Laws Governing the Engineering Profession
Not publishedof exam
Responsibility to Society and the Public
Not publishedof exam
Professionalism
Not publishedof exam
Relevant Laws
Not publishedof exam
Construction Contract Law
Not publishedof exam
Consultant Project-Stage Duties
Not publishedof exam
Management of Engineering Consultancy Practice
Not publishedof exam
Quick Facts
- Exam
- BEM PCE Part A Common Paper
- Owner
- Board of Engineers Malaysia
- Paper 1
- 40 questions; 105 minutes
- Essay writing
- Three of five; 120 minutes
- Essay reading
- Additional 15 minutes
- Pass
- 50% each paper; same sitting
- Format
- Open-book objective and essay
- Entry
- BEM-registered Professional Engineer
- Partial pass
- Seven years to clear remaining part
- New application
- RM1,000 exam + RM100 processing
PE and PEPC Submission Authority
PE
- Professional registration
- Section 8A specific submission exception
- Not general PEPC submission authority
PEPC
- Practising certificate registration
- General section 8 submission route
- Branch and legal limits remain
Apply authority and exceptions together
REA 1967 Registration Tiers
- Section 10(1) Graduate
- Recognised qualification; BEM registration
- Regulation 22 Experience
- Three years: two general, one professional
- Malaysian Experience
- Normally one year; Board exceptions apply
- Section 10(2) PE
- Assessment or other recognised pathway
- Section 10D PEPC
- Practising registration; PCE prerequisite
- Former Section 10A
- Deleted in 2015
- Section 8A Exception
- PE product submissions; statutory conditions apply
ECP Ownership & Structure
- Sole Proprietorship ECP
- Proprietor must hold PEPC
- Partnership ECP
- Every partner must hold PEPC
- Section 7A Corporate Equity
- Former 70% requirement deleted
- Section 7A Capital
- At least RM50,000 paid-up
- Section 7A Directors
- At least two-thirds PEPC
- Section 7B Capital
- At least RM150,000 paid-up
- Section 7B Equity
- 60% professionals; at least 10% PEPC
- Engineering Decisions
- Authorised PEPC director controls daily decisions
Disciplinary & CPD Rules
- Section 15(1A) Warning
- Written warning or reprimand
- Section 15(1A) Fine
- Maximum RM50,000
- Section 15(1A) Suspension
- Maximum two years
- Section 15(1A) Cancellation
- Registration may be cancelled
- Section 19 Appeal
- Within 21 days of notification
- PEPC CPD
- Average 50 hours; three rolling years
Skill and Care versus Promised Result
Reasonable Skill and Care
- Assess professional conduct
- Competence, investigation and diligence
- BEM Form 1999 clause 5.1
Express Fitness for Purpose
- Assess the agreed result obligation
- Read exact purpose and risk allocation
- Care alone may not discharge promise
Do not treat obligations as interchangeable
Legal Responsibility Decision Picker
- Neighbour alleges negligent engineering damage→Analyse duty, breach, causation and loss(No contract is not decisive)
- Client demands guaranteed design performance→Review express result obligation before accepting(Care alone may not satisfy promise)
- Defect discovered years after completion→Identify accrual, knowledge and applicable statute(Avoid universal completion-date clock)
- Older regulation contradicts effective amendment→Apply current provision within its jurisdiction(Syllabus date does not freeze law)
Legal Sources and Courts
- Federal Constitution
- Supreme law; legislation must conform
- Written Law
- Constitution, legislation and subsidiary legislation
- Common Law
- Judicial principles within Malaysian legal framework
- Public Law
- State powers and public duties
- Private Law
- Rights between persons, including companies
- Civil Claim
- Remedy for legally established wrong
- Criminal Case
- Prosecution for an alleged offence
- Subordinate Courts
- Magistrates’ and Sessions Courts
- Superior Courts
- High Courts; Appeal Court; Federal Court
- Two High Courts
- Malaya; Sabah/Sarawak; coordinate status
- Forum Selection
- Territory, subject, value and appeal rules
Civil Wrongs and Design Liability
- Negligence
- Duty, breach, causation and recoverable damage
- Negligent Misstatement
- Careless advice; duty/reliance conditions matter
- Private Nuisance
- Unreasonable interference with land enjoyment
- Defamation
- Reputation-harming publication; elements/defences still matter
- Contract and Tort
- Different duties may coexist
- Reasonable Skill and Care
- Professional conduct standard; not guaranteed outcome
- Express Fitness for Purpose
- Agreed result may impose stricter obligation
- Code Compliance
- Relevant evidence; not automatic liability immunity
Limitation: Peninsular Malaysia
- Section 6 General Rule
- Six years from cause-of-action accrual
- Section 6A Claim Type
- Negligence damages without personal injury
- Section 6A Knowledge Route
- Three years; later-expiry condition applies
- Section 6A Longstop
- 15 years from cause-of-action accrual
- Completion Date
- Not universally cause-of-action accrual
- Special Rules
- Check other statutes and applicable extensions
- Sabah and Sarawak
- Separate limitation regimes; verify applicable law
Consultancy Takeover & Signing Picker
- Taking over another engineer’s appointment→Establish a Regulation 31 route(Current amendment: November 2025)
- First engineer consents→Record consent and responsibility boundaries(One permitted route)
- Appointment formally terminated; fees confirmed paid→Document termination and confirmation(Another permitted route)
- Fees disputed after termination→Client may request BEM stakeholder(Not automatic clearance)
