BEM PCE Part A Common Paper Cheat Sheet

Practice Questions

Laws Governing the Engineering Profession

Not publishedof exam

Registration and corporate controlDiscipline and CPDREA 1967 Registration TiersECP Ownership & Structure

Responsibility to Society and the Public

Not publishedof exam

Professionalism

Not publishedof exam

BEM Code & CircularsCurrent takeover and signing rulesCompletion certification dutiesMultidisciplinary responsibility

Relevant Laws

Not publishedof exam

Risk assessment and safe workBuilding and stage certificationEnvironmental and levy obligationsConditional statutory thresholds

Construction Contract Law

Not publishedof exam

Contract Forms, EOT & LADCIPAA 2012 AdjudicationVariation and delay analysisCompletion and outstanding obligations

Consultant Project-Stage Duties

Not publishedof exam

Six Stages: Consultant DeliverablesProject Stage Decision PickerTender authority and evaluationHandover and defects responsibilities

Management of Engineering Consultancy Practice

Not publishedof exam

Governance, IP and EmploymentConsultancy Scope and Project ControlsWritten appointment and feesProfessional indemnity conditions

Quick Facts

Exam
BEM PCE Part A Common Paper
Owner
Board of Engineers Malaysia
Paper 1
40 questions; 105 minutes
Essay writing
Three of five; 120 minutes
Essay reading
Additional 15 minutes
Pass
50% each paper; same sitting
Format
Open-book objective and essay
Entry
BEM-registered Professional Engineer
Partial pass
Seven years to clear remaining part
New application
RM1,000 exam + RM100 processing

PE and PEPC Submission Authority

PE

  • Professional registration
  • Section 8A specific submission exception
  • Not general PEPC submission authority

PEPC

  • Practising certificate registration
  • General section 8 submission route
  • Branch and legal limits remain

Apply authority and exceptions together

REA 1967 Registration Tiers

Section 10(1) Graduate
Recognised qualification; BEM registration
Regulation 22 Experience
Three years: two general, one professional
Malaysian Experience
Normally one year; Board exceptions apply
Section 10(2) PE
Assessment or other recognised pathway
Section 10D PEPC
Practising registration; PCE prerequisite
Former Section 10A
Deleted in 2015
Section 8A Exception
PE product submissions; statutory conditions apply

ECP Ownership & Structure

Sole Proprietorship ECP
Proprietor must hold PEPC
Partnership ECP
Every partner must hold PEPC
Section 7A Corporate Equity
Former 70% requirement deleted
Section 7A Capital
At least RM50,000 paid-up
Section 7A Directors
At least two-thirds PEPC
Section 7B Capital
At least RM150,000 paid-up
Section 7B Equity
60% professionals; at least 10% PEPC
Engineering Decisions
Authorised PEPC director controls daily decisions

Disciplinary & CPD Rules

Section 15(1A) Warning
Written warning or reprimand
Section 15(1A) Fine
Maximum RM50,000
Section 15(1A) Suspension
Maximum two years
Section 15(1A) Cancellation
Registration may be cancelled
Section 19 Appeal
Within 21 days of notification
PEPC CPD
Average 50 hours; three rolling years

Skill and Care versus Promised Result

Reasonable Skill and Care

  • Assess professional conduct
  • Competence, investigation and diligence
  • BEM Form 1999 clause 5.1

Express Fitness for Purpose

  • Assess the agreed result obligation
  • Read exact purpose and risk allocation
  • Care alone may not discharge promise

Do not treat obligations as interchangeable

Civil Wrongs and Design Liability

Negligence
Duty, breach, causation and recoverable damage
Negligent Misstatement
Careless advice; duty/reliance conditions matter
Private Nuisance
Unreasonable interference with land enjoyment
Defamation
Reputation-harming publication; elements/defences still matter
Contract and Tort
Different duties may coexist
Reasonable Skill and Care
Professional conduct standard; not guaranteed outcome
Express Fitness for Purpose
Agreed result may impose stricter obligation
Code Compliance
Relevant evidence; not automatic liability immunity

