10.3 Customer Service & Jobs Administration

Key Takeaways

  • State one point of contact, an update schedule and a response time so the customer knows who handles changes and when to expect a reply.

  • Put signed agreements and changes in writing and give the customer copies. MCL 339.2411(2)(d) addresses willful, material and prejudicial departures from plans or specifications without the required consents.

  • MCL 339.2411(1) requires complaints to be made within 18 months after the latest of completion, occupancy or purchase under an M&A contract, or after the later of CO or temporary CO issuance and closing when the project requires an occupancy permit.

  • After receiving the forwarded complaint, the licensee must reply to LARA within 15 days, confirming or denying justification. Failure to correct a materially deficient, dangerous or hazardous structural matter can trigger the presumption in R 338.1551(4).

  • Direct advertising generally requires the licensed name, number and actual business address. R 338.1532 provides an exception for certain licensed-broker advertising and bars specified contingent bonuses when soliciting home-improvement contracts.

Last updated: November 2026

Communication is part of the work

A slipped schedule, unsigned price change or unanswered call can be a problem even when the work is sound. Explain at signing how the homeowner can get updates, who responds to changes and who can authorize them.

The communication plan

A written communication plan given at contract signing sets expectations before anything goes wrong:

  • Point of contact. Give the homeowner the project representative’s name and a response window. One business day is an example service target.
  • Updates. Agree on frequency and cover completed and upcoming work, decisions and any effect on time or cost.
  • Selections. Set decision dates from actual lead times and planned installation. Identify which activities depend on each selection.
  • Changes. Record the request and route it to the person who can authorize the work under the agreement.

Identify when inspections, supplier lead times and owner selections affect the schedule. For example, if the cabinet delivery moves past the scheduled installation, explain which tasks can still proceed, which tasks depend on the cabinets and when you will confirm a revised sequence.

Change-order discipline

A change order is a written amendment recording the added or deleted scope, price and schedule effect. Have the parties to the agreement sign it and give the customer a copy.

  1. Obtain the signed change order before performing changed work. If an immediate hazard arises, take necessary protective measures and document them. Authorize any resulting scope change in writing.
  2. Price the whole change, including labor, material, overhead and profit. Identify associated schedule changes.
  3. Keep a record of decisions, including proposed changes the customer declined.

R 338.1533 requires the builder or contractor and customer to sign written agreements and changes and requires copies for the customer. For construction, clearly state the plans and specifications, scope, cost, and type and quality of materials. Rule 33(3) provides a limited plans-and-specifications delivery exception for certain already substantially completed or model-conforming new structures if properly identified and written changes are agreed. A willful, material and prejudicial departure without the consents specified in MCL 339.2411(2)(d) can support discipline. Under MCL 570.1114 a contractor claiming a lien on a residential structure needs a written contract and written changes, with prescribed license disclosures where applicable.

Jobsite conduct and cleanliness

Discuss occupied areas, shutoffs, site access and protection before work. Use a written plan for the parts of the home the family will continue to use.

  • Remove debris and protruding fasteners, keep routes clear and check the work zone before leaving.
  • Agree on how the crew will protect existing finishes, landscaping and the occupied side of the home. Use the controls required for the work involved.
  • Notify the household before utility interruptions and provide an agreed route to any essential facilities that remain in use. If access cannot be maintained safely, agree on a temporary arrangement.
  • Secure openings, tools and materials, and keep children, pets and other occupants out of the active work area.

Use dated records to show existing and later conditions. For example, document a pre-existing driveway crack before a delivery truck arrives and record any change afterward.

The complaint ladder

Respond promptly, assign responsibility for the issue and document the steps toward resolution. The timings in this table are example service targets.

StepActionTiming
RespondAcknowledge the report, name the contact and identify any immediate safety concernSet a service target, such as one business day
InspectArrange access, record observations and involve the responsible trade or design professional when neededChoose a time based on urgency and access
RemedyAgree in writing on scope, authorization, access and the work or review dateConfirm before promising a completion date
CloseVerify the result, record any agreement and provide the closeout informationWhen the work has been verified
EscalatePreserve applicable complaint deadlines while using available contract or agency proceduresCheck the relevant statutory trigger

For example, if the owner reports water at a new window, arrange an inspection, record the weather and visible conditions, and protect the opening pending evaluation. Compare the installed details with the approved documents and product instructions. Confirm in writing who will correct the work and how it will be checked before closure.

