39.1 Roof Framing & Rafters
Key Takeaways
On a symmetrical gable, 6:12 slope means 6 inches of rise per 12 inches of horizontal run, or one-quarter pitch if pitch is expressed as rise divided by full span.
Common rafter line length equals horizontal run × slope factor. Subtract half the ridge board thickness from the horizontal run before multiplying when measuring to the near face of a centered ridge board.
Use the horizontal projection of the supported rafter span in Tables R802.5.1(1)–(8). Match the load, ceiling, material and spacing assumptions and apply the raised-tie adjustment where needed.
A ridge board must be at least 1 in. nominal thick and at least as deep as the cut end of the rafter; hip and valley rafters must be at least 2 in. nominal thick (R802.3)
For a notch at the actual end of a solid-sawn rafter, the depth limit is one-quarter of the member depth. Check R802.7.1.1 separately for cantilevered tails and R802.6 for bearing.
A roof frame carries its permanent weight, the controlling roof live or snow load and wind loads. Michigan Rule 515 adds Table R301.2(5) for ground snow by jurisdiction. Monroe County is 20 psf. Wayne County is generally 20 psf, with Northville at 25 psf. Houghton and Keweenaw also have local exceptions to their general county values. Read the row for the project location. Ground snow is an input to the applicable design method, not a uniform pressure to place directly on every roof. R301.6 requires the greater of the applicable roof live load and snow load. Truss-specific loading assumptions are in Section 39.2.
The members of a stick-framed roof
- Ridge board - the vertical board at the peak used for alignment and connections in a tied rafter assembly.
- Common rafters - members that run perpendicular to the ridge, from a supporting wall toward the ridge.
- Hip rafters - run diagonally from an outside building corner to the ridge, forming the external corner of a hip roof.
- Valley rafters - run diagonally where two roof planes meet in an inside corner and carry the jack rafters that die into them.
- Jack rafters - shortened rafters: hip jacks die into a hip rafter, valley jacks die into a valley rafter, and cripple jacks span between a hip and a valley.
- Ceiling joists and rafter ties - horizontal tension members tying opposing rafter feet together so the roof cannot push the walls apart.
- Collar ties - at least 1x4 nominal and at most 4 ft on center when used. Collar ties or ridge straps resist separation under ridge uplift and are installed in the upper third under R802.3.1 and Table R602.3(1).
- Subfascia and fascia - the board nailed across the rafter tails and the finished trim that covers it.
- Soffit - the underside of the overhang between the wall and fascia. It can contain an intake vent in a vented roof assembly.
- Lookouts - short cantilevered framing members that carry a rake overhang past the gable end wall.
Slope, pitch and the arithmetic framers use
Slope is rise per 12 in. of horizontal run, written as a ratio such as 6/12. When pitch is stated as rise divided by total span, a symmetrical 6/12 gable is 1/4 pitch because the full span is twice the common run. Check how the drawing uses the term. The roof angle is the arctangent of rise over run.
The most useful single number in roof framing is the common rafter multiplier - the length of rafter per foot of horizontal run, equal to the square root of (144 plus the rise squared) divided by 12.
| Slope | Roof angle | Pitch (rise/span) | Common rafter multiplier | Hip/valley multiplier |
|---|---|---|---|---|
| 2/12 | 9.5 degrees | 1/12 | 1.014 | 1.424 |
| 3/12 | 14.0 degrees | 1/8 | 1.031 | 1.436 |
| 4/12 | 18.4 degrees | 1/6 | 1.054 | 1.453 |
| 5/12 | 22.6 degrees | 5/24 | 1.083 | 1.474 |
| 6/12 | 26.6 degrees | 1/4 | 1.118 | 1.500 |
| 8/12 | 33.7 degrees | 1/3 | 1.202 | 1.563 |
| 9/12 | 36.9 degrees | 3/8 | 1.250 | 1.601 |
| 10/12 | 39.8 degrees | 5/12 | 1.302 | 1.641 |
| 12/12 | 45.0 degrees | 1/2 | 1.414 | 1.732 |
The hip/valley column assumes equal slopes meeting at a right-angle plan corner and expresses length per foot of common horizontal run. For each 12 inches of common run, the diagonal plan run is √(12² + 12²) ≈ 16.97 inches. With rise r per 12 inches of common run, the diagonal multiplier is √(12² + 12² + r²) ÷ 12. For unequal slopes or a different plan angle, calculate horizontal components and rise from the actual geometry.
Worked example 1. A 6/12 roof with a 12 ft run: 12 ft times 1.118 = 13.42 ft, or 13 ft 5 in. Check it with Pythagoras: rise is 6 ft, so the rafter is the square root of (144 + 36) = 13.416 ft. Same answer.
