9.3 Mobile Crane Deductions & Net Capacity Calculations
Key Takeaways
Use the chart notes to identify which weights and deductions count against the rating. Verify actual block, ball and rigging weights.
On a gross basis, either add the specified allowances to payload or subtract the allowances from the gross rating. Avoid counting the same items twice.
Check hoist, rope, reeving, load-point and hardware limits on their own basis. A main line does not physically carry every chart deduction.
An attachment’s deduction can vary by status and chart. Use the correct attachment chart when lifting from its point.
Identify what the rating already includes
The chart notes establish the accounting for the rating. For a gross chart, available payload equals gross rating minus the applicable allowances. On the other side, gross chart demand equals verified payload plus those same allowances. Compare gross demand with the gross rating, or payload with available payload. Use the same chart notes, weights and basis in either comparison.
| Item | What to confirm |
|---|---|
| Hook block, overhaul ball and rigging | Which devices the notes count and which actual rated and identified components are installed. |
| Unused hoist equipment | Whether the inactive block or ball and suspended rope also count against the selected chart. |
| Rope and reeving | Whether notes count additional rope or make a different allowance. Use verified rope weight and the length the notes specify. |
| Auxiliary nose or boom extension | How the chart treats the installed state, such as removed, stowed or erected. Use the specified deduction or the applicable chart. |
For example, the CCO mobile practice supplement Grove notes include the weights of handling devices in the rating. When both block and ball are reeved they count the unused device and its hanging rope. For the specified main boom charts the stowed extension calls for no deduction. The reduction table gives separate deductions for the identified erected extensions when checking the main boom capacity. If lifting from the extension point, use the load chart for that point and its own instructions. An attachment on the machine can consume chart allowance even if its weight is not suspended from the active hoist.
Verify the line and hardware separately
Look up the allowed load for the actual reeving, line, layer of rope on the drum and relevant operating mode. The Grove practice supplement gives a line pull table in which available pull varies by drum layer and speed range. A simple multiplication by parts of line does not by itself establish the permissible reeved load. Use the manufacturer’s applicable limits for reeving and lifting service, then apply separate ratings for the load point, block and rigging.
For a main-hoist check, verify what that line physically supports. An attached boom extension or an unused auxiliary ball can affect the gross chart check without adding that same force to the main hoist. If both lines are actively loaded, use only a manufacturer-permitted arrangement and verify the individual and combined limits.
Worked chart demand for a chiller
Start with the Grove CCO practice configuration on fully extended outriggers, 360° rotation, a 70 ft main boom and a 40 ft loaded radius. Printed page 6 gives 14,650 lb gross. The project’s hypothetical chiller weighs 11,500 lb. For the exercise, the applicable chart counts:
- A main block of 623 lb, consistent with the example block on printed page 2, with its actual weight verified for this exercise.
- Rigging weighing 610 lb.
- The chart lists a 105 lb auxiliary nose and a 369 lb overhaul ball. The ball is unused, with 50 ft of hanging auxiliary line at the guide’s nominal 1 lb/ft. For the exercise, the device weights were verified and the chart calls for including the unused gear and line.
- No deduction for the stowed extension and no additional main-line allowance when using the minimum parts needed for the pick in this chart example.
The allowances total 1,757 lb. Available payload is 12,893 lb, and the gross chart demand is 13,257 lb, or about 90.49% of the gross rating. The margin on that comparison is 1,393 lb. On the separately stated basis for the main line check, the chiller, active block and rigging account for 12,733 lb. Use the verified manufacturer limits for the active line and reeving before approving the lift. For example, the same supplement’s hoist table reports up to 11,640 lb of available pull in low range at the first layer and 8,060 lb at the fifth. Even the first-layer value would be below the stated main-hoist demand if the hook had only one part of line. If a multiple-part system is used, verify its allowable load along the intended travel, including the drum layers used. The chart check alone supplies no proof of line capacity, adequate ground support or site approval. Apply any project-specific limits independently.
A gross chart rating is 24,000 lb. Its notes require allowances of 1,200 lb, 450 lb, 350 lb, 600 lb and 150 lb for the specified gear and attachments. What is available payload on the chart basis?
24,000 lb
22,800 lb
21,250 lb
19,850 lb
A single load is suspended from the main hoist, and the main boom chart also requires an allowance for an unused auxiliary overhaul ball hanging from another line. How should the ball be treated?
Omit it from the gross chart check.
Add it to the main-hoist physical suspended demand only.
Apply the block’s own capacity to the complete crane.
Count it in the chart allowance and evaluate the main line’s physical load separately.
For the CCO Grove practice example, the extension is stowed and the main boom chart is in use. Its setup notes state that the stowed extension has no deduction. How should the chart be read?
Use no deduction for that stowed extension and verify the other required allowances.
Use the full deduction for the extension in its erected position.
Include a standard 600 lb stowed deduction regardless of the chart.
Use the extension chart because the extension remains on the crane.