43.2 Load-Bearing & Non-Load-Bearing Installation
Key Takeaways
Under R606.4.1, a prescriptive bearing wall more than one story high is at least 8 inches nominal. Check the distinct one-story solid masonry allowance and the applicable design conditions.
Under R606.3.2, solid units use full head and bed joints. Hollow units use solid mortar fill to at least the face-shell thickness, with cross webs around cells to be filled fully bedded in partially grouted construction.
The R606 prescriptive grout route requires a special inspection and lifts no higher than 64 inches for a pour over 8 feet. For a pour higher than 64 inches, the building official determines whether cleanouts are required.
Table R606.6.4 wall slenderness limits are 20 for solid or solid-grouted bearing walls, 18 for other bearing walls and exterior nonbearing walls, and 36 for interior nonbearing walls.
Check the engineering trigger in R404.1.1 separately from backfill strength, anchorage and temporary bracing in R404.1.7. Follow MIOSHA Part 2 for unsupported masonry walls exposed to wind during construction.
Start by tracing the load path. A load-bearing masonry wall receives loads from floors, roofs or stories above and transfers them to its support. A partition carries its own weight and must resist the forces its design assigns to it. Masonry veneer needs gravity support and anchorage for lateral load. It does not support the building's floors or roof. Classify the element before applying nominal thickness, lateral support, anchorage or reinforcement rules.
The general residential masonry provisions are in 2015 MRC R606. R606.1 allows the standards-based design alternatives as well as its own provisions. Masonry foundations also use R404.1.2.1, which directs the builder to the applicable R404.1.1 masonry foundation table and R606 requirements. Above-grade walls and soil-retaining basement walls need separate checks even when they use the same block.
Bond Patterns
A stretcher presents its long face along the wall. A header presents its short face and can bond wythes if it extends into both. A half-unit offset is common running bond. Under R606.3.7.1 a running bond wythe has at least a quarter-unit head-joint offset unless reinforced as stack bond. Traditional common bond uses stretcher courses and periodic header courses. English bond alternates header and stretcher courses and Flemish bond alternates headers and stretchers in a course. Where a pattern is used as an appearance treatment, verify what actually ties the wythes together.
R606.3.7.2 requires horizontal reinforcement in stack bond with at least 0.0007 times the vertical cross-sectional area, at no more than 48 inches between reinforced bed joints or bond beams. In a wall with a 7-5/8-inch actual width, each 12 inches of height represents 91.5 square inches of vertical section. The required horizontal steel is therefore 0.06405 square inch per foot of wall height. One No. 4 bar at 32 inches gives 0.20 × 12/32 = 0.075 square inch per foot. Two W2.8 wires in each 8-inch course give 0.056 × 12/8 = 0.084 square inch per foot. Both pass this isolated area and spacing check. One No. 4 at 48 inches provides just 0.050 square inch per foot, so spacing alone can be inadequate. Use the approved detail for the actual bond pattern, loads, seismic provisions, ties and placement.
Bedding: Face Shells versus Full Bed
Under R606.3.2.2 fill the head and bed joints of hollow masonry in from the faces for at least the face-shell thickness. Leave grout passages open as required by the design. For solid units, R606.3.2.1 requires full head and bed joints and filled internal joints where designed to receive mortar.
The starting bed joint over a foundation has a ¼- to ¾-inch thickness range under R606.3.1. Follow the design's bedding detail at the foundation, and keep grout passages open. Under R606.3.5.3, fully bed the cross webs bounding the cells to be filled in a partially grouted wall. For bond beams, leave a continuous grout path around the specified reinforcement.
Mortar joint thickness is nominally 3/8 inch, with the tolerances in R606.3.1. Concrete and clay masonry foundation walls use Type M or S mortar and are laid in running bond, a requirement that appears in the footnotes to the R404 masonry foundation wall tables.
Grouting
Grout fills designated cells and spaces. R606.2.11 permits ASTM C476-10 or the proportions in its table. It additionally permits Type M or S mortar brought to pouring consistency. The normal slump range for ASTM C476-10 strength-specified conventional grout is 8 to 11 inches. Use the approved material and method for the wall.
- Lift height. On the prescriptive R606 path, the normal maximum is 8 feet per lift. When total pour height exceeds 8 feet, use lifts no higher than 64 inches and provide special inspection. Check pour height and grout space separately. R606.1 also allows design routes using masonry standards. The TMS 602-13 lift criteria apply on their own route and do not substitute for the R606.3.5.1 limit.
- Cleanouts. If the building official requires cleanouts for a pour higher than 64 inches, place them in the bottom course. In solid-grouted masonry space required cleanouts at most 32 inches on center. Remove projections over ½ inch into the grout space and foreign material before inspection and placement.
- Consolidation. Grout is consolidated by puddling or mechanical vibration during placement and reconsolidated after the masonry has absorbed excess water but before the grout loses plasticity (R606.3.5.1). A cell that is filled but not consolidated can look full at the top while hiding a void at mid-height.
- Stopping. If work stops for an hour or more, all tiers are stopped at the same elevation and the grout is left 1 inch below the top of the masonry, forming a horizontal construction joint (R606.3.5.1).
- Time and materials. Place grout before initial set and within 1-1/2 hours of adding water. Grout must not be pumped through aluminum pipe, and must fill a grout space meeting the minimum dimensions of Table R606.3.5.1 - for example, a 2-inch by 3-inch space for a fine-grout pour up to 5 feet high.