Limitation: Peninsular Malaysia

Section 6 General Rule
Six years from cause-of-action accrual
Section 6A Claim Type
Negligence damages without personal injury
Section 6A Knowledge Route
Three years; later-expiry condition applies
Section 6A Longstop
15 years from cause-of-action accrual
Completion Date
Not universally cause-of-action accrual
Special Rules
Check other statutes and applicable extensions
Sabah and Sarawak
Separate limitation regimes; verify applicable law

Consultancy Takeover & Signing Picker

  1. Taking over another engineer’s appointment→Establish a Regulation 31 route(Current amendment: November 2025)
  2. First engineer consents→Record consent and responsibility boundaries(One permitted route)
  3. Appointment formally terminated; fees confirmed paid→Document termination and confirmation(Another permitted route)
  4. Fees disputed after termination→Client may request BEM stakeholder(Not automatic clearance)
  5. No established consent/termination route→Seek BEM approval(Third permitted route)
  6. Dangerous judgment overridden→Notify client/employer and appropriate authority(Circular 001)
  7. Completion certification requested→Verify supervision control and compliance(Both required)
  8. Combined multidisciplinary submission→Qualified PEPC signs each technical segment(Coordination is not specialist competence)

BEM Code & Circulars

Regulation 24
Public safety, health and interest paramount
Competence and Control
Sign within competence; direct/control preparation
Completion Certification
Supervision control plus design compliance
Regulation 32
Specified business interests require BEM approval
Regulation 33
Disclose relevant financial interests in writing
Regulation 31
Consent, terminated-and-paid, or BEM approval
Safety Judgment Overruled
Notify client/employer and appropriate authority

HIRARC Action Chain

Identify → Assess → Control → Review

Identify hazardsAssess affected peopleImplement effective controlsReview changed conditions

CCC and Legacy CFO

CCC

  • PSP issues Form F
  • Applicable stage certifications required
  • Council enforcement powers remain

Legacy CFO

  • Local authority issued certificate
  • Different applicable approval regime
  • Check project and state transition

Professional certification retains statutory oversight

Site Statutory Compliance Picker

  1. Construction contract exceeds RM20 million→Appoint required competent SHO(Prescribed construction workplace)
  2. Outside SHO classes; five employees→Appoint employee OSH Coordinator(Appointed SHO satisfies this duty)
  3. 40 employees or DG direction→Establish safety committee(Distinct from SHO appointment)
  4. Leviable contract above RM500,000→Apply 0.125% to total value(Check exemptions separately)
  5. Section 85A inspection notice served→Appoint engineer; meet notice deadline(Buildings and qualifying slopes)
  6. Prescribed EIA activity identified→Obtain approval before carrying out(Apply approval conditions)

OSHA 1994 & 2022 Amendments

Section 15 Duty
Employee protection, so far as practicable
Section 19 Maximum Penalty
RM500,000; two years; or both
Section 18B
Assess risks and implement required controls
SHO Construction Trigger
Contract exceeds RM20 million
Section 29A Coordinator
Five employees; outside prescribed SHO classes
Section 30 Committee
40 employees or Director General direction
Section 26A Withdrawal
Notify employer; danger remains without action

CCC Evidence Chain

Inspect → Verify → Certify → Deposit

Applicable G stagesG8 passive; G9 active fireDo not fabricate inapplicable stagesDeposit Form F within 14 days

PSP and Discipline Submitting Person

PSP

  • Coordinates building compliance
  • Collects applicable stage certifications
  • Issues CCC when requirements satisfied

Discipline SP

  • Submits particular discipline plans
  • Supervises responsible discipline works
  • Certifies applicable completed stages

Coordination differs from discipline responsibility

SDBA 1974 & UBBL CCC

Principal Submitting Person
Coordinates completion; issues Form F
Discipline Submitting Person
Responsible for particular plans/stage certifications
Forms F and F1
Full and partial CCC
Inapplicable Form G
Proper declaration; never fabricate certification
Section 70(27) Maximum
RM250,000; ten years; or both
Section 70A Earthworks
Plans and approval before starting
Section 85A Buildings
Over five storeys; notice-driven inspections
Section 85A Slopes
Over 25° and over 10m
Form F Deposit
Within 14 days after issuance

