2.1 Power Line Safety & OSHA 1926.1408 Table A
Key Takeaways
Under OSHA 1926.1408(e), presume lines are energized until the utility owner or operator confirms continued de-energization and visible grounding at the worksite.
Define the work zone by enforceable demarcated boundaries or by the full 360-degree area to the equipment’s maximum working radius.
For lines up to 350 kV, screen at 20 ft. Above 350 kV through 1,000 kV, 1926.1409 substitutes 50 ft where the rule uses 20 ft.
Option (3) uses the verified line voltage and Table A. At 230 kV the Table A distance is 20 ft. Above 1,000 kV, obtain the clearance from the authority specified in 1926.1409(b).
Check the closest approach of all equipment, the load line, rigging and load through the movement, including foreseeable motion at the closest point.
2.1 Power Line Safety & OSHA 1926.1408 Table A
Before crane operation on a construction site, determine whether the crane, load line, load or rigging could get too close to an overhead line. Separate three decisions: how far the equipment can operate, what distance triggers action, and what option the employer will use to control the hazard.
Define the work zone and screen for encroachment
29 CFR 1926.1408(a)(1) allows two work-zone definitions:
- Demarcated zone. Set boundaries with flags or other effective demarcation, which may include a range limit or warning device. Prohibit equipment operation beyond those boundaries. A line on a drawing only helps if translated into boundaries the operator can observe or follow on site.
- Full work zone. Use the area 360 degrees around the equipment to its maximum working radius. A planned swing through a smaller sector does not shrink the zone unless the employer actually limits the work zone using the first method.
Assess the reach of any part of the equipment, line, load or rigging up to the equipment’s maximum working radius within the chosen zone. For a line at or below 350 kV, ask whether any part could get closer than 20 ft. If so, the employer must use one of the three options in 1926.1408(a)(2): utility-confirmed de-energization and visible grounding, the fixed 20 ft distance with paragraph (b) measures, or Table A based on known voltage. Under Option (3), paragraph (b) measures apply if the work zone allows any part to approach closer than the applicable Table A distance. Check paragraph (d) separately if any equipment, line, rigging or load would be below a power line.
1926.1409 applies 1926.1407 and 1926.1408 above 350 kV with changes. For a line over 350 kV through 1,000 kV, substitute 50 ft for the specified 20 ft. That changes the initial screen and the distance under the fixed-distance option. If the employer selects the Table A option, use the voltage row for that calculation. Above 1,000 kV obtain the minimum clearance from the utility owner/operator or a registered professional engineer qualified in electrical power transmission and distribution.
Use Table A with a known voltage
| Nominal AC voltage | Table A distance |
|---|---|
| Up to and including 50 kV | 10 ft |
| Over 50 through 200 kV | 15 ft |
| Over 200 through 350 kV | 20 ft |
| Over 350 through 500 kV | 25 ft |
| Over 500 through 750 kV | 35 ft |
| Over 750 through 1,000 kV | 45 ft |
| Over 1,000 kV | Established by the utility owner/operator or an appropriately qualified registered professional engineer |
With Option (3), determine the line voltage before choosing a row. Under paragraph (c) the utility owner/operator must provide the requested voltage information within two working days of the employer’s request. Select a different compliant option or hold the affected operation while information necessary to use Table A is unavailable. The standard presumes energization, not a guessed voltage. Paragraph (e) requires utility confirmation that the line has been and remains de-energized and visibly grounded at the worksite before treating it as de-energized.
For example, a verified 230 kV line falls in the over-200-through-350 kV row, so its Table A clearance is 20 ft. A verified 500 kV line has a 25 ft Table A clearance, while the initial screen under 1926.1409 is 50 ft. In either case, a planned operation closer than Table A to an energized line is prohibited unless the employer meets all applicable conditions in 1926.1410. Unloaded travel on a construction site is a separate situation governed by 1926.1411.
Verify the closest approach on the planned path
Check the real equipment and load envelope, including the installed jib, hook rigging, counterweight movement and the part of the load that could reach closest to the line. Swing, load sway, line motion and boom deflection can change closest approach. The distance to a utility pole or to the crane’s center of rotation is not that clearance.
As a planning example, at 138 kV the Table A clearance is 15 ft. If the crane can reach a point 12 ft away under the defined zone, using Option (3) requires paragraph (b) controls that keep separation at or above 15 ft. Establish an operating boundary with room for foreseeable movement and stopping distance. A particular buffer dimension by itself does not establish that every part of the crane, load line or load will remain clear. If the crew cannot reliably maintain the separation with the selected measures, revise the setup or choose another compliant option before beginning.
The employer uses Option (3) for operation near a verified, energized 138 kV overhead power line. What clearance does 29 CFR 1926.1408 Table A specify?
10 feet
15 feet
20 feet
25 feet
An employer plans to use Option (3) for a construction crane operation near an overhead line, but the voltage is unknown. What should the employer do before applying a Table A distance?
Estimate the voltage by counting insulators
Use the lowest Table A distance after installing an insulating link
Ask the signalperson to select a distance based on line height
Presume the line is energized and obtain the voltage, or choose another compliant option
The employer defines the work zone using the full 360-degree area to the crane’s maximum working radius. Which inputs are relevant to checking the minimum distance from an overhead line to the complete equipment and load envelope?
The actual boom and jib configuration, rigging and load dimensions, and foreseeable equipment and load movement
Only the boom radius in the lift chart before the load comes off the ground
Only the counterweight radius and the outrigger footprint
Only the distance from the crane’s rotation center to the nearest pole
Sections you finish are checked off in the contents.