11.2 Reading Tower Crane Load Charts & Capacity Curves

Key Takeaways

  • Read the chart title and reeving label before selecting the configured row and radius column.

  • A chart's minimum and maximum hook reach are separate from the capacity check at the pick, crossing and set.

  • CCO's Chart D is a hammerhead example. Its luffing examples F-1 and F-2 are labeled one-part and two-part, respectively.

  • Use the applicable equipment documents for configuration, wind and between-entry rules. The CCO supplement is an exam exercise.

Last updated: November 2026

Identify the configured row

Start with the tower type, jib or boom arrangement, and reeving. A chart may distinguish boom length from maximum hook reach. The horizontal operating radius describes the hook's working position relative to the crane's rotation axis, using the manufacturer’s measurement convention. A hammerhead reaches different radii by moving the trolley. A luffing boom changes radius by moving the boom. Check under-load geometry and clearances for the planned path, including positions that fall outside the allowed working range. The rated value also depends on the configuration and operating conditions.

Use the CCO Tower Cranes Load Charts, REV 04/14, for the following chart exercises. Keep to the pound entries with the foot columns. Read the table and its notes together. Use the actual chart and manufacturer procedure in the field and follow its instructions for unlisted radii. If the documents do not support the proposed position, obtain the required interpretation or change the plan.

Compare ratings along the route

On printed page 1, hammerhead Chart D is labeled 1-part operation. The asterisk in the radius headings identifies minimum hook reach. Select the 213 ft hook-reach row and read across to each planned radius.

Chart D with 213 ft hook reachRadiusRated capacity
Pick131 ft25,245 lb
Pass an obstruction139 ft22,155 lb
Set164 ft17,550 lb

A 19,000 lb chart-comparable demand passes the first two capacity checks. At the 164 ft set it needs 1,450 lb more than the rating. On the 197 ft hook-reach row Chart D lists 19,820 lb at the same 164 ft radius. That is 820 lb above the demand. At 131 and 139 ft this alternative shows 26,460 and 24,440 lb, respectively. An allowed alternative configuration could meet the three listed load checks if it also provides the needed reach and clearances on the complete route. Record its real installation and settings before relying on the result. The zero-clearance condition at an obstruction, an unexamined intermediate phase or the absence of a required wind check would each keep the plan open.

To find the largest listed radius on the 213 ft row for a 19,000 lb demand, scan across the row. The 156 ft column gives 19,160 lb, leaving just 160 lb, and the 164 ft and remaining farther entries are lower than the demand. The chart identifies 13 ft as minimum hook reach. If a wall prevents working at radii below 66 ft on the planned side, use 66 ft as the site lower bound there. Check listed positions from that bound through 156 ft and resolve between-entry positions with the applicable chart instructions. Reach and obstructions can narrow an otherwise adequate capacity range.

Multiplying vertical load by horizontal radius gives that load's contribution to moment. It cannot reproduce a full tower chart. For example, the 213 ft row's rating times radius is 3,307,095 lb-ft at 131 ft and 2,878,200 lb-ft at 164 ft. A calculation that assumes a constant rated moment from the first cell would misread the second.

Distinguish the luffing cases

On printed page 2, F-1 is labeled 1-part operation. Its 197 ft hook-reach row lists 24,440 lb at 139 ft. On printed page 3, F-2 is labeled 2-part operation. Its 197 ft boom-length row specifies 195 ft hook reach and lists 20,920 lb at 139 ft. These are entries from two chart configurations, so a change to two parts could not be modeled by doubling the first rating. Confirm the applicable hoist and chart rather than carrying the nominal length or load value from one row to the other.

Check conditions that the table omits

OSHA §1926.1417 requires applicable manufacturer procedures and directs a competent person to address the effects of wind, ice and snow on equipment stability and rated capacity. Request the applicable restrictions for the configuration, wind at the crane and load presented to the wind. A broad panel may change which conditions allow a lift. §1926.1435(e)(6)(v) specifies tower-crane wind speed indication and temporary alternatives. A chart cell only resolves the stated capacity question; assess the separate environmental, equipment and clearance limits before approving movement.

Test Your Knowledge

Using CCO Chart D's one-part 213 ft hook-reach row, what is the rated capacity at the planned 164 ft set radius?

A

26,460 lb.

B

25,245 lb.

C

19,820 lb.

D

17,550 lb.

Test Your Knowledge

A 19,000 lb demand must pass the stated 131 ft, 139 ft and 164 ft phases. What do the two Chart D rows establish?

A

Both rows pass the three capacity checks.

B

The 213 ft row fails the 164 ft phase by 1,450 lb. The 197 ft row passes the three listed capacity checks, subject to the other lift requirements.

C

The 197 ft row also fails the last phase because it has shorter hook reach.

D

Only the 131 ft capacity matters once the load is lifted.

Test Your Knowledge

What capacity is listed at 139 ft on luffing Chart F-2 for the 197 ft boom length and 195 ft hook-reach row?

A

52,910 lb.

B

48,880 lb.

C

20,920 lb.

D

24,440 lb.