First and Second EIA Schedules

First Schedule

  • Prescribed activity requires EIA
  • No equivalent mandatory public-display process
  • Executive-summary access is separate

Second Schedule

  • Prescribed activity requires EIA
  • Public display and comment required
  • Observe activity and jurisdiction conditions

Disclosure access differs from consultation procedure

Environmental and Levy Duties

Section 34A EIA
Prescribed activity: approval before implementation
Second Schedule EIA
Public display and comment required
Environmental Management Plan
Responsibilities, controls, monitoring and maintenance
Erosion/Sediment Control Plan
Stabilisation, drainage and sediment retention
CIDB Levy
0.125% total value; above RM500,000
Levy Exemptions
Assess applicable exemption separately
Forms G8 and G9
Passive and active fire protection

CIPAA Clock Anchors

Response 10; claim 10; response 10; reply 5

All these are working daysDecision: later response/reply +45No response: response expiry +45Further agreed time may apply

PWD 203 and PWD 203A

PWD 203

  • Drawings and specifications form
  • S.O. administers contract
  • Read executed revision and addenda

PWD 203A

  • Bills of quantities form
  • S.O. administers contract
  • Measure and value under governing clauses

Select the actual contract’s valuation rules

Construction Contract & CIPAA Picker

  1. Employer-caused delay alleged→Analyse EOT clause and critical impact(No automatic money entitlement)
  2. Authorised variation changes work→Measure and apply contractual valuation rules(Keep contemporaneous records)
  3. Performance bond demand proposed→Check instrument conditions and expiry(Not every bond is unconditional)
  4. Adjudicated amount remains unpaid→Serve statutory suspension notice(Wait 14 calendar days)
  5. Direct principal payment requested→Check money due from principal(Section 30 conditions)

Contract Forms, EOT & LAD

LOI or LOA
Read obligations; label alone insufficient
PWD 203
Drawings and specifications form
PWD 203A
Bills of quantities form
EOT Entitlement
Qualifying delay; notices and evidence
Section 75 LAD
Reasonable compensation; stipulated sum ceiling
Performance Bond
Read demand conditions and expiry
Practical Completion
Does not erase outstanding obligations

CIPAA 2012 Adjudication

Section 3 Exclusion
Natural person; <4 storeys; own occupation
Section 35
Third-party/funding-dependent payment terms void
Payment Response
10 working days after claim receipt
Adjudication Claim
10 working days after acceptance receipt
Adjudication Response
10 working days after claim receipt
Adjudication Reply
Five working days after response receipt
Decision Clock
45 working days; later response/reply
No Adjudication Response
Decision clock starts at response expiry
Section 29 Suspension
14 calendar days after written notice

Six Syllabus Project Stages

Preliminary; Design-I; Design-II; Tender; Construction; Post-construction

Feasibility and preliminaryTwo design stagesTender and constructionPost-construction responsibilities

Project Stage Decision Picker

  1. Site data insufficient for selecting scheme→Advise investigations and compare feasible options(Feasibility/preliminary)
  2. Client selected proposal; interfaces unresolved→Coordinate scheme, criteria and typical calculations(Design I)
  3. Scheme approved; pricing documents needed→Complete detailed calculations, specifications and drawings(Design II)
  4. Offers received; award decision pending→Evaluate tenderers and advise client(Tender; written instruction before acceptance)
  5. Contractor proposes work or seeks certification→Inspect evidence; instruct/certify within appointment(Construction)
  6. Works handed over; defects remain→Track rectification and final-certification obligations(Post-construction; deliver required operating records)

Six Stages: Consultant Deliverables

Feasibility/Preliminary
Investigate constraints; advise options and viability
Design I
Develop coordinated scheme and design basis
Design II
Detail calculations, drawings, specifications and submissions
Tender
Evaluate suitability and offers; advise client
Construction
Inspect, instruct and certify within authority
Post-construction
Records, defects and final-certification duties
BEM Form 5.7
Written client instruction before tender acceptance
BEM Form 8.7
Site visits differ from continuous supervision
BEM Form 2.7
Engagement normally continues through final-retention certificate
Stage Boundaries
Follow appointment and applicable work type

