8.1 Change of Use Permit and Existing-Building Classification
Key Takeaways
Section 10 can require a permit for a change of use with no construction. Apply the Division C matrix and the separate listed increases in hazard.
Check the exception when the change will result from construction for which a s. 8 permit has already been issued. Check the separate exemption for a building in unorganized territory.
For a s. 10 permit, the chief building official checks the proposed use against the Act, Code and applicable law, checks application completeness, and checks fees.
Part 10 uses the existing-building classifications referenced in 11.2.1.1.(1), with a permitted Group G calculation using Group F, Division 2.
Determine whether the proposed change increases hazard
Under s. 10(1) of the Building Code Act, 1992 (the Act), an increase in hazard determined by the Code requires an issued permit before changing the use of a building or part of a building, even if the proposal has no construction. Division C 1.3.1.4. supplies the determination. Division A 1.3.3.3A. and Division B 10.1.1.1. connect Division B Part 10 to existing buildings requiring a permit under s. 10.
In Table 1.3.1.4., find the previous major occupancy in the column and the proposed major occupancy in the row. A positive entry identifies the increase in hazard. Read the notes before using a negative entry. The negative entry applies to a change involving the entire suite. Also check the separate clauses under Sentence (1). For example, the table marks a former Group D office changing to a Group A, Division 2 assembly use as a permit case. If the entire Group A, Division 2 suite changes to a Group D office, the corresponding entry is negative. The direction and facts matter.
Check the prescribed cases beyond the matrix
| Clause of 1.3.1.4.(1) | Increase in hazard |
|---|---|
| (b) | Convert one Group C suite into more than one Group C suite. |
| (c) | Convert a Group A, Division 2 or 4 suite or part of it to a gaming premises. |
| (d) and (e) | Change a farm building or part to another major occupancy outside Group G, or change it to Group G, Division 1. |
| (f) and (g) | Change a building or part to a post-disaster building or retirement home. |
| (h) | Change the use of a building or part whose previous major occupancy cannot be determined. |
Article 10.1.1.2. also deems these cases changes in major occupancy for Part 10. A Group C suite split may therefore count even though the before-and-after groups are the same. In a property file with an unknown previous major occupancy, use the specified clause instead of assigning the building a guessed matrix classification.
Check the permit route and issuance requirements
Under 1.3.1.4.(2), a separate s. 10 permit is unnecessary when the change will result from construction for which a s. 8 permit was issued. Check both facts. The existence of an application for work is different from the issuance of a permit for that work. Sentence (3) separately exempts change of use of a building in unorganized territory from the s. 10 permit requirement.
Under s. 10(2) the chief building official (CBO) issues the permit unless the proposed use would contravene the Act, the Code or other applicable law, the application is incomplete, or fees are unpaid. Use the s. 10 applicable-law list in Division A 1.4.1.3.(2). A change can require compliance with land-use rules even where the Code’s increase-in-hazard test does not require a s. 10 permit.
For example, an office-to-assembly change can follow the same positive matrix entry in two files. In the first file the tenant proposes a use change with no work, so a s. 10 permit is required on the stated facts. In the second file the change will result from material alterations and a s. 8 permit has already been issued for those alterations. The Division C exception applies to the separate s. 10 permit in that file. The source of the authorization changes with the facts, even though the occupancy descriptions are identical.
Classify the existing building for performance review
Article 10.2.1.1. uses the major occupancy provisions of Part 2 or Division B Subsection 3.1.2. Under 10.2.1.2., the usual route classifies the building’s construction and occupancy as provided in 11.2.1.1.(1). The construction index (CI) is determined from the existing building’s applicable construction characteristics under Table 11.2.1.1.-A. The hazard index (HI) uses the applicable occupancy and size criteria in Tables 11.2.1.1.-B to -N. Determine the before and after hazard indices when applying the Part 10 performance rule. The permit matrix and the index comparison serve different decisions.
For Parts 10 and 11, 10.2.1.2.(2) permits the calculation of the Group G construction and hazard indices to be based on Group F, Division 2. This calculation provision leaves the actual agricultural classification in place for other purposes. 10.2.1.3. excludes the specified size and construction articles 2.2.2.3. to 2.2.2.8. and 3.2.2.20. to 3.2.2.93. from Part 10. Consult the actual Part 10 requirements for the proposed use and performance level.
Primary references
Building Code Act, 1992 · 2024 Compendium, Division A · 2024 Compendium, Division C Part 1 · 2024 Compendium, Division B Part 10 · 2024 Compendium, Division B Part 11
A Group D office becomes a Group A, Division 2 assembly space. No construction or exemption applies. What is the result under Table 1.3.1.4. and Act s. 10(1)?
A s. 10 permit is required because the change is marked as an increase in hazard.
The lack of construction makes a s. 10 permit unavailable.
The change is exempt because the new occupancy is in Group A.
The matrix applies only where the building is over 600 m².
Which proposal independently counts as an increase in hazard under Division C 1.3.1.4.(1)(b)?
A corporation buys an existing suite with no change of use.
The same tenant replaces carpeting in the suite with no change of use.
One Group C suite becomes two Group C suites.
A permit holder changes the builder’s contact information.
A change in use will result from construction for which the municipality has already issued a s. 8 permit. What applies to the separate s. 10 permit requirement?
The holder must obtain a second s. 8 permit first.
Division C 1.3.1.4.(2) exempts the proposed change from a separate s. 10 permit.
The exemption applies only if the building is a retirement home.
Table 1.3.1.4. automatically invalidates the s. 8 permit.
Under Article 10.2.1.2.(2), which classification may be used as the basis for calculating the indices for a Group G occupancy?
Group A, Division 4.
Group B, Division 2.
Group F, Division 1.
Group F, Division 2.
Sections you finish are checked off in the contents.