7.1 Rigging Inspection Standards & Removal Criteria
Key Takeaways
For construction, §1926.251 requires pre-use inspection each shift and as necessary during use. Each day before use a designated competent person inspects slings and their fastenings and attachments.
Alloy chain slings in use require thorough periodic inspection at most 12 months apart and a record of the most recent month each was inspected.
Inspect and apply identification requirements by gear type. Withdraw a sling with missing required identification or damage.
Use removal criteria for the actual sling or hook. For B30.10-2024 hooks, visible bend or twist calls for removal. The applicable throat-opening criterion addresses distortion and the manufacturer’s recommendations.
Inspect at the required intervals
OSHA §1926.251 requires rigging equipment for material handling to be inspected before use on each construction shift and as needed during use. Under (a)(6), each day before use a competent person designated by the employer checks each sling and its fastenings and attachments for damage. Check again when service conditions warrant. Remove damaged or defective rigging immediately. The qualification to perform rigging work and the appointment and authority to perform this inspection serve different purposes.
Under §1926.251(b)(6), an alloy steel chain sling in use also receives a thorough periodic inspection. The frequency depends on use, severity, nature of the lifts and service experience, with no more than 12 months between inspections. The employer records the most recent month of thorough inspection for each chain sling. ASME B30.9-2025, cited by the CCO handbook, organizes inspection, removal and repair by sling type. When a sling is newly received, modified or returned from repair, verify the applicable initial inspection and any required proof-test documentation before releasing it. Determine the periodic interval and record for the applicable sling and service. For example, OSHA’s wire-rope and roundsling guidance suggests yearly inspection for normal service, monthly to quarterly for severe service, and a qualified person’s recommendation for special or infrequent service, within its stated 12-month limit. Determine which inspection records the governing standard requires.
Match markings to the equipment
| Sling | Examples of required construction identification |
|---|---|
| Welded alloy steel chain | Under §1926.251(b)(1), size, grade, rated capacity and sling manufacturer. |
| Wire rope | Under (c)(16), size, capacities for applicable hitches and the angle basis, and number of legs for a multi-leg sling. |
| Synthetic web | Under (e)(1), manufacturer name or trademark, capacities by hitch and material. |
Keep markings affixed and legible under §1926.251(a)(2). If the tag fails, remove the gear from use and let the employer use the authorized identification or replacement process for that equipment. Measure the item for condition, but do not assign a working load from its dimensions or appearance. A roundsling cover color is also insufficient to establish its capacity.
Look for damage by construction
- Alloy chain. Look for cracks, bent or twisted links, signs of stretching, wear at bearing points and damage to end fittings. Under §1926.251(b)(5), use the applicable Table H-1 wear values and check the manufacturer’s criteria for the sling and any other restrictions. Never continue because wear appears low on average when one link fails a limit.
- Wire rope sling. Look for broken wires, kinking, crushing, birdcaging, severe localized wear, heat or corrosion, and damaged end fittings. Lift-All’s wire rope sling inspection criteria, for example, flag 10 broken wires in one lay or five in a single strand of that lay. A lay is the length along the rope for one complete wrap of a strand around the rope. Check §1926.251(c)(4)(iv) and the governing sling criteria. A crane’s running rope is inspected separately under §1926.1413, with requirements depending on the rope and fault.
- Synthetic web. Section 1926.251(e)(8) includes acid or caustic burns, melting or charring, snags, punctures, tears, cuts, worn or broken stitching and distorted fittings. Check the full length, edges and eyes. A red warning yarn, if fitted, can reveal damage, and a damaged sling can fail its inspection before a warning yarn appears.
- Synthetic roundsling. Check the cover and condition of the load-bearing yarns using the manufacturer’s procedures. A cut exposing the core, apparent damage to core yarns, a knot in the sling body or evidence of chemical or heat damage calls for removal. The cover helps protect the yarns and its color does not establish serviceability.
Apply the hook rule in its setting
ASME B30.10-2024 paragraph 10-1.10.5 addresses removal of load-handling hooks for conditions including visible bending or twisting, cracks, wear, and distorted throat opening. It specifies an increase of 5% with a 1/4 in (6 mm) cap on the allowed increase, or the manufacturer’s recommendation. Check that any required latch closes and any self-locking hook locks. Keep removed hooks out of service until cleared under the applicable repair or replacement criteria. The numerical twist provision in §1910.179 belongs to the federal general-industry overhead and gantry crane rule. Use the standard and equipment instructions for the setting at hand.
Worked inspection. A hook with a reference opening of 6.00 in now measures 6.28 in. Five percent of 6.00 in is 0.30 in, but the 1/4 in cap is 0.25 in. With the B30.10-2024 criterion and no different manufacturer limit in this example, the 0.28 in increase warrants removal. A visibly bent hook would also require removal, even if the opening measured within its limit.
A wire rope sling is covered by Lift-All’s wire rope sling instructions. Which of the following reaches a broken-wire removal criterion?
Five broken wires in one strand within one rope lay.
Five broken wires spread across different rope lays with no other damage.
Five broken wires among separate strands over three rope lays.
Any single visible wire, regardless of whether it is broken.
What is the federal OSHA requirement for the thorough periodic inspection of alloy steel chain slings in construction use?
Inspect only when a link is visibly deformed.
One inspection covers all slings of the same size if the tags match.
Inspect at intervals no greater than 12 months, adjusted for service conditions, and record the most recent inspection month for each sling.
A new tag eliminates the periodic inspection.
A hook covered by ASME B30.10-2024 has a clear bend from its original plane but passes the measurement for its throat-opening limit. What should happen?
Keep it in use while the opening remains within the limit.
Remove it from service and follow the applicable evaluation and return criteria.
Proof-load it in the field and use it if it takes the load.
Use it for light loads until the next inspection.