22.2 Window & Door Schedules
Key Takeaways
Use each opening mark to locate the product data. Check which dimensions describe the unit, the rough opening and the clear passage, and follow cross-references to hardware and installation details.
Get the rough-opening dimensions from the selected product’s installation details and verify the published allowances for the exact unit.
Check escape windows at normal operation. Use 5.7 ft² net clear, or 5.0 ft² for grade-floor or below-grade openings, at least 20 inches clear width, 24 inches clear height, and a window sill no more than 44 inches above the floor.
Apply R308.4 and its exceptions to each glazing mark. Check door and sidelight position, individual pane geometry, walking surfaces, stair landings and wet locations.
Compare the U-factor schedule with the compliance documents. Michigan’s prescriptive table sets 0.32 for fenestration other than skylights and 0.55 for skylights, subject to the applicable exemptions.
From Opening Marks to Product Data
A window and door schedule ties marks such as W01 and D01 to product and installation information. Depending on the set, opening details or hardware schedules may supply some fields. Read the plan for location and count, then use the schedule, specifications and approved details to confirm the order. If W07 appears without a schedule entry or other product reference, obtain the missing information.
| Column | Typical entry | What it controls | Where errors hide |
|---|---|---|---|
| Mark | W01, D02 | Cross-reference to the plan | One mark used for two different sizes |
| Quantity | 6 | Ordering and takeoff | Scheduled count disagrees with plan count |
| Size | 3′-0″ × 5′-0″ | Unit size versus rough opening | Schedule gives R.O., framer treats it as unit size |
| Type and operation | Double-hung, casement, fixed, slider; swing and hand | Function, hardware, handing | Left-hand door ordered for a right-hand swing |
| Material and finish | Vinyl, aluminum-clad wood, fiberglass | Weight, trim, maintenance | Exterior trim and color mismatch |
| Glazing | Double pane, Low-E, argon | U-factor, condensation control | Low-E surface placed on the wrong face |
| U-factor | 0.30 maximum | Energy compliance | Product U-factor exceeds the approved design value |
| Safety glazing | Safety glazing at the listed panes | R308 impact protection | Glass type or required impact classification omitted |
| Egress | E flag on designated escape openings | R310 compliance | Flag omitted, window still sold as egress |
| Opening protection | 20-minute door specified at D03 | Match the design and the applicable opening protection | Confusing the specified garage-to-house door with the overhead door |
| Head height and R.O. | 6′-8″ head, 3′-1″ rough opening | Framing and header depth | Rough opening does not fit the framed hole |
Cross-check hazardous glazing locations against the schedule before ordering. If the plan identifies a safety-glazed pane at the stair but the schedule is silent, clarify the required product and verify its marking at installation.
Rough Opening Is Not Unit Size
The rough opening (R.O.) is the framed opening. The unit size is the outside frame size of the window or door. Use the selected product’s published rough opening and related shimming, flashing and sealing instructions. Compare the schedule and wall detail before the framing crew lays out the opening.
A schedule identifies an actual 36 × 60-inch unit and a manufacturer-specified allowance of ½ inch overall in each dimension for this installation. Lay out a 36½ × 60½-inch rough opening. If the published allowance were ½ inch at each edge, the result would be 37 × 61 inches. Check the product and mounting method before changing an opening. Header and sill layout depend on the confirmed rough opening and the elevation shown on the approved drawings.
Code Rides Along in the Schedule
Compare the schedule to these code requirements and the conditions shown on the plans.
Emergency escape and rescue openings. R310.1 calls for an operable opening in basements, habitable attics and sleeping rooms, subject to its exceptions and the rule for individual basement sleeping rooms. A qualifying window or door can serve. Verify that the opening leads directly to a public way or to a yard or court that opens to one. For a window, check the 5.7 ft² net clear area or 5.0 ft² grade-floor or below-grade exception, 20-inch width, 24-inch height and 44-inch maximum interior sill height. Use the actual passage obtained by normal operation from inside. See Section 51.2 for the basement, well and device details.
Safety glazing. Check the location before flagging the pane. Under R308.4.2, an exposed bottom edge below 60 inches is hazardous within 24 inches of either side in the closed door’s plane. Check perpendicular walls separately within 24 inches of the hinge side of an inward-swinging door. A large window only triggers R308.4.3 if all four tests are met. Near a tub, spa or shower, check both the vertical height of the pane’s exposed bottom edge and the horizontal distance from the applicable edge under R308.4.5. Use Section 51.3 for the full tests, exceptions and impact ratings.