Worked example 2. The 12 ft is measured from the wall reference line to the ridge center. With an 18 in. horizontal overhang, the projection from the tail plumb line to the ridge center is 162 in. The near face of a centered 1½ in. ridge board is ¾ in. closer on the horizontal. Use (162 − 0.75) × √1.25 ≈ 180.28 in., about 15 ft ¼ in. along the rafter. The ¾ in. is a horizontal offset. Its equivalent along this slope is about 0.84 in.
Worked example 3. A 30 ft span at 8/12 with rafters 24 in. on center: run 15 ft, rise 10 ft, length 15 times 1.202 = 18.03 ft, confirmed by the square root of (225 + 100).
Worked example 4. For a right-angle hip with equal 6/12 slopes and a 12 ft common run, the diagonal line has plan components of 12 ft and 12 ft and a rise of 6 ft. Its length is √(144 + 144 + 36) = 18 ft before end-cut allowances.
Selecting a Rafter Span Table
R802.5 measures the span along its horizontal projection between supports. Confirm the support faces and span convention for the specified design. A layout line measured to the ridge center or including the tail is a different dimension. Start with a species, grade and nominal size and the proposed spacing and assembly loads.
| Table R802.5.1 | Vertical load case | Ceiling condition and table deflection criterion |
|---|---|---|
| (1) and (2) | 20 psf roof live load | (1) unattached, L/180. (2) attached, L/240. |
| (3) and (4) | 30 and 50 psf ground snow, respectively | Unattached, L/180 |
| (5) and (6) | 30 and 50 psf ground snow, respectively | Attached, L/240 |
| (7) and (8) | 70 psf ground snow | (7) unattached, L/180. (8) attached, L/240. |
Use the appropriate 10 or 20 psf dead load column for the actual assembly weight, including the applicable ceiling. Check R301.7 for the assembly’s deflection limit. For instance, its L/180 rafter entry is for slopes greater than 3:12 with no finished ceiling attached. For other conditions, R802.5 refers to the AWC span tables. When a ground snow load exceeds the cases in the code tables, do not extrapolate beyond them. A higher table case can be used conservatively only if it covers the design conditions.
For a No. 2 Douglas fir-larch 2x8 at 10 psf dead load, Table (1) gives 18 ft 5 in. at 16 in. on center or 15 ft 1 in. at 24 in. on center. With 70 psf ground snow and an attached ceiling, Table (8) instead gives 8 ft 10 in. at 24 in. on center before applicable footnote adjustments. The load case and ceiling condition both changed between these tables.
Ridge Support, Hips and Ties
R802.3 covers opposing rafters at the ridge. At a ridge board, limit opposing rafter offset to 1½ in. The section also provides for opposing rafters with a gusset tie. A ridge board must be nominally at least 1 in. thick and as deep as the rafter’s cut end. Hip and valley rafters must be nominally at least 2 in. thick and deep enough for the cut ends they receive. Brace them at the ridge to a bearing partition or design them to distribute that load. Below 3:12, R802.3 requires beam design for members supporting the rafters and ceiling joists, including ridge beams, hips and valleys.
Under R802.3.1, parallel ceiling joists can provide a continuous tie against outward thrust when connected to the rafters and securely joined over supports. If the joists run across the rafters, provide rafter ties. Nominal 2x4 is the minimum prescriptive tie size, with Table R802.5.1(9) connections or equivalent capacity. Without effective ceiling joist or rafter ties, support the ridge on an engineered wall or girder. The collar ties or ridge straps above serve the separate uplift function.
For raised ties, Figure R802.5.1 limits tie height to one-third of ridge height above the supporting wall tops in the illustrated assembly. The span-table footnotes reduce the allowable spans, while the heel-joint table increases the required connection. At one-quarter height, multiply the rafter span by 0.76 and apply 1.33 to the heel-joint requirement. For example, a tabulated 15 ft 1 in. span becomes about 11 ft 5.6 in. horizontally. Check both adjustments before choosing a member or connection.
Bearing and Birdsmouths
A birdsmouth has a horizontal seat cut on the bearing and a plumb heel cut. R802.6 requires at least 1½ in. of bearing on wood or metal or 3 in. on masonry or concrete for the rafter end. For the masonry/concrete condition, check direct bearing or the specified nominal 2 in. minimum sill plate with a minimum nominal bearing area of 48 sq in.
