12.1 Controlling Variables & Procurement Options

Key Takeaways

  • Use alternates for separately priced variations, allowances for stated amounts on defined items, unit prices for measured work, and contingencies for defined risks.

  • Under unmodified AIA A201–2017 § 3.8, the material allowance normally covers delivered materials and applicable taxes less discounts. Job-site handling, installation and other specified costs are in the Contract Sum outside the allowance.

  • Read the actual unit-price adjustment clause before applying any numerical trigger.

  • For owner- or contractor-furnished equipment, allocate submittals, storage, installation, testing, and warranty coordination explicitly.

Last updated: November 2026

Control uncertainty using the proper device

At procurement, distinguish an optional change in scope, an unresolved selection, an uncertain quantity, and an unforeseen cost. The contract should identify the basis on which bidders price each item and how it will later be reconciled.

DeviceCommon referenceWhat bidders carryWhat happens later
Alternate01 23 00 and the bid formA separate price for adding, deducting, or varying the stated workFollow the solicitation’s evaluation and acceptance procedure and record accepted work
Allowance01 21 00 and the agreementA stated amount for an identified item or scope with unresolved costAdjust using the applicable contract procedure when the actual cost is known
Unit price01 22 00 and the price scheduleA rate per stated unit, with estimated quantities where requestedMeasure the eligible work and apply the contract’s quantity and price provisions
ContingencyBudget or contract provisionsA provision for risks assigned to the appropriate partyFollow authorization, documentation, and unused balance provisions

For an alternate, align the bid form, description, and affected technical documents. Under AIA A701–2018 § 5.3.2, the default permits the owner to accept alternates in any order or combination unless law prohibits it or the bidding documents say otherwise. For covered California state procurements, the Department of General Services directs the procuring entity to specify the method for determining the lowest bid when additive or deductive items are included. Identify the method actual bidders must follow.

Allowance and quantity examples

Under AIA A201–2017 § 3.8.2, unless the Contract Documents provide otherwise, allowance cost includes materials and equipment delivered at the site, applicable taxes and deductions for trade discounts. Site unloading and handling, labor, installation, overhead, and profit are carried in the Contract Sum outside the allowance. Adjust for the difference and any applicable changes in those other costs by Change Order. EJCDC C-700–2018 § 13.02 treats cash allowances similarly under its base terms, with an appropriate Change Order before final payment. For an illustrative material allowance of $25,000 and comparable actual cost of $22,000, the difference is a $3,000 reduction if related costs are unchanged.

Under C-700–2018 § 13.03, estimated quantity times the unit rate sets the initial amount, with payment based on actual quantities as determined under the clause. Adjusting the rate itself requires a material and significant difference in quantities and a material and significant change in unit costs. The base clause does not provide a fixed percentage. A federal contract including FAR 52.211-18 uses a different test: more than 15% above or below an estimated quantity, with an equitable adjustment based on cost impacts due solely to variation above 115% or below 85%. For an estimate of 1,000 units and actual quantity of 1,180, the difference is 18%. The quantity above 1,150 is 30 units for purposes of evaluating the affected costs under that clause. The percentage does not itself set the adjustment amount.

Contingency and approvals

An owner can hold a reserve in its budget. A project using C-700 § 13.02.C can include a separate owner’s contingency allowance for the owner’s use. Under AIA A133–2019 § 3.2.4, the CM’s GMP proposal includes a contingency for costs inside the GMP that are unallocated elsewhere and are not part of a Change Order. Section 11.1.5.3 addresses supporting documentation for reallocations on the schedule of values. Confirm allowed uses, approval authority, and treatment of the unused balance in the actual agreement.

Allocate purchasing and installation

  • Contractor-furnished, contractor-installed (CFCI) assigns both functions to the contractor.
  • Owner-furnished, contractor-installed (OFCI) can apply to equipment an owner buys directly and the contractor installs. Assign receipt, inspection, connections, and protection.
  • Owner-furnished, owner-installed (OFOI) assigns both functions to the owner, often through its separate vendor. Identify any required access, support, and rough-ins carried by the contractor.

For early procurement, establish specifications, approval authority, delivery dates, storage, assignment if planned, and responsibility for later changes before authorizing purchases. Choose a sole-source method only where permitted. For example, a federal restriction to one source may require the authority and justification in FAR Part 6. In multiple-prime procurement the owner separately contracts with several constructors, so define how someone will coordinate shared access, sequence, and connections across those contracts.

References AIA A201–2017 § 3.8, AIA A701–2018 § 5.3.2, AIA A133–2019, EJCDC C-700 base §§ 13.02–13.03 in Muskegon public project packet, FAR 52.211-18, FAR 6.302-1, and California state public works manual.

Loading diagram...
Trace who buys and installs equipment
Test Your Knowledge

Under unmodified AIA A201–2017 § 3.8.2, what costs are included in the stated material allowance?

A

Delivered material cost, site unloading, installation labor, overhead, and profit.

B

Materials and equipment delivered to the site and required taxes, less applicable trade discounts.

C

Installation labor and contractor profit without materials.

D

Design fees and the owner’s general risk reserve.

Test Your Knowledge

A bid form states that the owner will evaluate Base Bid plus Alternate 1 to determine the low bidder, as permitted by the applicable procurement rules. Why is stating the method before opening important?

A

Each contractor can pick which variation is most profitable after opening.

B

It turns an alternate into a cash allowance.

C

It removes the need to coordinate the technical scope.

D

Bidders and the owner can apply the same disclosed evaluation basis.

Test Your Knowledge

A hospital buys imaging equipment directly. The prime contractor will receive, rig, set, and connect it as assigned. Which arrangement is this?

A

Owner-furnished, contractor-installed.

B

Owner-furnished, owner-installed.

C

Contractor-furnished, contractor-installed.

D

Multiple-prime contracting solely because the owner buys a product.

Sections you finish are checked off in the contents.