3.3 EPA Hazardous-Material Regulations: Asbestos, Lead & Radon
Key Takeaways
For a covered facility, ordinary demolition requires NESHAP notice to EGLE even without asbestos. For ordinary renovation, the threshold is at least 260 linear feet of RACM on pipes, 160 square feet on other components, or 35 cubic feet off components if length or area could not previously be measured.
Privately controlled small residential buildings with four or fewer dwelling units are generally outside the NESHAP facility definition, but multiple buildings under common control at one site or houses demolished as part of certain commercial or public projects may be covered.
EPA administers lead RRP in Michigan. For covered renovations, the minor-work floor areas are 6 square feet or less per interior room and 20 square feet or less exterior, subject to conditions. Window replacement and demolition of painted components during renovation cannot use the minor-work exemption.
EPA recommends fixing a home at or above 4.0 pCi/L of radon. In Michigan, Appendix F radon-resistant new construction is required in nine listed high-potential counties. Testing establishes the level in a specific home.
For covered pre-1978 housing sales and leases, federal lead disclosure requires the separate Protect Your Family pamphlet and disclosure of known hazards and available records. A buyer generally receives 10 days to inspect or assess unless the parties change or waive that opportunity as allowed.
Quick Answer: For asbestos, identify whether the site is a covered facility and whether the operation is demolition or renovation. For lead, distinguish renovation from a sale or lease and from a total teardown. For radon, distinguish a measured mitigation threshold from a regional requirement for new construction.
Asbestos NESHAP (40 CFR Part 61, Subpart M)
Michigan's EGLE Air Quality Division administers the federal asbestos NESHAP. Under 40 CFR 61.141, a facility can be an institutional, commercial, public, industrial or residential structure or installation. A private residential building with four or fewer dwelling units is generally excluded. Check the installation and common-control rules when several structures are involved. Houses demolished as part of a commercial or public project can be included. Worker-protection and disposal rules can apply independently.
Notification and work-practice requirements:
- Survey the work area. The owner or operator must thoroughly inspect the affected facility or portion before covered demolition or renovation.
- Demolition and renovation are different triggers. Give notice for ordinary demolition of a covered facility even if there is no asbestos. Ordinary renovation triggers the rule at 260 linear feet or more of regulated asbestos-containing material (RACM) on pipes, 160 square feet or more on other components, or 35 cubic feet or more off components where the original length or area could not be measured.
- Allow the notice period. Under 40 CFR 61.145(b), submit ordinary notice through EGLE's MiEnviro portal at least 10 working days before the regulated start (before the demolition itself for a below-threshold demolition), and update it if the start date changes. Government-ordered demolitions due to imminent collapse and emergency renovations have separate timing rules, generally as early as possible and no later than the following working day.
- Use trained oversight and applicable controls. Under 40 CFR 61.145(c), removal before disturbance, wetting and trained on-site representation apply where specified. The on-site representative needs refresher training at least every two years. Use the applicable asbestos waste packaging, shipping records and disposal requirements under 40 CFR 61.150.
Example: An ordinary renovation will disturb 300 linear feet of RACM-insulated pipe in a six-unit apartment building. The owner or operator is over the 260-linear-foot threshold for a covered facility. Allow the 10-working-day notice period before any work that would disturb the material. Follow the applicable removal and waste rules.
Lead: the Renovation, Repair and Painting (RRP) Rule
40 CFR Part 745, Subpart E generally covers paid renovation disturbing painted surfaces in pre-1978 target housing or a qualifying pre-1978 child-occupied facility. A child-occupied facility involves the same child under six visiting on at least two different days of a Sunday-through-Saturday week, for at least three hours per day of such a visit, six hours in the week and 60 hours in the year. The minor repair exclusion allows up to 6 square feet per interior room or 20 square feet exterior if the work avoids window replacement, demolition of painted surface areas and prohibited or restricted methods. In general, combine nonemergency jobs in the same room over 30 days. Check §745.82 for documentation of a lead-free component and §745.103 for target-housing exceptions. EPA distinguishes demolition of a whole building from demolition of painted components during a renovation. Other lead and worker protections can still apply to a total teardown.
