8.2 The Overhead Line Permit (Form C)
Key Takeaways
The nominated person issues the overhead line permit for specified equipment and work. Train protection is a separate arrangement.
The COSS must see test before touch carried out and understand the conditions before signing and briefing the group.
Ask for test before touch again before work on a different part of the OLE. Tell the NP immediately about a lost permit.
When work is suspended or complete, clear people and materials, tell the group to treat the OLE as live and return the completed permit to the NP.
Identify which permission you are dealing with
Handbook 16 Issue 7, sections 8 and 9 describes the overhead line permit, also called Form C. The nominated person (NP) gives it to the COSS after making sure the relevant overhead line equipment (OLE) is isolated and earthed. The permit describes what equipment is covered and where the specified work may take place. Network Rail publishes the applicable SAI25 permit forms for routes using that process. Use the correct form and controls for the work location. An electrical permit does not establish a line blockage or stop trains from running.
| Role | What the COSS needs to know about the interface |
|---|---|
| Electrical control operator (ECO) | The control-room role for the electrical supply. An emergency switch-off request goes to the ECO directly or through another person under the handbook. |
| Nominated person (NP) | Issues and cancels the permit and makes sure the applicable isolation and earthing arrangements are in place. |
| Controller of site safety (COSS) | Understands and accepts the permit conditions, sees test before touch, briefs the group and makes sure work stays within the agreed arrangements. |
Accept the permit and brief the real boundaries
Check the working limits stated on the permit. Ask the NP to resolve any discrepancy between the work, the stated equipment and what the group will encounter. Where live equipment is next to or crosses earthed equipment, identify which is which. Check whether trains are continuing to run and what protection the group has. Network Rail’s Reminder of Live Exposed Equipment guidance explains how reminders identify permit working limits and can mark remaining hazards. Check which reminders are in use and what they mean at this site.
Make sure you see test before touch carried out. This is a distinct check from knowing that the ECO has switched off power. It does not give the COSS a role in performing switching or applying earths merely because they hold the permit. Sign the permit to confirm that you understand its conditions. Before work, make sure everyone understands the working limits, which equipment is live or earthed, and any arrangements for trains still running. Apply the same checks to anyone who joins later.
Worked decision: electrical and rail limits differ
A team has a permit for equipment over one line between two named structures. A crane operator proposes a different lifting position because a delivery has blocked the original set-up point. The new lift could approach live equipment over another line. Stop and check that proposal with the person in charge and the competent electrical and lifting staff. Before the lift can go ahead, the working method and permit conditions must cover the actual envelope of the load and machine, and the group needs the required protection from trains. The original permit limits remain in effect until the applicable arrangements are changed.
Handle changes while holding the permit
Keep the permit while responsible for the work. Under section 9.2, when handing over to another COSS, both sign the permit, the incoming COSS must understand the conditions and they tell the NP, either directly or through the ECO, that they have taken over. Pass on the conditions unless sure the NP already has. Ask for test before touch again if work has to move to a different part of the OLE. That check does not extend the permit limits. If the permit is lost, tell the NP immediately so they can arrange a duplicate under the handbook.
Suspend or complete the work
Section 9.4 requires the COSS to remove everyone and materials from the OLE, to no closer than 2.75 metres, and then instruct the group to treat the OLE as live and dangerous. Complete the permit and give it to the NP, who countersigns it. Follow the specific visual clearance inspection requirement with the NP if the permit has been lost at handback. The electrical return and any separate track handback have different conditions. Do not infer from one that the other has happened. This same sequence protects a group when work is suspended and the permit is returned before the full task has been completed.
What must the COSS do about test before touch when accepting an overhead line permit?
Rely on the planned switch-off time
Ask a worker to touch a structure to check
Leave the test for after the first part of work
Make sure they see the test before touch process carried out
What must the COSS understand before signing an overhead line permit?
That all adjacent OLE is isolated by the same permit
The working limits, equipment that is live or earthed, and the separate arrangements for train movements
That the permit gives permission to extend the working limits without speaking to the NP
That line blockage authority always includes the electrical isolation
When the work is suspended, what does the COSS do before returning the overhead line permit?
Return it while people finish removing their tools
Wait for the NP to switch on before warning the group
Clear people and materials to at least 2.75 metres and tell the group to treat the OLE as live and dangerous
Allow a short grace period for people to collect materials near the OLE
Sections you finish are checked off in the contents.