6.3 Environmental Impact, Pollution and Waste Controls

Key Takeaways

  • Screen the activity and project location against the applicable federal or state instrument. Section 34A report approval precedes carrying out a prescribed activity where the federal route applies.

  • Use the particular offence and penalty wording as amended. Inland waters, Malaysian waters, EIA and scheduled waste provisions have distinct sanctions.

  • Apply the two ordinary storage limits for scheduled waste together. Confirm notification, inventory, labelling, consignment and approved receiving arrangements.

  • Check the geographically applicable construction solid waste scheme separately from the scheduled waste regime.

Last updated: November 2026

Screen the activity and the approval route

Start with the site's location, footprint, operations and receiving environment. The Environmental Quality Act 1974 (Act 127) addresses environmental quality and pollution. Under section 34A and the Environmental Quality (Prescribed Activities) (Environmental Impact Assessment) Order 2015, screen the activity against the listed descriptions, thresholds and location rules. Dividing the work into smaller packages can still leave it within paragraph 3(4). First Schedule activities ordinarily do not require public display or comment unless the Director General instructs it in writing. Second Schedule activities require both.

Section 34A requires the proponent to appoint a qualified person to assess environmental impact and submit the report. Under subsection (2B) the submitting person has statutory responsibilities for the report and recommendations, the accuracy of its information and professional indemnity insurance. Under subsection (6) the prescribed activity must wait until the required report has been submitted and approved. After approval, subsection (7) requires sufficient proof of compliance with conditions and incorporation of measures into design, construction and operation. Approval of the environmental report and the authority's development approval serve different functions. Under section 34AA the Director General can issue a prohibition or stop-work order on the grounds specified there.

A 60-hectare housing development in Johor meets the 50-hectare threshold in the First Schedule housing item. Screen for all other relevant activities and project features. Assume this site triggers only that item. The project team should check whether public display or comment has been directed and record the environmental approval and development approval before releasing the relevant work.

Paragraph 4 of the 2015 Order identifies the specific federal scheduled activities for Sabah and Sarawak. Also check the applicable state laws, including Sabah's 2002 Environment Protection Enactment and 2005 EIA Order, or Sarawak's Natural Resources and Environment Ordinance and prescribed activities. Act A1793, in operation from 31 July 2026, added section 1(3), which allows the Minister to suspend all or part of Act 127 in a part of Malaysia by gazetted order. For a regional scenario, check any applicable suspension order, its scope and the relevant date.

Match the offence to its own penalty

The 2024 amendment Act A1712 came into effect on 7 July 2024. The penalties below concern the specific contraventions in the stated subsections. Use the full provision for the circumstances triggering the offence and any further consequence.

ProvisionPenalty structure upon conviction
Section 24(3), contravention of the soil rule in section 24(1)A fine of RM50,000–RM500,000, imprisonment up to five years, or both. The section also addresses a continuing offence after the Director General's notice.
Section 25(3), contravention of the inland waters rule in section 25(1)Imprisonment up to five years and liability to a fine of RM50,000–RM10 million.
Section 29(2), contravention of the Malaysian waters rule in section 29(1)Fine of RM50,000–RM10 million, imprisonment up to five years, or both.
Section 34A(8), contravention of the EIA sectionImprisonment up to five years and liability to a fine of RM100,000–RM1 million.
Section 34B(4), contravention of the scheduled wastes sectionImprisonment up to five years and liability to a fine of RM100,000–RM10 million.

Worked decision: site oil and demolition debris

At a Johor Bahru site, the project generates spent lubricating oil and uncontaminated concrete rubble. Classify the oil against the First Schedule of the Environmental Quality (Scheduled Wastes) Regulations 2005. Spent lubricating oil is identified as SW305. Check where it can be treated, recovered or disposed of under the Act and regulations. The ordinary onsite storage rule in regulation 9 requires both 180 days or less from generation and no more than 20 metric tonnes accumulated. The Director General can direct removal and can approve a written application to store more than 20 metric tonnes under the regulation. At day 100 and 21 tonnes, the ordinary quantity rule is already exceeded. Check the approval, arrange lawful handling and use the required inventory, labels and consignment records. DOE's eSWIS supports those records.

The rubble's construction solid waste route depends on the applicable local scheme. Johor Bahru is listed in the First Schedule of the 2018 Act 672 construction solid waste scheme. Check the applicable collection licence, arrangements for the separated waste and prescribed receiving facility. Verify both waste streams independently in the site records.

Act 127 · Act A1712 · Act A1793 · 2026 commencement · Federal EIA Order · Sabah EIA Order · Sarawak ordinance · Scheduled Wastes Regulations · DOE eSWIS · Construction waste licensing · Construction waste scheme

Test Your Knowledge

A 60-hectare housing development in Johor meets only the federal First Schedule housing item. No public display or comment has been directed. Which approval step applies before carrying out the prescribed activity?

A

The local planning approval replaces the EIA report approval

B

The required EIA report must be submitted and approved under section 34A

C

Only Second Schedule activities require any EIA

D

Dividing the site into two phases removes the prescribed activity status

Test Your Knowledge
Multi-Select

Which statements about the amended Act 127 and waste rules are accurate? Select all that apply.

Select all that apply

Section 34A(8) prescribes imprisonment up to five years and provides for a fine of RM100,000 to RM1 million.

Section 25(3) and section 29(2) use identical imprisonment and fine alternatives.

Section 24(3) allows a fine of RM50,000 to RM500,000, imprisonment up to five years, or both, with a stated continuing offence provision.

Without approval for additional storage or any applicable special arrangement, 21 metric tonnes on day 100 exceeds the ordinary regulation 9 limit.