Certification duties:
- Firm certification. A firm, including a sole proprietor, needs EPA certification for covered work, generally $300 for five years in an EPA-administered jurisdiction. EPA administers RRP in Michigan. State lead abatement certification is separate.
- Certified renovator. Assign one to the job and use trained workers. EPA's initial course is eight hours and the refresher is four hours. An in-person refresher with hands-on training renews certification for five years. An online refresher renews it for three years, and the next refresher must include hands-on training.
- Work practices. Follow §745.85 for signs, containment, cleaning and verification. Open-flame burning and high-speed sanding without suitable HEPA exhaust are prohibited. Follow the applicable cleaning verification or clearance requirements.
Pre-renovation education and records
Give the applicable Renovate Right notices no more than 60 days before work starts. For work in a dwelling unit, give the owner the pamphlet and obtain written acknowledgment before work begins. If using the mailing option, obtain a certificate of mailing at least seven days before renovation. If the owner does not occupy the unit, also provide the pamphlet to an adult occupant. The rule allows the firm to document unsuccessful acknowledgment attempts for nonowner occupants. Common-area work and child-occupied facilities have separate notice recipients and posting options under §745.84. Retain records for at least three years after completion under §745.86. Under §745.82(b), qualifying emergencies waive education and can have limited work-practice exceptions. Cleaning, cleaning verification and specified recordkeeping remain required.
Selling or leasing pre-1978 homes: the separate Title X disclosure
Under 42 USC 4852d and 40 CFR Part 745, Subpart F, sellers and lessors of covered housing give the Protect Your Family from Lead in Your Home pamphlet, disclose known lead hazards and available reports, and include the required warning and acknowledgment in transaction documents. The buyer generally has a 10-day inspection or risk-assessment opportunity before becoming obligated. The parties may agree to another period or the buyer may waive the opportunity in writing. A pre-1978 flip can involve both renovation obligations and sale disclosures.
Radon: the 4 pCi/L action level and radon-resistant construction
Radon is a radioactive gas that can enter homes from soil. EPA recommends fixing a home at 4.0 picocuries per liter (pCi/L) or higher. Under the current 2015 Michigan Residential Code, Appendix F and amended Table AF101 specify radon-resistant construction in Branch, Calhoun, Cass, Hillsdale, Jackson, Kalamazoo, Lenawee, St. Joseph and Washtenaw counties. EGLE recommends consideration statewide and testing to determine a home's concentration. A passive system manages soil gas with a gas-permeable layer, sealed crossings and a soil-gas retarder, a vent to the exterior and power provision for later activation. For a sale subject to Michigan's Seller Disclosure Act, use the applicable property disclosure form and disclose known problems as required.
Check the trigger: A 260-linear-foot pipe job reaches the NESHAP threshold. A covered 20-square-foot exterior lead job can qualify as minor work only if the other exclusion conditions also hold. The radon level is a separate measurement for a specific building.
A scheduled commercial renovation will disturb exactly 260 linear feet of regulated asbestos-containing material on pipes. No emergency or annual notification provision applies. When is ordinary NESHAP notice due?
No notification is required because renovation thresholds are measured only in cubic feet
Notification within 30 days after the renovation is complete
At least 10 working days before stripping, removal or another activity that would disturb the asbestos
Notification only if the building will also be demolished within the same calendar year
After completing an RRP-covered renovation in a pre-1978 house, how long must the certified firm retain the records documenting pamphlet delivery, the certified renovator's assignment, and the lead-safe work practices performed?
One year after the renovation is complete
Three years after the renovation is complete
Five years after the renovation is complete
Permanently, as long as the firm remains EPA-certified
At what indoor radon concentration does EPA recommend fixing a home under its standard action level?
1.0 picocuries per liter of air
2.0 picocuries per liter of air
3.0 picocuries per liter of air
4.0 picocuries per liter of air