29.2 Footing Types, Dimensions & Specifications

Key Takeaways

  • Table R403.1(1) for light-frame construction gives 12 × 6 in for a one-story slab-on-grade, 18 × 6 in for a one-story with basement, and 22 × 6 in for a two-story with basement on 1,500 psf soil in the 20 psf column.

  • A plain concrete footing must project at least 2 inches beyond each side of the wall and never more than the footing thickness (R403.1.1), so projection — not width alone — often governs the thickness you specify.

  • The footing tables assume a 32-ft-wide house with a load-bearing center wall; each 2 ft change in house width adds or subtracts 2 inches of width and 1 inch of thickness, minimum 6 inches, and interpolation is allowed while extrapolation is not.

  • R405.1 places a required drain at or below the area it protects. Gravel or crushed stone drains extend at least 1 ft beyond the footing edge and 6 in above its top and are covered with approved filter membrane. Check R405.1.1 separately for precast walls on crushed stone footings.

  • Confirm the footing inspection with the enforcing agency before the pour. The permit holder or agent requests the required inspection under R109.3, and R 408.30509a requires approval before work proceeds beyond it.

Last updated: November 2026

Footing Types and What Each One Carries

Footings are classified by how they collect load and where they deliver it. The type name tells you the load path, and exam questions often turn on that distinction.

TypeWhat it carriesWhere you see it
Continuous (strip)Linear wall loads: exterior walls, interior bearing walls, braced wall linesAround the full perimeter of basements and crawl spaces, and under center bearing walls
Isolated spread (pad)Concentrated post or column loadsBasement lally columns, porch and deck piers, masonry piers
CombinedTwo or more columns close enough that separate pads would overlapColumns near a property line, at a building jog, or beside a stair
Grade beamWall loads carried across unsuitable surface soilSpans between piles or piers; reinforced for bending
SteppedWall loads on a sloping site, with level tops and bottom slopes no steeper than 1 vertical in 10 horizontalHillside and walk-out basements
Deep (pile, caisson, helical pier)Loads transferred by shaft resistance, end bearing or bothEngineered designs where the prescriptive tables do not apply

Two more systems show up in Michigan work. A trench footing is concrete placed directly against the earth in cohesive soil that will stand vertically; the soil is the form, so the bottom must be sound and cleared of loose spoil. A crushed stone footing is permitted for precast concrete foundation walls under R403.4.1 and the associated figure and table. In that application, the stone must be angular, meet ASTM C33, range between 1/2 inch maximum and 1/16 inch minimum, be consolidated with a vibratory plate in lifts not exceeding 8 inches, and is limited to Seismic Design Categories A, B and C.

Prescriptive Sizes: Tables R403.1(1) through R403.1(3)

For a building within the prescriptive assumptions, start with the applicable table. Use the approved design for conditions beyond those assumptions. Table R403.1(1) covers light-frame construction, Table R403.1(2) light frame with brick veneer, and Table R403.1(3) cast-in-place concrete or fully grouted masonry walls. The rows are story count and foundation type; the columns are soil bearing value (1,500 through 4,000 psf) within each snow load or roof live load group.

Here is a portion of Table R403.1(1) for light-frame walls at 1,500 psf soil, with one 2,000 psf column for comparison:

Story and type of structure20 psf, 1,500 psf soil20 psf, 2,000 psf soil30 psf, 1,500 psf soil50 psf, 1,500 psf soil
1 story, slab-on-grade12 × 612 × 612 × 612 × 6
1 story, crawl space12 × 612 × 613 × 616 × 6
1 story plus basement18 × 614 × 619 × 621 × 6
2 story, slab-on-grade12 × 612 × 612 × 614 × 6
2 story, crawl space16 × 612 × 617 × 619 × 6
2 story plus basement22 × 616 × 623 × 625 × 7
3 story plus basement25 × 819 × 626 × 828 × 9

The 20-psf, 1,500-psf column shows why the foundation type matters. The one-story slab-on-grade row gives 12 × 6 in, while the basement row gives 18 × 6 in. The basement assembly adds a foundation wall and an elevated floor. Use the actual row and load group because the difference varies with the house and site.

The footnotes are exam material. The table is based on a 32-ft-wide house with a load-bearing center wall carrying half the tributary attic and floor framing. For every 2 feet of adjustment in house width, add or subtract 2 inches of footing width and 1 inch of footing thickness, but never go below 6 inches thick. Interpolation is allowed; extrapolation is not. For a 40-foot-wide house otherwise within the 22 × 6 in example, the 8-foot width difference is four 2-foot increments. The adjusted table dimensions are 30 × 10 in, before checking geometry. Use an approved design for soil bearing below the table range.

The projection rule that controls thickness

R403.1.1 adds a geometric restriction that candidates routinely miss. The minimum size comes from the tables, but the projection P — the distance the footing sticks out beyond each face of the wall — must be not less than 2 inches and not more than the footing thickness T. For a footing of width W under a centered wall of width w, P=(W−w)÷2P = (W - w) \div 2.

This is why an 18-inch footing under an 8-inch wall works: P = 5 inches, which is at least 2 and no more than a 6-inch thickness. It is also why a 22-inch footing under an 8-inch wall does not work at 6 inches thick: P = 7 inches, which exceeds T = 6. One compliant geometry is a thickness of 8 inches. Increasing only the width would increase the projection and worsen the mismatch.

