Section 1(1) covers qualifying structures over 10 m², smaller structures with plumbing, standalone plumbing, sewage systems and structures designated by the Code.
A shed over 10 m² can be a building under the Act and still qualify for the five-condition exemption in Division C Sentence 1.3.1.1.(6).
Installing a prefabricated or relocated building unit can be construction. Removing a material part of a building can be demolition.
Section 1(1) defines building owner and inspector. Section 15.1(1) defines owner specifically for the property standards provisions.
Under s. 1.1(3)(d), a builder must notify the designer and an inspector or registered code agency, as appropriate, when site conditions affect Code compliance.
Apply the definition before the permit rule
Start with s. 1(1) of the Building Code Act, 1992 (BCA). It defines the property, activity and actors to which later sections assign responsibilities. For construction or demolition, ask three questions in order. Is the thing a building? Is the planned action construction or demolition? Does a specific rule exempt the work from the ordinary permit requirement in s. 8(1)?
What qualifies as a building?
| Clause of s. 1(1) | Legal category | Example |
|---|---|---|
| (a) | Structure occupying more than 10 m² with a wall, roof, floor or functional equivalent, including associated plumbing and services | A 14 m² detached backyard studio |
| (b) | Structure of 10 m² or less that contains plumbing, together with its associated plumbing | An 8 m² cabana with a toilet and sink |
| (c) | Plumbing outside a structure | An exterior water service that is part of the plumbing system |
| (c.1) | Sewage system | A leaching bed system meeting the Code definition |
| (d) | Structure specifically designated under the Code | A retaining wall with 1.2 m of exposed height next to public property |
Use Division A Article 1.3.3.5. for designated structures. It includes retaining walls with more than 1,000 mm of exposed height adjacent to public property, access to a building, or private property to which the public is admitted. That test depends on location and exposed height. A small footprint alone cannot resolve the question.
A sewage system is a building for purposes of the Act. The Code’s Division A definition includes specified privies, greywater systems, cesspools, leaching bed systems and holding-tank systems. It uses a design capacity limit of 10,000 litres per day, including a combined limit where multiple systems are on the same lot or parcel. The systems must be wholly within the boundaries of the lot or parcel containing the buildings served. Use the Code definition rather than assuming every sewage works is within this category.
The storage shed distinction
Under Division C Sentence 1.3.1.1.(6), a shed is exempt from the s. 8 permit requirement and Code compliance if all five conditions apply:
- Its gross area is at most 15 m².
- It has at most one storey in building height.
- It is unattached to any building or other structure.
- Its sole use is storage ancillary to a principal building on the lot.
- It has no plumbing.
For a 14 m² one-storey detached shed without plumbing that stores tools for the house on the same lot, answer both questions separately. It is a building under clause (a). It is also exempt under the shed rule. If the proposal is to build it as a guest room, the storage condition fails. A 9 m² ordinary garden shed without plumbing may fall outside the statutory building definition in the first place. Check the designation and plumbing clauses before reaching that conclusion. Ontario Compendium, Division A Part 1, Division C Part 1
Construction, demolition and an exclusion from the Act
Construct covers erection, installation, extension and material alteration or repair. It expressly includes installation of a building unit fabricated or moved from elsewhere. For example, setting a prefabricated 22 m² cabin on a foundation can be construction even when most of the work occurred in a factory. Demolish includes removal of a building or any material part of it. A stem about removing a structural wing still calls for the demolition definition even if the rest remains. Section 1(2) excludes structures used directly to extract ore from a mine. That wording calls for identifying what the structure is used for.
Who is acting?
A chief building official (CBO) is appointed or constituted under s. 3 or 4. Section 1(1.3) extends many references to a CBO to an inspector with the same powers and duties for sewage systems under s. 3.1(3) or 6.2(4), or for plumbing under s. 6.1(5). Read the listed exceptions in s. 1(1.3) before relying on that extension. An inspector under s. 1(1) is appointed under s. 3, 3.1, 4, 6.1 or 6.2. An officer administers and enforces property standards by-laws made under s. 15.1. A registered code agency (RCA) is a person meeting the qualifications and requirements described in s. 15.11(4).
The term building owner in s. 1(1) includes the registered landowner or the owner of a separately owned building, subject to prescribed exceptions, and can include a person responsible for maintaining a building or part subject to a building condition evaluation program. Section 15.1(1) separately defines owner for property standards, including qualifying rent managers and lessees. For an unsafe building order, look to s. 15.9(5) for who must be served. It names the registered owner, each person apparently in possession, and others affected as the CBO determines.
