air changes per hour at 50 pascals
What ceiling insulation R-value does Michigan Table N1102.1.1 list for Zone 6A, before using any separate ceiling allowance?
R-38
R-30
R-49
R-60
Sections you finish are checked off in the contents.