4.2 Personnel Hoisting Regulations under OSHA 1926.1431
Key Takeaways
OSHA 1926.1431(a) generally bars crane personnel hoisting unless conventional access is more hazardous or impossible because of the design or site, with specific exceptions to paragraph (a).
For a suspended personnel platform, 1926.1431(d)(1) limits total load including hook, load line and rigging to 50% of rated capacity at the actual radius and configuration, except during proof testing.
At each jobsite before personnel hoisting on the platform and after repair or modification, proof test the platform and rigging at 125% of the platform’s rated capacity.
The pre-lift meeting precedes the trial lift at each new work location. Trial lift the unoccupied loaded platform immediately before each shift with personnel hoisting and repeat when the rule requires it.
At platform wind above 20 mph, a qualified person must assess whether it is safe. Manufacturer or project limits may be more restrictive.
Decide if personnel hoisting is permitted
OSHA 1926.1431 adds protections when construction employees are hoisted. Paragraph (a) normally prohibits this access method unless the employer shows that erecting, using and dismantling conventional access would be more hazardous or is impossible because of structural design or site conditions. Consider feasible alternatives such as a scaffold, aerial lift, personnel hoist, ladder or stairway. Cost or delay alone does not meet the access test. Paragraph (a) has exceptions for work covered by Subpart R and routine shaft access to an underground worksite covered by 1926.800.
A compliant platform is normally required under paragraph (b). The limited platform exceptions have their own conditions for operations such as specified drill shafts, pile driving, marine personnel transfer, and certain tank, shaft and chimney work. This example uses the usual construction rule for a suspended platform.
Check crane setup, capacity and equipment
- Setup. The crane must be within 1% of level grade on footing a qualified person determines to be sufficiently firm and stable. Where the crane has outriggers or stabilizers, extend and lock all of them equally as specified by the manufacturer's procedures and charts.
- Capacity. Under paragraph (d)(1), compare the total suspended-platform load, including the hook, load line and rigging, with 50% of the crane capacity for the actual radius and configuration. Proof testing is an exception to this specific limit. Check all radii on the path and follow the manufacturer’s chart conventions so each weight is accounted for once. The platform’s own rated payload and occupant limits also apply.
- Devices. Check the requirements for that equipment in (d)(5), including the appropriate boom and jib angle indicators and limiting devices, and extended length indication or marks for telescoping booms. Use an anti-two-block device that automatically prevents damage and load failure at all points where two-blocking could occur, subject to the pile driving provision. Use a system to control load lowering other than the hoist brake. The required devices must work, and operations must safely stop if one fails. The rule does not allow substitute measures for these devices during personnel hoisting.
- While stationary. When the occupied platform is in a stationary working position, use the required hoist, boom and swing braking and secondary locking or braking features. Direct attachment to a luffing jib is prohibited.
Verify platform and rigging
A qualified person familiar with structural design designs the platform and its attachment or suspension system. The system must keep the platform within 10 degrees of level regardless of boom angle and minimize tipping from occupant movement. The platform itself, excluding the guardrail system and personal fall arrest anchorages, must support its own weight plus at least five times the maximum intended load without failure.
Check the Subpart M guardrail system, lower enclosure up to the midrail with a maximum half-inch opening for expanded metal, interior grab rail except at gates or doors, posted weight and rated capacity, and any falling-object protection required. Access doors must resist accidental opening. They ordinarily cannot swing outward, with a narrow exception if the platform size makes safe inward-opening access infeasible. Keep necessary tools and materials secured and distributed. The occupant count is limited to the lesser of the design count and the number needed for the work.
Paragraph (g) requires platform connection hardware that closes and locks as specified. Hooks must close and lock across the throat. Alloy anchor shackles used in place of hooks can use a bolt, nut and retaining pin, or a screw pin secured against accidental removal. Arrange any rope bridle to share the load evenly via the master link or shackle. Rigging and hooks must be capable of supporting at least five times the maximum intended load applied to the component. For slings using rotation-resistant rope, the requirement is ten times the maximum intended load. Use thimbles in wire-rope sling eyes and dedicate suspension bridles and associated rigging to personnel hoisting.
