3.1 Welding Symbol Anatomy: Reference Line, Arrow, Tail & Side Significance

Key Takeaways

  • A weld symbol shows the weld type. The complete welding symbol includes an arrow, reference line and any required dimensions, symbols or tail entries.

  • For a side-specific AWS symbol, below the reference line is the arrow side and above is the other side, regardless of arrow direction.

  • Weld symbols above and below specify both sides of the indicated joint, not a different nearby joint.

  • In an applicable one-member groove preparation, the arrow break identifies the member to prepare without changing side placement.

  • Read a sequence of stacked reference lines from the line nearest the arrow outward.

Last updated: November 2026

Welding Symbol Anatomy: Reference Line, Arrow, Tail & Side Significance

Welding symbols tell you what to examine and where. This section uses AWS A2.4:2020 for examples; use the convention specified on the actual drawing. A simple check of the arrow location, weld symbol and reference line can prevent inspection of the wrong joint or side.

Weld Symbol vs. Welding Symbol

Exam candidates frequently confuse two closely related terms that carry distinct meanings in standards terminology:

  • Weld symbol: The individual graphical character indicating the specific type of weld to be deposited—such as a right triangle for a fillet weld, a single V for a V-groove weld, or a rectangle for a plug or slot weld.
  • Welding symbol: The complete graphical assembly used to communicate specified weld information. It consists of the mandatory horizontal reference line and arrow, combined as needed with one or more weld symbols, size and length dimensions, supplementary symbols, finish marks, and an optional tail.

Put simply, a weld symbol is just one building block inside the complete welding symbol. A welding symbol has an arrow and reference line; separate details and notes can also specify weld requirements.

The Mandatory Reference Line and Arrow

The reference line is the structural backbone of every welding symbol. In these examples, the reference line is horizontal. Reversing the arrow does not reverse the locations of size, length or other information on the symbol. Read each element by its specified position, not in the direction of the arrow.

Connecting the reference line to the joint is the arrow—a straight line with an arrowhead pointing directly to the joint line (or to the specific member edge in a groove preparation). The arrow can attach to either the left end or the right end of the reference line, and it may angle in any direction to reach the joint clearly without crossing other drawing callouts.

Side Significance Rules

Where a weld symbol sits relative to the horizontal reference line determines which face of the joint receives the weld:

Placement on Reference LineSide DesignatedPractical Interpretation on a Joint
Below the reference lineArrow sideWeld is placed on the side of the joint to which the arrow points directly
Above the reference lineOther sideWeld is placed on the opposite side of the joint from where the arrow points
Both above and belowBoth sidesWelds are required on both the arrow side and the other side of the joint
Centered straddling the lineNo side significanceUsed for welds where arrow/other side does not apply (e.g., resistance spot, resistance seam, flash, or upset welds)

A common drawing-reading error occurs when an arrow points downward or from right to left. Candidates sometimes mistakenly think "below the line" means "the bottom of the drawing page" or changes when the arrow reverses direction. That is false: for a side-specific AWS symbol, below the reference line is the arrow side and above is the other side, no matter how the arrow is oriented.

No Side Significance (Centered Symbols)

A symbol centered on the reference line may designate a weld without either-side significance, for example a resistance spot or seam weld when neither member is singled out. A spot, projection or seam symbol can be side-specific in other applications. Do not infer the side solely from the weld process name. A stud or surfacing weld applies to a surface, not both sides of a joint, and is shown on the arrow side in AWS A2.4.

Worked joint identification: A slotted tube has a gusset passing through it. Find the actual tube-to-gusset junction touched by the arrow. Two fillet symbols, one above and one below, specify both sides of that joint. They do not identify the distant joint at the opposite wall of the tube. Check for a second arrow or other instruction. The AWS example of slotted hollow structural steel illustrates the difference.

