7.5 Calculate Load Weight from Dimensions and Volume
Key Takeaways
Use a reliable source for the actual item or an industry-recognized way to calculate its weight, as provided in §1926.1417(o)(3). Check which parts and contents the input covers.
For a material of known weight per unit volume, multiply its actual material volume by that unit weight. If you know weight per length, multiply by the verified length.
Convert dimensions to the same unit before multiplying. Distinguish actual solid volume and actual contents from the external volume of the item.
Carry the verified payload into the sling and crane checks and apply the manufacturer’s chart conventions for counted gear or deductions.
Establish what will actually be hoisted
The weight on a drawing or shipping ticket may describe an empty shell, an earlier configuration or the package with its transport frame. Identify the item, revision and what remains attached at lift-off. Verify which parts are included, such as motors, installed brackets, internal lining and temporary fixtures. Verify what remains inside, such as water, residual product or other material. Record the source and condition with the weight so the operator and rigging team can use the same premise.
Under OSHA §1926.1417(o)(3), the operator verifies that the load is within the crane’s rated capacity. Paragraph (i) accepts an industry-recognized weight source or calculation method, or another equally reliable means. It gives measured steel beam length with known weight per foot as an example. Under paragraph (ii), the operator can begin hoisting and use a listed device to determine whether the load exceeds 75% of the maximum rated capacity at the longest radius of the operation. If it does, the operator cannot proceed until the weight is verified under paragraph (i). That check does not allow exceeding capacity. A project can impose a separate weight-verification requirement.
Convert to weight using a verified input
| Input | Calculate |
|---|---|
| Rectangular solid and known weight per unit volume | Multiply length × width × thickness in compatible units, then multiply by weight per unit volume. |
| Straight, uniform beam and known weight per length | Multiply installed length by the weight per unit length for the verified section. Count the actual pieces. |
| Hollow component with known material geometry | Determine the volume of the material, allowing for the void. Calculate and add any contents separately. For a uniform hollow cylinder, subtract the inner cross-sectional area from the outer area and multiply by its length. |
| Measured liquid volume | Multiply by the liquid’s applicable weight per unit volume. Establish the actual volume present, especially in a partially filled vessel. |
For example, if unit weight is supplied in lb/ft³ and plate dimensions are given in feet and inches, convert inches to feet before computing cubic feet. Multiplying a length in inches by lengths in feet without conversion gives the wrong volume for the unit weight. If individual parts use different materials, calculate each part on its own basis and then add their weights. Use the applicable recognized value for the material and condition. The OSHA Technical Manual explains the relationship between linear measurements and volume. The U.S. Geological Survey gives about 8.34 lb per U.S. gallon for water. Use the appropriate data for the actual liquid, which may differ from water.
Worked example: skid with retained test water
The mechanical drawing and inspection identify these components for a hypothetical pick:
- A solid plate measures 8 ft by 5 ft by 3 in. The verified material data specify 490 lb/ft³ for this exercise. Three inches is 0.25 ft, so volume is 8 × 5 × 0.25 = 10 ft³, and the plate weighs 4,900 lb.
- Two 12 ft members weigh 28 lb per foot each for the verified section. Together their weight is 672 lb.
- The attached tank has a tare weight of 180 lb and contains 180 U.S. gallons of test water. The calculated water weight is about 1,501 lb.
The estimated payload is 4,900 + 672 + 180 + 1,501.2 = 7,253.2 lb on these inputs. If the applicable gross crane chart requires an additional 750 lb for its hook and rigging allowance, compare a gross demand of about 8,003 lb to the applicable gross rating. Keep payload, gear and chart deductions distinct. In the rigging check, determine which weights each sling actually supports and assess the effect of the tank position and any mobile contents on the center of gravity.
If the 180 gallons is merely a guess from the tank’s nominal capacity and the actual fill is unknown, the stated weight calculation is incomplete. Obtain a reliable measured volume, reliable weight or other acceptable verified basis. A changed load or an incompatible weight source requires a new check of the lift and rigging. Document the assumptions and the result with enough detail to explain the basis to the operator.
A rectangular part measures 8 ft × 5 ft × 3 in. Verified material data for this exercise give 490 lb/ft³. What is the part’s calculated weight?
1,225 lb
4,900 lb
19,600 lb
58,800 lb
Two 12 ft members weigh 28 lb per foot each. They will be hoisted with a tank that weighs 180 lb empty and contains 180 gallons of water at 8.34 lb per gallon. What payload should be counted, before hook equipment and slings?
672 lb
852 lb
About 2,353 lb
About 3,025 lb
An operator using the §1926.1417(o)(3)(ii) method observes more than 75% of the crane’s maximum rated capacity at the planned longest radius. What does the rule require before proceeding?
Verify the load weight under §1926.1417(o)(3)(i) using a recognized source, calculation method or other equally reliable means.
Proceed as long as the first hoist was at a shorter radius.
Assume the actual weight is the bill of lading’s empty tare.
Use the longest radius that would be possible with no load, even if it is outside the operation.
Sections you finish are checked off in the contents.