Keep the checks separate
| Check | Time and purpose |
|---|---|
| Pre-lift meeting, (m) | Before the trial lift at each new work location and repeated for newly assigned employees. The operator, signalperson if used, employees to be hoisted and person responsible for the task review the rules and procedure. |
| Proof test, (j) | At each jobsite before hoisting employees on the platform and after repair or modification, test the platform and rigging to 125% of the platform’s rated capacity. Lower by controlled lowering, brake and hold suspended with the test load evenly distributed for at least five minutes. A competent person inspects the platform and rigging and determines whether it passed. Correct any hazardous deficiencies and retest. |
| Trial lift, (h)(1)–(4) | Immediately before each shift with personnel hoisting, trial lift the unoccupied platform loaded at least to the anticipated liftweight from each applicable entry location to the intended locations following the method to be used. Repeat after moving and setting up, or after a route change unless the competent person determines the new route adds no factors affecting safety. The competent person verifies the devices, path, radius and 50% condition and then immediately inspects the equipment, support and platform and confirms test-weight removal at the end of the trial process. The proof test can be concurrent if both sets of requirements are met. |
| Occupied check, (h)(5)–(6) | Immediately before each lift, raise the occupied and loaded platform a few inches. A competent person verifies stability and balance and checks the hoist ropes and centered attachment, including seating if slack occurred. Correct hazards before hoisting people. |
Conditions during hoisting
Use slow, controlled movement. Employees who are hoisted remain in direct communication with the signalperson if used, or with the operator. If operations require signals and transmission is interrupted, stop safely under 1926.1419(f), with resumption after restored signaling and a proper signal that is understood. Use applicable electronic signal rules in 1926.1420. Use personal fall arrest attached within the platform as specified by (k)(10), which addresses water work separately through 1926.106. Use tag lines when necessary to control the platform. Before hoisting, identify how to retrieve occupants if normal lowering is unavailable. Review who calls the rescue team, how it communicates with the crew, and which alternate access or recovery method can reach the platform at each planned elevation. For fall arrest systems subject to §1926.502(d)(20), the employer must arrange prompt rescue after a fall or assure that workers can rescue themselves. Consider the separate water rescue arrangements in section 5.2 when working over or near water.
Under (k)(8), sustained wind or gusts exceeding 20 mph at the platform trigger a qualified person’s determination of safety. Dangerous weather or other existing or impending danger also calls for a qualified person’s decision. If unsafe, do not begin or safely terminate an ongoing lift. Apply governing equipment and project restrictions as well. Under (n), personnel hoisting within 20 ft of a line up to 350 kV or within 50 ft of a line over 350 kV is prohibited except for Subpart V work.
Worked example: construction repair at a flare structure
Two technicians must reach a 140 ft repair location. For this exercise, assume the employer has assessed the available conventional access methods and established the required exception under paragraph (a). An aerial lift with insufficient reach is only one input to that evaluation. The approved load path requires a maximum 65 ft radius. The applicable gross chart value at the governing configuration and radius is 12,400 lb. Under the stipulated chart instructions, account for the following separately:
| Component | Weight |
|---|---|
| Empty platform | 1,100 lb |
| Bridle and master link | 150 lb |
| Personnel | 420 lb |
| Personal equipment and tools | 130 lb |
| Hook block | 1,200 lb |
| Applicable load-line weight | 200 lb |
| Total crane load | 3,200 lb |
The suspended-platform ceiling is 6,200 lb, or 50% of 12,400 lb. The demand is 3,200 ÷ 6,200 × 100 = 51.61% of that ceiling, and 25.81% of the gross chart rating. The crane capacity check passes at this configuration on the supplied assumptions. Platform payload is 550 lb. For a platform rated to carry 1,250 lb, the site proof test uses a distributed test payload of 1,562.5 lb. The trial lift for this work uses at least the anticipated liftweight, for example the unoccupied platform with 550 lb replacing the planned payload while keeping the same gear, and checks each intended placement. Hold personnel hoisting until the required meeting, inspections, tests and field controls are in place.
On a construction job where OSHA 1926.1431(a) applies, what must the employer demonstrate to justify using a crane to hoist employees?
It is quicker than using a scaffold
Conventional access would be more hazardous or impossible because of the structural design or site conditions
The operator prefers the crane and has a supervisor’s waiver
The operator has at least 1,000 hours on that crane model
In ordinary personnel hoisting with a suspended platform, the gross crane chart rating at the governing configuration and radius is 12,400 lb. The hook and load line are counted in the gross demand. What is the limit for the complete suspended crane load, including hook, line and rigging?
6,200 lb
5,600 lb after starting by removing a 1,200 lb block from the gross rating
9,300 lb
12,400 lb with an operational anti-two-block device
Which verification does OSHA 1926.1431(h) require immediately before each shift in which personnel will be hoisted?
A dynamic drop test with personnel on board
A proof test at 125% solely because another shift is starting
A trial lift with the unoccupied platform loaded at least to the anticipated liftweight, to the intended locations
An occupied lift to final height with a spotter observing the platform