7.1 WPS, PQR, WPDS & Essential vs. Nonessential Variables
Key Takeaways
A WPS provides the company’s general instructions. A WPDS gives the setup for the covered weld detail.
A procedure qualification record preserves the actual test conditions and results.
A prequalified joint that meets the applicable requirements can avoid new testing. CWB review and approval still apply.
Check variable rules for the governing standard, edition and process. Keep work within the issued procedure and refer proposed changes for review.
Follow the documents to the job
Before welding a joint, look up the applicable approved procedure and identify which parts of it cover the drawing detail and actual setup. Welding procedure specification (WPS), welding procedure data sheet (WPDS) and procedure qualification record (PQR) describe different evidence. CWB Form 101 gives the company certification and submission requirements, including a provision for an eligible W47.1 WPS covering prequalified joints in lieu of individual data sheets. Check the approved package for the fabrication job. CWB company certification guide.
| Evidence | What it tells you | What to compare on the job |
|---|---|---|
| WPS | General company instructions for a welding process, including applicable preparation, technique and quality controls | Process, general limits and any requirements shared across detail sheets |
| WPDS | Instructions for the joint detail, including geometry, position, consumables, gas where applicable and welding parameters | Drawing and actual setup against the issued detail and its stated ranges |
| PQR or applicable test record | The variables used on a test assembly and the results of the required examinations or tests | Ask whether the procedure is supported for the proposed production conditions |
Record a deviation against the applicable instruction and revision. A test record can show that a coupon was satisfactory with a particular process and test conditions. The governing standard determines which production ranges, additional tests or combinations of tests it can support. Preserve the actual recorded test variables and results. Changing the number on a test record cannot qualify a new condition. CWB on welder and procedure qualification.
Distinguish acceptance and qualification by test
Prequalification means the applicable construction standard already recognizes the procedure when all its applicable conditions are met. For steel work under CSA W59, a listed joint detail is one part of that decision. Check the applicable edition for base metal, consumables, process and transfer mode, joint geometry and technique. Check any extra requirements for specified toughness. CWB Form 101 describes prequalified W59 joints and the process for testing procedures that require qualification. The W59:24 edition includes additional provisions for joints in base metals with specified toughness. CWB Form 101 and CWB on changes in W59:24.
When testing is required, a representative test assembly is welded and evaluated using the examinations or tests specified for the qualification. A test can include guided bends, tension or impact testing as applicable. The actual test record supports the approved procedure under its qualification rules. CWB reviews submitted procedures and may accept them or require testing or revision. Verify the status before using a proposed change. CWB procedure qualification and review.
Check which rules apply to a change
An essential variable is a variable for which a change beyond the applicable qualification rules requires additional qualification support. Check whether an existing qualification already covers the proposed change. A nonessential variable, where that terminology applies, can be changed without requalifying the procedure, but the written procedure still needs the controlled change. “Nonessential” gives the shop no authority to disregard an issued instruction.
ASME Section IX uses supplementary essential variables when the referencing requirements invoke notch toughness. The applicable process table determines which rules are active. For a CSA W47.1 or W59 job, use its applicable procedure and toughness provisions. Do not transfer an ASME grouping, tolerance, test rule or toughness limit into a CSA procedure decision. ASME on Section IX qualification variables.
Apply the procedure to a splice
A steel splice drawing shows a single-bevel groove. The issued WPDS specifies SMAW with a root opening of 3–5 mm, steel backing and the listed electrode classification. The opening measures 4 mm at one end of the joint and 6 mm at the other. Record both readings with their locations. The second reading exceeds the issued maximum by 1 mm. The shop must address the 6 mm opening under the project’s disposition process before proceeding with the affected work. The inspector reports it to the designated supervisor.
Another crew proposes FCAW-G for the fill passes. Check whether the shop already has an applicable accepted WPS and WPDS for the proposed process and detail, which may involve a different joint preparation or other limits. If its current approval covers only SMAW, refer the proposal for procedure review. The qualification path depends on the applicable requirements and the available approved evidence.
The issued procedure covers SMAW on a steel splice. A supervisor proposes FCAW-G for the fill passes. What should the inspector verify before the proposed process is used?
Equivalent nominal filler strength is enough to proceed.
An operator can add the new process to the old test results.
The proposed FCAW-G setup is covered by an applicable accepted procedure, with any required qualification established.
Any change to the fill passes bypasses procedure review.
Which document normally provides the CWB joint-specific production setup, including groove geometry and permitted welding parameters?
Welding procedure data sheet (WPDS)
Procedure qualification record (PQR)
Individual welder qualification record
Mill test report
A CSA structural steel job specifies notch toughness. Which two checks belong in the review of a proposed procedure change?
Select all that apply
Use an ASME filler grouping to approve every similar CSA consumable.
Check the applicable CSA toughness requirements and the qualified heat range where specified.
Omit the special requirements if the filler classification is unchanged.
Confirm the proposed setup is still covered by the accepted instructions and applicable qualification evidence.