5.4 Registered Code Agencies: Appointment, Functions and Limits

Key Takeaways

  • Under Act s. 4.1 the principal authority enters the agreement and then makes the appointment. A written delegation to the chief building official covers the appointment power in s. 4.1(2).

  • The functions and construction specified in the appointment define what the registered code agency can do. A plans review certificate does not transfer the chief building official’s permit decision.

  • Check conflict of interest and continuing eligibility under Division C 3.7.2.1., including project participation, recent employment and professional or financial interests.

  • Check the agency’s registration class and the people named by class in the public register under Division C 3.4.4.1.

Last updated: November 2026

Agreement, appointment and jurisdiction

A registered code agency (RCA) is a person meeting the Code qualifications and requirements referenced in the Building Code Act, 1992 (the Act) definition. Registration with the director is not an appointment to a project. Under s. 4.1(1) and (2), a principal authority first enters an agreement, then may appoint the agency for specified functions and construction. The chief building official (CBO) may make the appointment under written delegation under s. 4.1(3), subject to any conditions or restrictions. That delegation is of the appointment power, not the power to enter the underlying agreement. Division C 3.7.1. requires the agreement and appointment in writing and specifies their content and scope. The s. 4.2 applicant provision is conditional: it requires a local authorizing instrument and a prescribed eligible applicant and prescribed appointment conditions. It does not allow a private contract to bypass an existing principal-authority appointment or an inspector who has begun to perform any function on the construction.

Under 3.7.2.1., check that the agency remains in good standing for the class it proposes to serve, meets the conditions of registration and has the appropriate architect or engineer on its side if professional design and general review are required. A conflict can bar acceptance or continued work. For example, the agency or one of its officers, directors, partners or employees, or a person it engaged to perform functions for it, participated in design or construction for any part of the building, worked within the preceding 180 days for someone who did, has a disqualifying professional or financial interest, or is an elected official, officer or employee of a principal authority. Ordinary compensation for acting as the RCA is not itself a disqualifying interest. Changing the assigned employee does not cure the agency’s own participation in the design.

Powers follow the appointment

FunctionWhat it means
Act s. 15.15, paragraphs 1 and 2Review proposed construction designs and other materials for Code compliance and, if authorized and the requirements are met, issue a plans review certificate.
Paragraph 3Issue a change certificate when the applicable appointment, review and compliance conditions are met.
Paragraphs 4 and 5Inspect construction for which a permit has been issued and issue a final certificate when the relevant conditions are met.
Paragraph 6 and Division C 3.7.3.1.The Code expressly cross-references 3.7.4.3.(1) or (6); Sentence (6) addresses the occupancy certificate for the specified buildings in 1.3.3.5.(1). Do not infer a generic change-of-use certificate or that any occupancy is allowed whenever there is an RCA.

Check s. 15.16(1) and s. 4.1(4): the work may be before permit, after permit or both, depending on the appointment and Code. Appointment for inspection alone is not appointment to review plans or issue all certificates. Under s. 8(2.1), a plans review certificate containing the prescribed information prevents refusal on Building Code noncompliance grounds for the construction it covers. It does not eliminate the remaining grounds in s. 8(2), including applicable law, required documentation or qualifications, and fees. The CBO is the permit decision-maker; a certificate from an agency is not a building permit or an override of applicable law.

Under 3.7.4.3.(1) and (2), a certificate is signed under the agency’s quality management plan by the agency or, for a corporate or partnership agency, a person qualified under 3.4.3.2.(1)(a). When professional design and general review are required, add the signature of the agency’s appropriately affiliated architect or engineer, or both as applicable. Keep that certificate-signing question separate from who may carry out plan reviews and inspections and from who signs an order.

Public record, expiry and interruption

Division C 3.4.4.1. requires a public register listing the agency name, identifying number if assigned, business address and registration classes, plus the names and assigned identifying numbers of the people who will exercise powers and perform functions for the agency in each class. This permits checking registration and personnel but does not prove the scope of a particular appointment. The agency itself must also maintain specified insurance under Act s. 15.13(1) and Division C 3.6.2.

EventConsequence under the Act
Functions completed, or permit refused or revoked with functions incompleteAppointment expires under s. 15.19.
Principal authority’s appointment terminatedUnder s. 15.20(3), the authority ensures remaining functions are performed by itself or another agency. Section 15.20 also addresses director directions and the distinct responsibilities following termination of an applicant’s appointment.
Agency has ceased functioning and its appointment remains in effectUnder s. 15.21(1), the CBO may order all or part of construction suspended if there is reason to believe the agency has ceased performing the appointed functions.
A s. 4.2 appointment has been terminatedUnder s. 15.21(2), the CBO must order suspension until there is a replacement agency for the remaining functions or the principal authority agrees in writing to perform them.

A suspension order under s. 15.21 permits only work necessary to secure safety and security of the building and site. It is not a stop work order under s. 14, which has its own trigger. Under s. 15.22 the Act and Code prevail over inconsistent appointment terms.

Primary references: Building Code Act, 1992 · 2024 Building Code Compendium, Division C Part 3 · General Legal/Process syllabus

Test Your Knowledge

A principal authority appoints an agency only to inspect a specified building after permit issuance. May the agency use that appointment to decide a different building’s permit application?

A

No. The appointment is limited to the specified functions and construction, and permit issuance is the CBO’s role.

B

Yes, registration alone gives province-wide permit-issuance power.

C

Yes, after the agency issues a final certificate on the first project.

D

Yes, because appointing an agency transfers the CBO’s entire mandate.

Test Your Knowledge

A corporate agency designed the steel frame of a warehouse. The authority proposes appointing that same agency to inspect the construction, with a different employee assigned. May it accept?

A

Yes, if the owner signs a waiver.

B

Yes, because inspectors and designers are different employees.

C

No, because the agency’s participation in designing a part of the building is a conflict.

D

Yes, if it does not issue a final certificate.

Test Your Knowledge

A permit application includes a valid plans review certificate with the prescribed information. What is the effect under Act s. 8(2.1)?

A

The agency must issue the building permit immediately.

B

The CBO cannot refuse on Code noncompliance grounds for covered construction, but other refusal grounds still apply.

C

The CBO must waive fees and all zoning rules.

D

The application must first be ratified by the Building Code Commission.

Test Your Knowledge

A valid appointment is still in effect and the CBO has reason to believe the agency has ceased performing the appointed functions. What does Act s. 15.21(1) allow?

A

Only the agency may order suspension.

B

The CBO must wait for the appointment to expire.

C

The CBO must seek a new building permit from the director.

D

The CBO may order suspension of all or part of the construction.