Total and Free Float

Total Float

  • Delay without moving project finish
  • Equals LS minus ES
  • Under stated CPM assumptions

Free Float

  • Delay without moving successor’s early start
  • Minimum successor ES minus EF
  • For zero-lag finish-to-start relationships

Project finish differs from successor start

Project Control & Economy Picker

  1. Unconstrained CPM activity has zero float→Monitor critical-path completion impact(Multiple critical paths may exist)
  2. CPI below one→Investigate cost inefficiency(AC exceeds EV)
  3. SPI below one→Investigate earned-value schedule shortfall(Not days late)
  4. Comparing mutually exclusive alternatives→Compare NPV on consistent basis(Respect budget and other constraints)
  5. Alternatives have lifecycle costs→Include operations, replacements and disposal(Common analysis period)

Consultancy Scope and Project Controls

Fee and Reimbursable Scope
Agreement plus applicable BEM fee framework
Written Appointment
Define scope, responsibilities and fees
CPM Total Float
LS − ES; assess network assumptions
CPM Free Float
Successor ES − current EF; zero-lag
CPI
Earned value ÷ actual cost
SPI
Earned value ÷ planned value
NPV Comparison
Same horizon, discount basis and constraints
Claims-Made Insurance
Check retroactive date and notification terms

Governance, IP and Employment

Directors: Companies Act 213
Proper purpose, good faith and diligence
Conflicted Transaction
Disclose; follow applicable approval/participation rules
Company Records
Document informed decisions and supporting evidence
BEM Form Copyright
Consultant retains; client receives project licence
Reuse on Another Project
Obtain required written approval and terms
Infringement Exposure
Civil remedies; specified offences criminally punishable
Employment Act Territory
Peninsular Malaysia and Labuan
Employment Act Coverage
Contract-of-service employees; specific benefit exceptions
Above RM4,000 Wages
Check occupational exceptions before excluding overtime
Minimum Employment Terms
Less-favourable contractual terms cannot displace statute
Sabah/Sarawak Employment
Apply respective labour ordinances

Common Traps

Registration and Practising Authority

PE registration ≠ PEPC practising registration

Equity and Professional Control

Corporate share ownership ≠ Qualified director decision control

Paper and Part Pass

One paper passed ≠ Both papers of a part passed

Response Silence and Admission

Deemed dispute of entire claim ≠ Admission of payment liability

Hardship and Frustration

More expensive performance ≠ Supervening impossibility or illegality

Time Relief and Compensation

Extension of completion date ≠ Entitlement to additional payment

Contract Security

Performance bond instrument ≠ Contractual retention money

Separate Appeal Procedures

PCE examination result appeal ≠ Section 19 disciplinary appeal

Licence Scope and File Possession

Possessing a drawing file ≠ Permission for another-project reuse

Completion and Legal Time Limits

Practical completion date ≠ Cause-of-action accrual or statutory knowledge

Last Minute

  1. 1.Objective: 40 questions; 105 minutes
  2. 2.Essays: three answers; 120 minutes
  3. 3.Essay reading: additional 15 minutes
  4. 4.Both papers need 50% same sitting
  5. 5.Partial part pass: seven years
  6. 6.First sitting includes Parts A/B
  7. 7.Section 7A: no former 70% equity
  8. 8.Section 7B: 60% professionals; 10% PEPC
  9. 9.Discipline appeal: 21 days after notification
  10. 10.Takeover: apply amended Regulation 31
  11. 11.Coordinator threshold includes SHO-class condition
  12. 12.Withdrawal: notify; employer fails to act
  13. 13.CIDB levy applies to total value
  14. 14.CIPAA suspension notice: 14 calendar days
  15. 15.PCE appeal: two weeks after results-receipt
  16. 16.PCE appeal payment: RM400
  17. 17.Care standard differs from result promise
  18. 18.Six stages: identify actual consultant deliverables
  19. 19.Labour rules: jurisdiction and benefit exceptions
Same family resources