10.3 Using a Hand Trolley and Confirming Line Clear
Key Takeaways
The COSS confirms the required blockage and gives permission before a trolley goes on the line.
Appoint a competent person in charge, check the fail-safe brake and use a red light visible in both directions while the trolley is on track.
Do not cross an axle counter head or stop within 2 metres unless reset arrangements have been agreed.
Account for each on-tracked trolley before handback, using the applicable line clear verification records.
Confirm authority before on-tracking
Handbook 10 Issue 5 applies, unless company instructions say otherwise, to hand-controlled trolleys and other manually propelled equipment on rail wheels or runners. A competent person must be appointed to be in charge of the trolley while it is in use. The COSS can carry out that role if competent, and must check the line is blocked and give permission before the trolley is placed on it. Check what is agreed at the actual location. An anticipated possession or a booking in the pack does not establish the arrangements.
| Setting | What the COSS must confirm |
|---|---|
| Running line outside a possession | Agree with the signaller the positions needed for points. Do not let the trolley pass a signal at danger or a block marker without the signaller’s authority. |
| Running line within a possession | Agree with the engineering supervisor (ES) when the trolley may be allowed onto the line. |
| Siding | Complete the necessary protection arrangements before the trolley goes on the line. |
| Level crossing on the route | Apply the crossing-specific restrictions in section 2.5. For example, at an automatic half-barrier crossing the controls must be under local control before the trolley comes within them, and the attendant must display a green hand signal before it passes over. |
Identify the crossing type before briefing the trolley crew, especially if the access point or route changes. Section 2.5 prohibits the trolley from entering the controls of an automatic barrier crossing locally monitored by train crew (ABCL) or an automatic open crossing with local monitoring (AOCL). Where the crossing is controlled by CCTV, obstacle detection or remote control, obtain the signaller’s authority before passing over it. A blocked line still requires the applicable crossing arrangements.
Check and control the trolley
The trolley must have an operational fail-safe braking system and the correct brake handle. The person in charge makes sure the braking system is tested and in good order. Follow the applicable instructions for the equipment and how it is loaded. Do not overload it, ride on it or let the trolley or load foul another line. At least two people must be with it while moving and one must be in charge of the brake. Display a red light visible in both directions whenever it is on the track. The rule applies in daylight and on a line normally used in only one direction.
Do not place or use a trolley on a gradient steeper than 1 in 50 unless specially authorised in local instructions. For example, a 1-in-40 section is steeper than 1 in 50. An ordinary trolley plan cannot use that route without the specific authorisation. When not in use put the trolley well clear of the line, and if it is left unattended secure it so it cannot be moved.
Manage axle counters and verify that the line is clear
Under section 1, a trolley must not pass over an axle counter head or stop within 2 metres of it unless reset arrangements have been agreed. Locate relevant heads as part of the route check. The counter determines whether a train has cleared a section from the axles it detects entering and leaving. A trolley placed on the rails inside that section may not be detected. A clear indication therefore cannot show the equipment has been removed.
For work using Network Rail’s line clear verification process, use the required vehicle management records to track on- and off-tracking. RAIB’s Queens Park safety digest describes the separate records for COSS and ES, and the check required if an item remains unaccounted for. Keep equipment movements and transfers between groups traceable. If the count does not reconcile, do not confirm the line is clear. Report the discrepancy and follow the applicable procedure, which in the reported case included physical inspection of the entire work site if the location could not be established.
Worked decision: a trolley moved by another team
Two trolleys were placed on the line and one is confirmed at the expected off-tracking point. A colleague says another team took the second one away, but they cannot say where it was removed. Do not rely on the comment or the visual check of one access point. Tell the ES what is confirmed and what remains unaccounted for, check the vehicle records and keep the relevant protection until the missing trolley is accounted for through the proper procedure. If it is found on the track at a different access point, arrange its safe removal and make the required checks before any confirmation at handback.
A hand trolley is on the line in daylight. What light requirement applies under Handbook 10 Issue 5?
There is no requirement in daylight
A red light must be displayed and visible in both directions
A white light is enough in the normal direction of travel
A red flag replaces the light during a possession
A trolley route crosses an axle counter head. What must be agreed before the trolley crosses it?
Only the colour of the trolley’s light
Permission from a different work group to use the access point
The applicable axle counter reset arrangements
A standard time delay for handing the line back
A team has no confirmation that one of its trolleys was taken off the line. What should the COSS do?
Withhold the clear confirmation and report, reconcile and verify the discrepancy under the applicable process
Confirm the line clear if the expected access point is empty
Assume the signalling will detect any trolley still on the line
Give the line back and ask another group to look for it later
Sections you finish are checked off in the contents.
You've completed this section
Continue exploring other exams