The Broken Arrow (Single-Prepared Groove Joints)

For a bevel-, J- or flare-bevel-groove callout, when one particular member is to be prepared, the broken arrow identifies that member (AWS A2.4 Clause 6.4.1). If the detail already makes it apparent which member is prepared, a break can be omitted; do not add one if there is no preference between members.

  • The broken arrow does not alter arrow-side versus other-side placement.
  • On a groove symbol, first find the member identified for preparation and then read the reference-line side and dimensions. They answer different questions.
  • AWS A2.4 Clause 6.4.2 also allows an arrow break to identify a fillet weld location. This does not prescribe a groove preparation for the fillet.

Multiple Arrows from One Reference Line

When two or more identical joints appear close together on a detail—for example, four identical stiffener-to-web fillet joints on a plate girder—a drafter may run multiple arrows from the same end (or both ends) of a single reference line to each joint. Every joint touched by those arrows must satisfy the exact same weld size, length, process, and inspection requirements shown on that single reference line.

Multiple Reference Lines: Sequence of Operations

Complex joints often require several distinct fabrication steps executed in a strict order—such as welding one side first, backgouging to sound metal from the opposite side, depositing a second-side weld, and then performing Nondestructive Examination (NDE). To communicate sequence cleanly, two or more horizontal reference lines are stacked and connected to the same arrow.

When stacked reference lines indicate an operation sequence:

  • First operation: The reference line closest to the arrow at the connection to the arrow.
  • Second operation: The next reference line moving away from the arrow.
  • Final operation: The reference line farthest from the arrow.

For example, the nearest line specifies the arrow-side groove weld, the next line specifies an other-side back weld after the specified backgouging, and the last line calls for ultrasonic examination of this completed joint. That is a sequence for this callout, not a ban on other intermediate inspections. Clause 6.8 also describes subreference lines used to describe welds at transitions between joint types; those are not a sequence of operations.

The Optional Tail

At the end of the reference line opposite the arrow sits an optional tail shaped like an open V pointing toward the reference line. The tail holds supplementary engineering specifications that do not fit into graphical symbols, including:

  • Welding process: e.g., SMAW (Shielded Metal Arc Welding), GMAW (Gas Metal Arc Welding), or FCAW (Flux-Cored Arc Welding)
  • Procedure identifier: e.g., WPDS-04 (Welding Procedure Data Sheet) or WPS-12 (Welding Procedure Specification)
  • Code or specification reference: e.g., CSA W59 or TYPICAL (when authorized by drawing notes)
  • Special instructions: such as BACKGOUGE TO SOUND METAL or NO BACKING

When no reference is needed the tail can be omitted. An inspector should never draw conclusions from an absent tail; check the general notes on the drawing sheet first.

Loading diagram...
Welding Symbol Components and Multiple Reference Line Sequence
Test Your Knowledge

On a drawing using AWS A2.4:2020, an arrow points diagonally to a T-joint and a fillet symbol is above the reference line. Which side is specified?

A

The side of the joint closest to the bottom of the drawing sheet

B

Both sides of the joint simultaneously

C

The other side (opposite the side to which the arrow points)

D

The arrow side (the side directly touched by the arrowhead)

Test Your Knowledge

On an AWS bevel-groove symbol, what does the break pointing toward the designated member identify?

A

It identifies which single member of a bevel-groove or J-groove joint must receive edge preparation

B

It indicates that the weld must be deposited in the field rather than in the fabrication shop

C

It reverses the standard arrow-side and other-side placement rules on the reference line

D

It notifies the welder that two separate fillet welds are required on opposite flanges

Test Your Knowledge
Ordering

An AWS welding symbol uses three reference lines to specify a sequence. Put the stated operations in order.

Arrange the items in the correct order

1

Deposit the back weld on the middle reference line

2

Backgouge the root per the note associated with the second operation

3

Perform final ultrasonic testing on the line farthest from the arrow

4

Complete the arrow-side groove weld on the line nearest the arrow

Sections you finish are checked off in the contents.