Energy. Michigan Table N1102.1.1 gives prescriptive limits of 0.32 for fenestration other than skylights and 0.55 for skylights in zones 5A, 6A and 7. Match the scheduled unit to the approved compliance documents, including any exemption or applicable alternative path. Confirm the whole-product rating for the specified glazing and frame configuration. Michigan Rule 547c provides the NFRC 100 route, applicable defaults for unlabeled products and specified alternatives.
Worked Takeoff: From Marks to Money
In this example, the plan has 15 openings across six marks. Count each occurrence and verify the features represented by each mark before extending unit prices.
| Mark | Qty | Size (unit) | Type | U-factor | Egress | Unit cost | Extended |
|---|---|---|---|---|---|---|---|
| W01 | 6 | 3′-0″ × 5′-0″ | Casement, vinyl | 0.30 | Required in bedrooms | $520 | $3,120 |
| W02 | 3 | 2′-0″ × 4′-0″ | Slider, vinyl | 0.30 | No | $410 | $1,230 |
| W03 | 2 | 4′-0″ × 4′-0″ | Fixed picture | 0.28 | No | $465 | $930 |
| D01 | 1 | 3′-0″ × 6′-8″ | Insulated entry | 0.30 | — | $1,450 | $1,450 |
| D02 | 2 | 2′-8″ × 6′-8″ | Interior slab | n/a | — | $380 | $760 |
| D03 | 1 | 2′-8″ × 6′-8″ | 20-minute garage-to-hall door | 0.32 | — | $640 | $640 |
For W01, suppose the selected unit’s documented normal operation gives a rectangular clear passage of 29 × 48 inches and the installed sill is 42 inches above the finished floor. The clear area is 1,392 ÷ 144, or about 9.67 ft². The clear area, width, height and sill pass the stated R310 window checks. Confirm the escape route and other location conditions on the plan.
D03 specifies one permitted door type for an opening between the garage and residence. Michigan Rule 544b bars a direct opening into a sleeping room. In this example the opening leads to a hall. The rule permits a minimum 1-3/8-inch solid wood or solid or honeycomb-core steel door, or a 20-minute fire-rated door. The example separately stipulates a listed product with the scheduled energy rating.
Unit subtotal: 3,120 + 1,230 + 930 + 1,450 + 760 + 640 = $8,130 for 15 openings (6 + 3 + 2 + 1 + 2 + 1). Allow an average $45 per opening for installation materials in this estimate, including exterior flashing or interior hardware and shims where specified. That is 15 × 45 = $675, making the materials total $8,805. The three window marks account for 11 units. If all 11 receive the same glazing upgrade and the doors remain unchanged, multiply the quoted per-window premium by 11.
Six Cross-Checks Before the Order Goes Out
- Match each mark. Account for each opening and each ordered unit. Check whether marks refer to repeat units, option sets or hardware cross-references before assuming a count is missing.
- Count match. Count the marks on each floor plan sheet and compare with scheduled quantities; count the second floor separately if the plan is split.
- Handing. Check each exterior door swing against the plan, including in-swing versus out-swing. A reversed door cannot be fixed with trim.
- Egress. Flag each required R310 opening, accounting for the basement and attic rules. Verify operation, clear size and the applicable window sill and well details.
- Safety glazing. Confirm the markings and specified impact classification where R308 requires safety glazing.
- Rough opening and header. Check the framed size and head-height reference against the opening detail and verify structural header depth and bearing. Compare the window and door U-factors with the approved energy documents.
When an Opening Changes
Check the current schedule and approved documents before substituting any product. Verify unit size, installation clearances, handing, required escape passage, glazing and energy rating. Obtain written direction through the project’s change process and submit an amended set for approval under R106.4 if the proposed work departs from the approved documents. A conforming replacement still has to meet the specified opening performance.
A schedule lists W04 as a 3′-0″ × 5′-0″ unit. What should the crew do to frame the opening?
Use the manufacturer’s published rough opening for the specified configuration and mounting method.
Frame the opening exactly 3′-0″ × 5′-0″ so the unit fits tight and seals without shims
Frame the opening 2″ smaller on each side so the nailing fin overlaps the framing
Order the window first and measure the frame on site before framing the wall
A new upper-story bedroom’s scheduled escape window does not qualify for the grade-floor or below-grade exception. Which dimensions must be verified under R310.2.1 and R310.2.2?
At least 5.0 square feet of net clear opening with no limit on sill height, because Michigan allows grade-floor dimensions everywhere
A 24″ × 24″ clear opening with tempered glazing and a 36″ maximum sill
At least 5.7 square feet of net clear opening, at least 20″ clear width and 24″ clear height, with the sill not more than 44″ above the floor
A 36″ wide opening with the sill not more than 60″ above the floor