Read “this Act” in context
Sections 1(1.1) and 1(1.2) set a rule for the phrase “this Act.” It generally excludes the property standards provisions in ss. 15.1–15.8. The provisions specifically listed in s. 1(1.2), including the definitions in s. 1(1) and the offences provision in s. 36, include them. The exception matters when deciding whether a general provision reaches a property standards case.
Section 1.1 responsibilities
| Actor | Section | Task to recognize |
|---|---|---|
| Person causing construction | 1.1(1) | Ensure any required permit is obtained and the work complies with the Act, Code and permit. Use people with required qualifications and insurance. |
| Designer | 1.1(2) | Provide compliant, detailed permit documents and perform regulated design and required general review within applicable qualifications. |
| Builder | 1.1(3) | Ensure work waits for any required permit, build to it and use techniques that comply with the Act and Code. Notify the designer and the inspector or RCA, as appropriate, when site conditions affect Code compliance. |
| Manufacturers, suppliers and retailers | 1.1(4) | Ensure products intended for regulated construction uses in Ontario meet the applicable standards. |
| Building owner and building condition evaluator | 1.1(4.1)–(4.2) | The owner sees to the required maintenance, repairs, evaluation and records. The evaluator performs the program responsibilities within any required qualifications. |
| Registered code agency | 1.1(5) | Perform functions under the Act and Code within the agency’s qualifications. |
| CBO and inspectors | 1.1(6)–(7) | The CBO sets policy and oversees enforcement. Inspectors review plans, inspect and issue orders within their qualifications. Both act independently and in accordance with the applicable code of conduct. |
Section 1.1(8) preserves duties elsewhere in the Act and Code. For example, say a foundation excavation reveals soil conditions inconsistent with the permit drawings. The builder’s immediate responsibility under s. 1.1(3)(d) is to notify the designer and an inspector or the RCA, as appropriate. The permit change rules still apply to any eventual redesign. Look for the notification obligation before choosing a response that assumes the builder can resolve the compliance issue alone. Building Code Act, 1992, ss. 1 and 1.1
A homeowner proposes a detached, one-storey 14 m² backyard office with no plumbing. Assume no other permit exemptions apply. How do the Building Code Act, 1992 and the 2024 Code apply?
It is neither a statutory "building" under BCA s. 1(1) nor subject to a building permit because it is under 15 m²
It is not a statutory "building" under BCA s. 1(1) because it contains no plumbing, even though a zoning permit may still be required
It meets the Act’s building definition and requires a permit because the Division C shed exemption is limited to qualifying storage use.
It is a statutory "building" under BCA s. 1(1), but it is automatically exempt from a building permit because it is detached, one storey, and has no plumbing
A contractor plans to flatbed-haul a prefabricated 18 m² modular cabin onto a rural property and set it on concrete piers, with no interior renovations performed on site. How does BCA s. 1(1) classify this activity?
It constitutes "construct" because the definition explicitly includes installing a building unit fabricated or moved from elsewhere
It does not constitute "construct" because the cabin was already built off-site and no erection or material alteration occurs on the lot
It constitutes "demolish" at the original site only, while installation on the receiving lot requires no building permit
It is exempt from the BCA unless the modular unit is permanently attached to a full-depth basement foundation
A 1.2 m-high retaining wall has an exposed face next to a public sidewalk. It occupies less than 10 m² and contains no plumbing. Which Code reference determines its status as a building?
Section 1.1 of the Act defines retaining walls as buildings.
Division C Sentence 1.3.1.1.(6) treats retaining walls as exempt sheds.
Division B Part 10 determines building status based on the changed use.
Division A Sentence 1.3.3.5.(1) designates qualifying retaining walls under s. 1(1)(d) of the Act.
While excavating for an approved commercial addition, a builder encounters unexpected high groundwater and unstable organic soil that prevents constructing the footings shown on the permitted drawings. Under BCA Section 1.1, what is the builder's statutory obligation?
Proceed using a wider concrete footing based on field judgment and submit as-built sketches after pouring
Notify the designer and an inspector (or appointed Registered Code Agency) because unexpected site conditions affect Code compliance
Wait for the property owner to hire a new architect, as the builder has no statutory duty to report site conditions
Obtain a verbal variance from the municipal clerk before continuing foundation work