The LARA complaint process

A homeowner may file a complaint against a licensed residential builder or maintenance and alteration contractor with the Michigan Department of Licensing and Regulatory Affairs. BCC investigates potential licensing violations. Use the contract or other appropriate process for ordinary payment and warranty disputes.

  • Filing window. MCL 339.2411(1) gives 18 months. For a maintenance and alteration contract the listed dates are completion, occupancy and purchase, using the latest. For a project requiring an occupancy permit, use the later of issuance of the certificate or temporary certificate and closing.
  • Forwarded complaint. Use LARA’s specified form. Under R 338.1551, LARA assigns a number, acknowledges a valid written complaint and forwards it. The licensee has 15 days from receipt to tell the department which parts it considers justified. LARA advises the complainant of a disagreement.
  • Workmanship proceedings. Under §2411(4)(a), the homeowner describes the factual basis to the department and sends the initial complaint to the licensee at the same time. After an authorized inspection report verifies the allegation, LARA sends the verified complaint by certified mail. Missing the 30-day sending deadline after report receipt bars a fine under this provision while other remedies may remain.
  • Repair access and structural defects. The complainant generally documents reasonable access times and dates and proves the repairs were not made within 60 days after sending the notice. LARA may dispense with this condition to safeguard the structure or protect occupant health or safety. R 338.1551(4) presumes unfair or dishonest dealing when a licensee fails or refuses to correct a materially deficient, dangerous or hazardous structural matter.
  • Contractual ADR. Under §2411(4)(d)–(e), a qualifying clause uses a neutral at a mutually agreed location. The licensee initiates it and gives certified-mail notice at least 30 days before it starts. LARA generally defers a covered workmanship proceeding where qualifying ADR has yet to be used and completed, subject to noncompliance with its decision, lack of completion within 90 days of complaint filing, or unavailability.
  • Conference and settlement. Under R 338.1552, LARA may request a conference after investigation and mails written notice at least 10 days before it. Failure of an individual licensee or qualifying officer to appear can support a licensing sanction. Under R 338.1553, the licensee reports an agreed resolution to LARA in writing. LARA may close or investigate further and retains disciplinary authority.

Separate records for the initial complaint, LARA’s forwarded complaint, inspection report, repair-access notice and ADR show which deadline applies. Preserve their actual sending and receipt dates.

Reviews, referrals, and advertising rules

Under R 338.1532, licensees generally include the licensed name, number and actual business address in advertising. A telephone number or post office box alone is insufficient. For sales of new homes by a licensed builder through a licensed real estate broker, the rule permits the broker’s name or both names. Section (2) bars soliciting a home-improvement contract with a cash or merchandise bonus contingent on using or displaying the dwelling to a third party or obtaining a third party’s order.

Under 16 CFR 465.2, businesses may not create or sell reviews that materially misrepresent who the reviewer is, whether the reviewer had the experience, or what that experience was. A business also may not buy reviews about itself or its offerings if it knew or should have known of such a misrepresentation. Under §465.4, it may not offer incentives conditioned expressly or by implication on positive or negative sentiment. When responding publicly, keep private customer and project details in the direct follow-up.

Documentation that protects both sides

  • Keep dated logs and photos for work, changes, inspections and conditions that will be concealed.
  • Retain signed selections, changes and acceptance records.
  • Log callbacks with the date reported, promised next step, site visit, agreed remedy and verification.
  • Use a closeout file for the accepted punch list, relevant warranties, manuals, inspection approvals and contractual payment documentation.

Close the loop by confirming what the customer received and how later callbacks should be submitted. If the matter goes to LARA, keep the supporting records and reply on the applicable deadline.

Test Your Knowledge

An owner wants to file a Michigan licensing complaint about work under a maintenance and alteration agreement for a bathroom remodel. The project required no occupancy permit. What filing window does MCL 339.2411(1)(a) provide?

A

90 days after completion

B

18 months after the latest of completion, occupancy or purchase

C

One year after final inspection

D

No filing deadline

Test Your Knowledge

A licensed builder has just received a valid written complaint forwarded by LARA under R 338.1551(2). What is the builder’s next required response under that rule?

A

Reply to the department within 15 days after receipt, confirming or denying the complaint’s justification

B

Reply only to the customer within 60 days

C

Request a circuit court hearing within 30 days

D

Wait for a hearing notice before replying