5.1 Engineering Possession Limits and PICOP Duties
Key Takeaways
The possession limits and the limits of a work site inside the possession are separate.
The PICOP uses red PERSON I.C. POSSESSION lettering on yellow, with an armlet on the left arm or a badge on the upper chest.
Under the standard detonator arrangement, set up and record the protection before the signaller grants the possession. Follow the actual method and applicable deviation.
A possession grant does not establish the safe system for the COSS’s group. Check the actual working limits and obtain the applicable agreement.
Working within a possession
A possession blocks an agreed running line for engineering work and allows controlled movements of engineering trains or on-track plant (OTP). Under Handbook 9 Issue 9, the person in charge of the possession (PICOP) controls the running-line possession. The engineering supervisor (ES) controls a work site within it, including engineering train or OTP movements entering or taking place inside the work site. A controller of site safety (COSS) still has to set up a safe system for the group before work. Check the relevant Rule Book and local arrangements, including the ERTMS handbook where lineside signals are not provided.
Handbook 11 Issue 11, section 2 requires the PICOP to carry a valid certificate of competence issued by their employer. While acting in the role they wear red lettering reading PERSON I.C. POSSESSION on a yellow armlet worn on the left arm or a badge worn on the upper chest. The identifier tells the group who holds the role. Confirm the correct limits and arrangements with the appropriate person for the work.
| Record | Purpose |
|---|---|
| RT3198 | The PICOP records the possession arrangements, including protection, work sites and the giving up of the possession as applicable. |
| RT3199 | The ES records the work-site arrangements and relevant agreements under the applicable work-site procedure. |
| RT9909 | The COSS records the safe-work briefing and appropriate arrangements for the group. |
| NR3180 | The blockage record under Handbook 8. The form does not substitute for a possession or its work-site arrangements. |
How the standard arrangement is granted
Under Handbook 11 sections 3–4, the PICOP checks published arrangements and confirms the relevant details with each signaller who controls a protecting signal leading to the portion of line concerned. A published time is a planned time. For the standard detonator arrangement, the signaller confirms that the signals are at danger or routes closed once the line is clear under the applicable conditions. A possession taken around a standing engineering train has separate requirements. The PICOP records and reads back the details and gets permission to arrange the protection. When all detonator protection is in place, the PICOP records it and tells the signaller. The signaller then confirms the grant when satisfied that the line is correctly protected.
Where that method is used, the drawing and applicable instructions determine the location. The standard equipment arrangement is three detonators on the same rail, 20 metres apart, with the possession limit board at the centre detonator. Handbook 11 provides for different arrangements, including using the token to protect a single line. RSSB lists authorised deviations for engineering controls and other specific cases. A detonator is a warning to the driver. Site protection cannot rely on an assumed stopping distance after a train reaches a detonator.
If the COSS is asked to place possession detonator protection, Handbook 7 section 4.4 requires the PICOP’s assurance that the protecting signal is at danger or the route is closed. The COSS can place work-site marker boards only after the ES gives permission. These are different tasks with different authority.
Check who controls a movement
Under section 8, for a standard approach with detonator protection, the signaller obtains the PICOP’s permission before instructing a driver to pass the protecting signal at danger and proceed to the protection. The PICOP controls the movement past the detonator protection into the possession. A train reaching a separately established work site needs the ES’s authority to enter it. For the group, the practical question is whether the party granting protection controls the actual line and limits at that location.
At close-out, the PICOP needs the work sites and groups relying on the possession arrangements accounted for. Under section 12, report and record that the ES has removed the boards and any COSS or IWA relying directly on the possession has finished with those arrangements. Follow the method-specific procedure for releasing protection, reporting that the line is clear and safe under the applicable conditions, and confirming handback against the signaller’s Train Register entry. Only the relevant authority can resume normal use of the line.
Worked decision: possession on the notice, no work-site agreement
A renewal team has reached the access point and the planned start time has arrived. The PICOP confirms the possession is in place, but the ES has not agreed the team’s working limits. The COSS keeps the group in safety. The PICOP’s confirmation answers whether the running-line possession is in place. The COSS now needs the work-site arrangements from the ES and must establish and brief the group’s safe system. That order also applies if another team has already started in a different work site within the same possession.
When the standard Handbook 11 detonator arrangement is used, what accompanies the three detonators on the same rail?
An amber light at the first detonator
A possession limit board at the centre detonator
A yellow flag at the last detonator
A work-site marker board as an automatic substitute
How does Handbook 11 identify the PICOP while carrying out the role?
Red PERSON I.C. POSSESSION lettering on yellow, on a left-arm armlet or upper-chest badge
White COSS lettering on a blue armlet
Blue ENGINEERING SUPERVISOR lettering on yellow
Black MACHINE CONTROLLER lettering on white
In the standard detonator arrangement, the signaller has told the PICOP to arrange protection. Has the possession been granted?
Yes, because the starting time has arrived
Yes, because the PICOP has written the preliminary details
No. The protection must be in place and reported and the signaller must confirm the grant
No. The first engineering train must enter before the grant