10.2 Working Under a Siding Possession

Key Takeaways

  • Prefer possession of the whole affected siding when possible. Confirm exactly which limits are protected.

  • Distinguish hand points, points worked from a signal box or ground frame, and a possession of part of a siding.

  • The PICOS gives the COSS permission to use the protection and explains its limits and known hazards.

  • Record arrangements in the employer-provided document and account for everyone using the protection before release.

Last updated: November 2026

Establish who controls the siding

Under Handbook 13 Issue 4, a person in charge of the siding possession (PICOS) is appointed to take possession of the affected sidings for engineering work or on-tracking plant. The PICOS must be competent in the rules for the role and hold a valid employer-issued COSS or IWA certificate. An individual working alone (IWA) can arrange a possession only for their own protection. Under Handbook 9 section 5, if the work requires the siding to be blocked, the controller of site safety (COSS) must wait for the PICOS’s permission. A sufficiently competent COSS can also act as PICOS.

The PICOS agrees the location, extent, protection, contact details and timing with the person responsible for operating the siding. Where involved, the shunter or other person controlling movements must be told, unless the person responsible confirms they will pass on the details. Record the affected siding, protection and date and time in the document provided by the employer. Check applicable local instructions, which can modify the handbook arrangements. Knowing the yard layout does not show which line is protected today.

Compare whole and partial possession

ArrangementWhat Handbook 13 requires
Whole siding with points not worked from a signal box or ground frameSet the points to prevent entry, clip and padlock them, and retain the key until the possession is given up.
Points worked from a signal box or ground frameDo not clip those points. Obtain confirmation from the signaller or ground frame operator that the points will be kept to prevent entry.
Part of a sidingPut a visible possession limit board or red light where an approaching movement can see it. Also secure a sleeper across the rails or place a derailer where that part is unsafe, the work would make it unsafe, or anyone will need to work on or near that part.
Entry possible from either endProvide protection at both ends.

Where possible take possession of the whole of each affected siding. A possession taken with an adjacent running-line possession has specific rules in section 6, including protection when access remains possible at the far end of a through siding or the siding possession begins first. If the siding possession is to outlast the running-line possession, put the necessary siding protection in place before the running-line possession is given up. Agree any planned movements to or from the running-line possession with the relevant people and keep the groups under protection safe. If secured points are moved as part of the agreed arrangements, the rule requires them to be secured again after the movement.

Apply the agreement to the group

When the necessary arrangements are complete, the PICOS may permit work and brief anyone sharing the protection on limits and known hazards. They record the name and contact number of another COSS, designated person or IWA using it. The COSS must establish and brief the group’s own safe system. Check the clearance, route and adjacent moving vehicles. A board, a limit on one road or the absence of engine noise cannot protect the group on another road.

Worked decision: the usable part of Road 3 remains open

A gang will replace a damaged rail on part of Road 3. Shunting will continue up to the agreed limit. Under section 5.2, the PICOS uses a visible possession limit board or red light and places the additional protection required because people will work on or near that part of the siding. The COSS checks the working boundary with the PICOS and makes sure the group knows where movements can still take place. If the replacement rail needs to be carried beyond the agreed boundary, the COSS stops and makes sure suitable protection is arranged for the changed task before continuing.

Before giving up the possession the PICOS makes sure the siding is safe for movements, plant is removed and those sharing protection have confirmed it is no longer needed. Remove the protection, notify the relevant people under section 9 and record the return. A shift end time does not by itself release a siding.

Loading diagram...
Taking and giving up a siding possession
Test Your Knowledge

A job requires a siding to be blocked. Who gives the COSS permission to start work there under Handbook 9?

A

The first worker to arrive

B

The driver of a train passing the yard

C

The person in charge of the siding possession

D

The planner who prepared the pack

Test Your Knowledge

A siding entrance is controlled from a ground frame. What does Handbook 13 require for those points?

A

Obtain confirmation from the ground frame operator that the points will be kept to prevent entry, without clipping those points

B

Clip the points yourself without contacting the operator

C

Leave the points free and rely on the planned start time

D

Ask a worker to watch the points instead of checking their position

Test Your Knowledge

Under the standard Handbook 13 arrangement, people will work on or near the part of a siding under possession. What protection is required in the siding?

A

A briefing record placed beside the rail

B

An amber marker on an adjacent road

C

A red light alone

D

A clearly visible possession limit board or red light, together with a secured sleeper across the rails or a derailer