2.2 Title Blocks, Bills of Materials, Revision Control & Drawing Notes
Key Takeaways
Use the drawing number and revision to confirm that the shop has the authorized set for the work.
The BOM specifies the material; a controlled traceability record connects the actual piece to its mill test report.
Revision clouds or deltas can locate changes but do not replace checking the current document register and confirming applicability.
Apply a local exception when a general note expressly allows one, and verify the scope of any typical callout.
Title Blocks, Bills of Materials, Revision Control & Drawing Notes
A welding inspector's authority and accuracy depend on document control. Even on a visually sound weld, the wrong material or an outdated preparation can mean the specified work has not been done. Identify four sources of drawing information before and during production: the Title Block, the Bill of Materials (BOM), the Revision Control System, and Drawing Notes.
The Title Block: First Checkpoint Before Inspection
The title block, often in the lower right, identifies the drawing. Before evaluating a weld joint, an inspector reviews its key fields:
| Title Block Field | What It Tells the Inspector | Inspection Verification |
|---|---|---|
| Drawing & Sheet Number | Unique document ID (e.g., S-104, Sheet 2 of 6) | Match against Inspection & Test Plan (ITP) and traveler |
| Issue Status | Preliminary, For Review, For Tender, or IFC / AFC (Issued / Approved for Construction) | Check the project’s authorized fabrication status; flag a copy not released for production |
Revision (REV) | Current active revision letter or number (e.g., Rev 2) | Confirm shop floor copy matches master document register |
| Scale & Units | Primary sheet scale (1:10, NTS) and units (mm or in) | Avoid metric/imperial mix-ups during fit-up measurement |
| Projection Symbol | Third-angle or first-angle graphic icon | Confirm view orientation before checking joint sides |
| General Tolerances | Default linear and angular shop tolerances (UON) | Check for specific requirements and clarify conflicts |
| Approvals & Stamp | Approvals and issue date as required by the project | Verify engineering authorization for structural fabrication |
| Governing Codes | Reference standards (e.g., CSA W59, CSA S16, CSA W47.1) | Locate the applicable references in the drawing package and project documents |
Bill of Materials (BOM) & Material Traceability
The bill of materials (BOM) or parts list identifies the components specified for an assembly. A cut list can use that information to plan fabrication, but is not itself evidence that the material was received or verified. Standard BOM columns include:
- Piece Mark / Item Number: Unique identifier stenciled or tagged onto each cut piece (e.g.,
P1,B104,G12). - Quantity (
QTY): Exact count required for one assembly (or total contract). - Description / Profile Shape: Structural cross-section and dimensions, such as
PL 16 × 300(16 mm thick plate, 300 mm wide),W310×97(metric wide-flange beam),HSS 152×152×9.5(hollow structural section), orL 102×102×9.5(equal-leg angle). - Length / Cut Size: Finished cut length before edge preparation.
- Material Specification & Grade: Exact alloy/structural standard required by the designer.
- Remarks: Special processing notes such as CVN tested, galvanized, blast clean, or fit-up match-mark.
Connect the requirement to the actual material
A BOM entry such as P7 — PL 16 × 300 — CSA G40.21 350WT specifies what the project needs. It does not establish what is on the shop floor. With the project identification records, match the piece with the applicable heat or lot identifier, then with its mill test report (MTR) or equivalent material certificate. Heat information can be retained through a transferred mark or another controlled tracking method when material is cut.
| Link | What an inspector checks |
|---|---|
| Drawing and BOM | Correct revision, assigned piece mark, dimensions and specified material grade |
| Material identity | Traceable mark or authorized record connects the actual piece with its certificate |
| Test record | Material specification, grade and required test evidence, such as tensile properties or toughness if specified |
| Welding procedure | Specified welding procedure data sheet (WPDS) covers the verified base metal and joint |
If stock marked 300W is offered in place of the specified 350WT, do not approve it simply because both are weldable structural steels. Nor does a correct stamp on another plate establish where an unmarked offcut came from. Record the mismatch or missing linkage, notify the qualified supervisor and follow the project's hold and disposition process before the material is used. A substitute must be authorized, not inferred from similar names or strength. See CWB's Level 1 pathway and welding procedure qualification guidance.