R802.7.1 applies the solid-lumber limits in R502.8.1, including the one-quarter depth cap for a notch at the actual end. For notches elsewhere, check the one-sixth depth limit, one-third length limit and middle-third exclusion. The tension side of members at least nominal 4 in. thick may be notched only at the ends. Where a tail extends beyond the support, check Figure R802.7.1.1 for the separate support and cantilever limits. Under R802.7.1.1 the tail must retain at least 3½ in. of depth, and the cantilever may extend no more than 24 in. along the member as shown.
For a 6:12 layout, a level 3½ in. seat removes about 1.57 in. of rafter depth perpendicular to its edge because 3½ × sin(arctan(6/12)) ≈ 1.57. It removes 1¾ in. measured vertically. On a 5½ in. actual-depth sawn rafter, the end-notch depth cap is 1⅜ in., so this seat fails that depth check. Check seat length, bearing, depth and tail geometry together before using a cut detail.
Layout, Sheathing, Overhangs and Soffits
Select rafter spacing from the design and confirm the roof deck for its actual supports. R803.1 covers lumber sheathing. For wood structural panels, R803.2.2 allows the spans in Table R503.2.1.1(1) or APA E30. The first number on a rated sheathing stamp refers to roof span and the second to subfloor span, subject to the application and support conditions. For instance, the table lists 7/16 in. nominal minimum for 24/16 and caps its roof span at 24 in. with or without edge supports. The 32/16 row lists 15/32 or 1/2 in. nominal minimum, with a 32 in. roof span when edges are supported and a 28 in. span otherwise. A 3/8 in. 24/0 panel can reach 24 in. with approved edge support, but the unsupported limit is 20 in. for that thickness. Check orientation, continuity and loads as well as span. Use R803.2.3 and the applicable fastening and joint layout. APA recommends a 1/8 in. panel gap unless the manufacturer directs otherwise.
At the eave, the rafter tails support the edge with subfascia and fascia. At a gable rake, check the lookout or other overhang’s support, connections and load path. Soffit material closes the underside and may provide intake on a vented roof. R806.2 starts at 1/150 net free vent area, with a 1/300 exception through either the qualifying warm-side vapor retarder in Zones 6–8 or the qualifying high/low vent distribution. R806.3 keeps a 1 in. minimum clear space between insulation and sheathing at the eave vent. Section 47.3 works through the distribution requirements.
Valleys, crickets, saddles and dormers
A valley is the internal drainage channel where two planes meet; the framing member is the valley rafter, and the water is handled by valley lining. For asphalt shingles, R905.2.8.2 permits listed open metal at least 24 in. wide or qualifying mineral-surfaced roll roofing with an 18-in. bottom and at least 36-in. top ply. A closed valley may use either open-valley lining, qualifying smooth roll roofing at least 36 in. wide or the ASTM D1970 alternative. See Section 46.3. A cricket or saddle is required on the ridge side of any chimney or penetration more than 30 in. wide measured perpendicular to the slope, and its covering must be sheet metal or the same material as the roof covering (R903.2.2); unit skylights installed under R308.6 and flashed per the manufacturer are the listed exception. Where a dormer interrupts common rafters, R802.9 frames the opening with headers and trimmers. With a header span up to 4 ft, the header can be a single member the size of the rafter. A single trimmer can carry a single header within 3 ft of the trimmer bearing. Above 4 ft of header span, double the header and trimmers and size them for the loads. Above 6 ft, use approved header-to-trimmer hangers. Tail members over 12 ft that terminate at the header need the prescribed anchors or ledgers. For example, a 7 ft header calls for the doubled members and approved hangers. Coordinate the dormer walls and roof with the drainage details in Chapters 46 and 47.
For a qualifying roof in a designated area under the Michigan Table R301.2(1), R905.1.2 requires an ice barrier from the lowest roof edges to at least 24 in. inside the exterior wall line, and at least 36 in. up the slope where the roof is 8/12 or steeper. Asphalt shingles are limited to slopes of 2:12 or greater, and the standard underlayment at 2:12 to below 4:12 is a double application under R905.2.2 and Table R905.1.1(2). Check the permitted R905.1.1 alternatives and the selected covering instructions in Section 46.1.
A symmetrical gable has a 28 ft horizontal span measured between the outside wall lines and a 6/12 slope. What is the theoretical common rafter line length from the outside wall line to the centered ridge, before any ridge-board or tail adjustment?
15.65 ft
14.00 ft
16.75 ft
13.42 ft
Under the 2015 MRC, what is the maximum notch depth at the actual end of a noncantilevered solid-sawn rafter measuring 7¼ in. deep?
2-7/16 in.
1-5/8 in.
3-5/8 in.
1-13/16 in.