Thickness, Bearing and Lateral Support
R606.4.1 sets the minimum for a bearing wall more than one story high at 8 inches nominal. A solid masonry wall of a one-story dwelling or garage can be 6 inches nominal up to 9 feet high, with another 6 feet permitted to the gable peak. For a thickness reduction in hollow-unit masonry or masonry-bonded hollow walls, R606.4.3 calls for a solid or filled transition course, or special units or construction that carry loads to the face shells or wythes below. The minimum for rubble stone walls under R606.4.2 is 16 inches. Under R606.4.4, unreinforced parapets are at least 8 inches thick. The height cap is four times thickness for solid masonry and three times for hollow units. Applicable wind and seismic requirements also govern.
Each wythe must have at least two-thirds of its thickness supported (R606.6.1). For the solid bearing method in R606.6.3, provide a minimum 3 inches measured along the beam onto solid masonry at least 4 inches thick. The provision also addresses an adequately designed bearing plate or a continuous reinforced masonry member projecting at least 4 inches from the wall face. R606.6.3.1 sets the 1-1/2-inch joist bearing minimum, subject to R606.6.3 and the floor connection detail in Figure R606.11(1).
Table R606.6.4 limits the ratio of unsupported height or length to nominal wall thickness. Use actual distances between effective supports. For horizontal spans, cross walls, pilasters, buttresses or a frame can provide support. For vertical spans, check the floor or roof connection. Cavity-wall thickness for this ratio is the sum of nominal wythe thicknesses. Separate cantilever limits are six for solid and four for hollow masonry, with parapets checked separately. The table allows another 6 feet of unsupported height for gable end walls.
| Construction | Maximum ratio in Table R606.6.4 |
|---|---|
| Solid or solid-grouted bearing wall | 20 |
| Other bearing wall | 18 |
| Exterior nonbearing wall | 18 |
| Interior nonbearing wall | 36 |
A pier supporting a beam needs its own check. Under R606.7 an isolated hollow masonry pier supporting a beam or girder is limited to four times its least dimension in unsupported height, or ten times if filled solidly. R606.7.1 provides cap alternatives, including 4 inches of solid masonry or concrete, a masonry cap block, or filling the top-course cavities with concrete or grout. Also check foundation and pier geometry under R404.1.9 when applicable, concentrated loads, anchorage and the approved design. Lay out services before building. R606.8 limits chase depth to one-third of the wall thickness and horizontal chase length to 4 feet, requires at least 8 inches of masonry behind and around the specified cuts, and protects pier areas and required wall strength and fire resistance.
Worked Examples
An 8-inch-nominal, solid-grouted, above-grade bearing wall spans 8 feet vertically between adequate lateral supports. Its ratio is 96/8 = 12, below 20. The ratio check passes. The load, cover, minimum thickness and connections still need checking. If the same nominal block is used as a basement wall, first determine the wall height, soil class, unbalanced backfill, steel grade and position required by the applicable foundation table.
For a 4-inch nominal interior masonry partition between effective top and bottom supports, a 10-foot unsupported height gives 120/4 = 30, within 36. At 13 feet the ratio is 156/4 = 39. A thicker wall, a shorter span between effective supports or an approved alternative design can resolve the out-of-limit condition. Merely relying on the same top and bottom restraints leaves the 13-foot span unchanged.
An 8-by-8-inch isolated hollow masonry pier under a beam has an unsupported height of 36 inches. The unfilled limit is 4 × 8 = 32 inches. Solid filling changes the ratio limit to 10 × 8 = 80 inches, subject to the correct pier, support, cap, bearing and design checks. It does not establish how much load the pier can carry.
Backfill and Construction-Stage Stability
The final design of a retaining foundation and the decision to backfill it are separate. R404.1.1 requires accepted engineering practice where there is hydrostatic pressure or more than 48 inches of unbalanced backfill without permanent lateral support at the top or bottom. For placement under R404.1.7, wait until the wall has sufficient strength and is anchored to the floor above or sufficiently braced against backfill damage. The bracing exception is for walls supporting less than 4 feet of unbalanced backfill. Temporary bracing protects the wall during placement and does not establish a required permanent support. The 4-foot top-and-bottom support notes in the applicable R404.1.2 reinforced concrete basement tables address those concrete details.
For exposed masonry walls under Michigan's MIOSHA Construction Safety Standard Part 2, plan the restricted zone before building a wall more than 8 feet high. It extends the planned wall height plus 4 feet on both sides, at least 4 feet beyond each end, with access limited as the standard directs. A 10-foot wall calls for 14 feet on each side. The rules separate initial from intermediate construction, set height and wind limits and require appropriate bracing under the applicable conditions. Keep the zone and required bracing in place until final lateral support is in place. Confirm the wall's actual height, site wind and installation stage before allowing work around it.
A hollow CMU wall uses the 2015 MRC R606 prescriptive method. At a typical joint away from a cross web required to be bedded, how far from the face must both the bed and head joints be filled with mortar?
Across every grout cell
At least the face-shell thickness
As far as the center of one web only
At the face surface only
Which lift and inspection rule applies to a 2015 MRC R606 prescriptive grout pour that exceeds 8 feet and meets the grout-space table?
Each lift is at most 4 feet, with no special inspection
Each lift is at most 5 feet 4 inches, and each must be poured on a different day
Each lift is at most 64 inches, with special inspection during grouting
Each lift is at most 12 feet 8 inches, with no special inspection
What minimum nominal thickness does 2015 MRC R606.4.1 prescribe for a masonry bearing wall more than one story high?
8 inches
6 inches
10 inches
12 inches
Sections you finish are checked off in the contents.