Revision Control: Revision Blocks, Clouds, and Triangles
Fabrication drawings evolve as Requests for Information (RFIs) are answered or interferences are resolved. Revision control makes it possible to tell which instructions are authorized for the work:
- Revision Block: The project may provide a table that logs the Revision identifier (
Rev 0,Rev 1,Rev 2—or letters depending on the engineering firm's legend), Date, Description of Change (e.g., Changed stiffener weld from 6 mm fillet to CJP bevel groove), and Approvals. - Revision Cloud: A scalloped border that may be drawn around the modified graphic or text on the face of the drawing so shop personnel immediately spot what changed in that revision.
- Revision Triangle (Delta): A small equilateral triangle enclosing the revision identifier (for example,
△2) placed beside or inside the revision cloud and cross-referenced to the same number/letter in the revision block.
Check the current document register and prevent superseded copies from being used for work. Keep a controlled historical copy if the project requires it. An existing weld may need a new evaluation when an applicable instruction changes, but verify the revision’s scope and effect with the responsible person; a cloud alone does not authorize rework. ASME Y14.35 addresses revision practices.
Drawing Notes: General Notes, Local Notes, and TYP Callouts
Drawings communicate fabrication requirements through three complementary note formats:
- General Notes: Listed in a dedicated column (usually on the left or above the title block, or on Sheet 1 of a multi-sheet package). General notes apply to their stated scope, such as "All fillet welds 6 mm minimum unless otherwise noted (UON)."
- Local Notes: Specific instructions connected by a leader line and arrowhead directly to one joint, surface, or piece—for example, "Grind weld flush prior to UT" or "Preheat 100 °C min. at flange splice." If the general note explicitly says UON (unless otherwise noted), an applicable local exception controls that feature. Clarify other conflicts rather than relying on an automatic precedence rule.
TYP(Typical) Callouts: Abbreviates repetitive instructions across identical features (e.g.,6 mm fillet TYP at 12 stiffeners;4Xinstead gives an explicit count). WhileTYPsaves clutter, inspectors must read carefully for exceptions—such asTYP EXCEPT AT GRID LINE Bor an adjacent local note upgrading one corner stiffener to an8 mmfillet. AssumingTYPhas zero exceptions is a classic inspection trap.
During receiving and pre-weld verification, an inspector notices that the shop fitter is assembling a girder using a drawing stamped Issued for Review — Rev B, while the project document log lists Issued for Construction (IFC) — Rev 1 as current. What is the inspector's required action?
Permit fit-up to continue if the bevel angles look identical to standard shop practice
Flag the obsolete copy, notify the responsible supervisor and verify the assembly against the controlled IFC Rev 1 drawing before proceeding.
Cross out Rev B on the shop drawing and write Rev 1 after verbally confirming with the fitter
Allow tack welding to finish and check the IFC drawing only during final post-weld visual inspection
Arrange the material and document traceability steps in the logical sequence an inspector follows from engineering requirement to weld release.
Arrange the items in the correct order
Match the Heat Number against the Mill Test Report (MTR) for chemical and mechanical compliance
Verify the material’s heat or lot identifier from the physical mark or authorized traceability record
Read the Bill of Materials (BOM) to identify the required piece mark and specified grade (e.g., CSA G40.21 350WT)
Confirm the verified steel grade matches the base-metal grouping on the approved WPDS
A drawing's General Notes state: All fillet welds 6 mm UON. At stiffener S-4, a leader line carries the local note 8 mm fillet — grind toes smooth, while three adjacent stiffeners carry TYP. How should the inspector evaluate stiffener S-4?
Accept a 6 mm fillet because General Notes apply to the entire sheet
Require an 8 mm fillet at all four stiffeners because TYP forces identical sizing
Accept a 6 mm fillet at S-4 as long as the toes are ground smooth
Require the specified 8 mm fillet with toes ground smooth at S-4; it is an explicit exception to the UON note.