Thickness, Reinforcement, Joints and Drainage

Thickness and reinforcement

The footing thickness in the tables is a minimum for plain concrete. Check the separate reinforcement provisions of R403.1.3 and the approved details. R403.1.3.5.3 requires 3 inches of minimum steel cover for concrete cast against earth in its scope. Formed faces have different cover requirements. Bars must be held on chairs or precast dobies, never resting on dirt or on scraps of wood that rot and leave a void.

At the footing-to-wall joint, follow the approved wall connection. A formed key can transfer shear where the design calls for it. Dowels connect reinforcement across the joint when required. Coordinate embedment, clear cover and alignment with the wall bars or grouted cells before the footing pour.

Perimeter drainage at the footing line

The footing is also the platform for the foundation drainage system. R405.1 requires drains around concrete or masonry foundations that retain earth and enclose habitable or usable space below grade. The drain — drain tile, perforated pipe, gravel or crushed stone — must be installed at or below the area it protects, and must discharge by gravity or mechanical means to an approved drainage system. Gravel or crushed stone drains must extend at least 1 foot beyond the outside edge of the footing and at least 6 inches above the top of the footing, and must be covered with an approved filter membrane. Perforated pipe sits on at least 2 inches of washed gravel one sieve size larger than the perforations and is covered with at least 6 inches of the same material. The exception covers well-drained ground or qualifying sand-gravel Group I soils in Table R405.1.

For the special case in R405.1.1, a below-grade retaining precast wall on a crushed stone footing needs a perforated drain below the wall base. It may be on either side at least 1 foot from the wall edge. Cover an exterior pipe with approved filter membrane and route discharge to daylight or an approved sewer system. Check the approved detail before setting the wall.

The inspection before concrete

Schedule the required footing inspection before the pour. Michigan excludes the model R109.1 list under R 408.30500. Confirm the sequence with the enforcing agency. Under R109.3 the permit holder or agent requests required inspections, and R109.4 as amended by R 408.30509a requires approval before proceeding. The substance of the check is the same list a competent superintendent walks: trench bottom clean and firm, no frost or standing water, correct width and elevation, correct alignment and square, forms braced and oiled, rebar size, spacing, cover and chairs, dowels in place, keyway planned, and the soil matching the assumption behind the design.

Worked example: continuous footing for a house

Take a 32-foot-wide, one-story house with a full basement, the table’s center-wall framing, light-frame walls above an 8-inch centered concrete basement wall, verified 1,500-psf soil and the applicable 20-psf load column.

  1. Table R403.1(1), one story plus basement at 1,500 psf, 20 psf: 18 in wide × 6 in thick.
  2. Check projection: P=(18−8)÷2=5P = (18 - 8) \div 2 = 5 in. That is at least 2 in and no more than the 6-in thickness — compliant.
  3. The 6-in thickness satisfies this table entry and the projection check. Confirm other requirements such as depth and reinforcement separately.

Now make it two stories with a basement in the same soil and the 30 psf column: the table gives 23 × 6. Projection becomes (23−8)÷2=7.5(23 - 8) \div 2 = 7.5 in, which exceeds a 6-in thickness. The footing must be thickened to at least 7-1/2 in — specify 23 in × 8 in — or redesigned. This is exactly the kind of question the exam asks: the table gives you a number, and R403.1.1 makes you check it.

Worked example: pad footing for a basement column

For a bearing-area check, assume a centered total service load of 18,000 lb including estimated pad weight and a compatible allowable soil pressure of 1,500 psf.

Required area=18,000 lb1,500 psf=12 sf\text{Required area} = \frac{18{,}000\ \text{lb}}{1{,}500\ \text{psf}} = 12\ \text{sf}

A square pad of 12=3.46\sqrt{12} = 3.46 ft must be rounded up: a 42 in × 42 in pad gives 12.25 sf, which meets the bearing-area check at about 1,469 psf. A 36-inch pad would put 2,000 psf on the soil. Check the approved design for thickness, bending, shear and reinforcement separately.

One caution on grade beams and deep foundations: grade beams may span between supports, while deep foundations can mobilize shaft resistance or end bearing, so they fall outside the prescriptive tables and require an engineered design. If the exam describes a footing spanning a buried trash pit or bearing on piles, the answer is never "read Table R403.1."

Test Your Knowledge

For a two-story light-frame house with a basement that meets the table’s framing assumptions, what dimensions does Table R403.1(1) list at 1,500 psf soil bearing and a 20-psf snow or roof live load?

A

22 in × 6 in

B

18 in × 6 in

C

16 in × 6 in

D

25 in × 8 in

Test Your Knowledge

A plain concrete footing is 20 inches wide and 6 inches thick under a centered 12-inch-wide foundation wall. Is the geometry permitted by R403.1.1?

A

No, because the footing must project at least 6 inches on each side

B

No, because footing width must always be twice the wall width

C

Yes, but only if the footing contains reinforcing steel

D

Yes, because the 4-inch projection is at least 2 inches and does not exceed the 6-inch thickness

Sections you finish are checked off in the contents.