2.3 Environmental & Weather Hazards
Key Takeaways
With shape, orientation and air density fixed, wind drag varies with the square of relative wind speed. Doubling speed gives four times the drag.
Compare wind readings with the manufacturer’s specified location, gust or averaging method, load area and crane configuration.
Use the equipment-specific limits and warm-up procedures for cold, and assess ice, snow and rain for changes to stability, load and visibility.
Plan to secure equipment and reach shelter before a thunderstorm arrives. When thunder is heard or lightning is seen, seek shelter promptly. Wait at least 30 minutes after the last thunder or lightning before going outside.
Match lighting to the actual work area and maintain a suitable means of signaling. Stop operations requiring signals when the signals cannot be transmitted.
2.3 Environmental & Weather Hazards
Check the forecast and actual conditions for setup, the full lift and the time needed to secure equipment. Define who monitors conditions, who communicates changes and how the crew responds. Under OSHA 1926.1417(n), a competent person adjusts equipment or operations for wind, ice and snow effects on stability and rated capacity. Under paragraph (h), a local storm warning requires the competent person to determine whether to implement the manufacturer’s securing recommendations.
Wind, projected area and crane configuration
An exposed panel can swing or rotate under wind force even when its weight is well within the chart rating. As it rotates, its projected area and the wind force on the rigging can change. Account for wind on the crane itself as well as on the load. The drag equation from NASA Glenn explains the sensitivity of the load to changes in relative wind speed:
Here is drag force, is air density, is relative wind speed, is the drag coefficient and is the reference area used with that coefficient. At fixed density, orientation, coefficient and area, an increase from 15 to 30 mph multiplies drag by . Use the manufacturer’s load-area and wind method to decide whether a specific lift is permissible. The force ratio describes the change in drag; it gives no permitted wind speed or allowable crane capacity by itself.
Compare measurements with the applicable limit
Wind at the work height or near a building corner may differ from a reading in a sheltered ground area. Determine the location and sampling rule that go with the crane’s limit. For example, the Grove RT9130E-2 operator manual evaluates boom-tip three-second gusts and gives procedures that account for boom configuration and the load’s wind resistance area. Apply the actual manual and chart notes for the crane being used.
OSHA 1926.1435(e)(6)(v) requires a tower crane wind speed indicator above the upper rotating structure, or at or above jib level for self-erecting cranes. The rule provides temporary alternatives, such as a functioning indicator on another tower crane on the same site or a qualified person’s wind estimate, under the applicable operational aid provisions.
Example: Before placing facade panels, compare measured gusts with the manufacturer’s limit for the planned boom, rigging and exposed panel. If only a ground-level average is known and the manufacturer uses an elevated gust, arrange a comparable reading or an approved determination. If exposure or the crew’s ability to control the panel changes during the pick, stop safely and reassess the plan.
Cold, precipitation and contamination
| Condition | Check before starting or resuming |
|---|---|
| Extreme cold | Find applicable temperature, configuration, fluid and warm-up instructions. Cold can slow hydraulic response and some steels are less tough at low temperatures. Verify the manufacturer’s specifications before imposing or relying on a capacity adjustment. |
| Snow, ice or frost | Check accumulation on the machine and load, rigging contact and access surfaces. Make the manufacturer’s required inspections and preparations, then confirm the actual loading and ground support. |
| Rain and runoff | Look for reduced ground support, movement at mats, slippery routes and water collected in the load. Reassess if field conditions differ from the plan. |
| Fog, glare, steam or snow | Check whether the operator and signalperson can follow the load and detect people and obstructions using a signaling method suitable for the conditions. |
For example, the Grove manual specifies cold-weather procedures, suitable lubricants and warm-up checks for that model. A crew’s remembered generic percentage is insufficient to resolve the operating limit. Include the effect of changed temperatures on the rigging as well as the crane.
Lightning and storm response
Plan the shutdown and route to shelter early enough for crews to reach safety before a storm is overhead. The OSHA and NOAA workplace lightning guidance calls for shelter when thunder is heard or lightning is seen, and at least 30 minutes after the last thunder before leaving shelter. The National Weather Service overview also includes the last flash of lightning. Use a substantial enclosed building or an enclosed hard-topped metal vehicle. Do not delay shelter to time the interval between a flash and thunder. The site plan should cover safe suspension and securing ahead of the storm, avoiding last-minute work that delays evacuation. Reassess ground, power and equipment conditions before resuming.
Visibility and work area lighting
OSHA 1926.56 Table D-3 assigns minimum foot-candles by area or operation. For example, it lists 5 foot-candles for general construction area lighting and 3 for the row covering access ways and loading platforms. Identify the applicable row for the work rather than assigning a universal rigging illuminance. Check lighting of the load path, landing location, signals and nearby hazards, accounting for glare and shadows. Under 1926.1419(f), if operations require signals and the ability to transmit them is interrupted, safely stop those operations until signaling is restored and a proper signal is given and understood.
Wind speed relative to a suspended curtain wall panel increases from 10 to 20 mph. With the panel orientation, projected area, drag coefficient and air density unchanged, what happens to its aerodynamic drag?
It quadruples
It doubles
It increases by 50%
It remains the same if the crane capacity exceeds the panel weight
A mobile crane is scheduled to lift in unusually cold conditions. What should the lift director verify before accepting the crane for the lift?
Whether the counterweights need to be weighed again because their mass falls in cold air
Whether a universal 25% reduction brings the load below the chart value
The crane manufacturer’s cold-weather limits, equipment requirements and warm-up procedures for this configuration
Whether the engine idles normally, which by itself establishes readiness
A tower crane crew is preparing for a pick, with no load suspended, when thunder is heard. Under National Weather Service workplace guidance, how should the crew respond?
Continue until lightning is visible above the site
Raise the hook and wait outdoors until a flash-to-thunder interval can be timed
Move below the crane and start the pick if rain has not reached the site
Suspend work and go promptly to safe shelter. Stay there for at least 30 minutes after the last thunder or lightning before going outside.
Sections you finish are checked off in the contents.