- No established consent/termination route→Seek BEM approval(Third permitted route)
- Dangerous judgment overridden→Notify client/employer and appropriate authority(Circular 001)
- Completion certification requested→Verify supervision control and compliance(Both required)
- Combined multidisciplinary submission→Qualified PEPC signs each technical segment(Coordination is not specialist competence)
BEM Code & Circulars
- Regulation 24
- Public safety, health and interest paramount
- Competence and Control
- Sign within competence; direct/control preparation
- Completion Certification
- Supervision control plus design compliance
- Regulation 32
- Specified business interests require BEM approval
- Regulation 33
- Disclose relevant financial interests in writing
- Regulation 31
- Consent, terminated-and-paid, or BEM approval
- Safety Judgment Overruled
- Notify client/employer and appropriate authority
HIRARC Action Chain
Identify → Assess → Control → Review
CCC and Legacy CFO
CCC
- PSP issues Form F
- Applicable stage certifications required
- Council enforcement powers remain
Legacy CFO
- Local authority issued certificate
- Different applicable approval regime
- Check project and state transition
Professional certification retains statutory oversight
Site Statutory Compliance Picker
- Construction contract exceeds RM20 million→Appoint required competent SHO(Prescribed construction workplace)
- Outside SHO classes; five employees→Appoint employee OSH Coordinator(Appointed SHO satisfies this duty)
- 40 employees or DG direction→Establish safety committee(Distinct from SHO appointment)
- Leviable contract above RM500,000→Apply 0.125% to total value(Check exemptions separately)
- Section 85A inspection notice served→Appoint engineer; meet notice deadline(Buildings and qualifying slopes)
- Prescribed EIA activity identified→Obtain approval before carrying out(Apply approval conditions)
OSHA 1994 & 2022 Amendments
- Section 15 Duty
- Employee protection, so far as practicable
- Section 19 Maximum Penalty
- RM500,000; two years; or both
- Section 18B
- Assess risks and implement required controls
- SHO Construction Trigger
- Contract exceeds RM20 million
- Section 29A Coordinator
- Five employees; outside prescribed SHO classes
- Section 30 Committee
- 40 employees or Director General direction
- Section 26A Withdrawal
- Notify employer; danger remains without action
CCC Evidence Chain
Inspect → Verify → Certify → Deposit
PSP and Discipline Submitting Person
PSP
- Coordinates building compliance
- Collects applicable stage certifications
- Issues CCC when requirements satisfied
Discipline SP
- Submits particular discipline plans
- Supervises responsible discipline works
- Certifies applicable completed stages
Coordination differs from discipline responsibility
SDBA 1974 & UBBL CCC
- Principal Submitting Person
- Coordinates completion; issues Form F
- Discipline Submitting Person
- Responsible for particular plans/stage certifications
- Forms F and F1
- Full and partial CCC
- Inapplicable Form G
- Proper declaration; never fabricate certification
- Section 70(27) Maximum
- RM250,000; ten years; or both
- Section 70A Earthworks
- Plans and approval before starting
- Section 85A Buildings
- Over five storeys; notice-driven inspections
- Section 85A Slopes
- Over 25° and over 10m
- Form F Deposit
- Within 14 days after issuance
First and Second EIA Schedules
First Schedule
- Prescribed activity requires EIA
- No equivalent mandatory public-display process
- Executive-summary access is separate
Second Schedule
- Prescribed activity requires EIA
- Public display and comment required
- Observe activity and jurisdiction conditions
Disclosure access differs from consultation procedure
Environmental and Levy Duties
- Section 34A EIA
- Prescribed activity: approval before implementation
- Second Schedule EIA
- Public display and comment required
- Environmental Management Plan
- Responsibilities, controls, monitoring and maintenance
- Erosion/Sediment Control Plan
- Stabilisation, drainage and sediment retention
- CIDB Levy
- 0.125% total value; above RM500,000
- Levy Exemptions
- Assess applicable exemption separately
- Forms G8 and G9
- Passive and active fire protection
CIPAA Clock Anchors
Response 10; claim 10; response 10; reply 5
PWD 203 and PWD 203A
PWD 203
- Drawings and specifications form
- S.O. administers contract
- Read executed revision and addenda
PWD 203A
- Bills of quantities form
- S.O. administers contract
- Measure and value under governing clauses
Select the actual contract’s valuation rules
Construction Contract & CIPAA Picker
- Employer-caused delay alleged→Analyse EOT clause and critical impact(No automatic money entitlement)
- Authorised variation changes work→Measure and apply contractual valuation rules(Keep contemporaneous records)
- Performance bond demand proposed→Check instrument conditions and expiry(Not every bond is unconditional)
- Adjudicated amount remains unpaid→Serve statutory suspension notice(Wait 14 calendar days)
- Direct principal payment requested→Check money due from principal(Section 30 conditions)
Contract Forms, EOT & LAD
- LOI or LOA
- Read obligations; label alone insufficient
- PWD 203
- Drawings and specifications form
- PWD 203A
- Bills of quantities form
- EOT Entitlement
- Qualifying delay; notices and evidence
- Section 75 LAD
- Reasonable compensation; stipulated sum ceiling
- Performance Bond
- Read demand conditions and expiry
- Practical Completion
- Does not erase outstanding obligations
CIPAA 2012 Adjudication
- Section 3 Exclusion
- Natural person; <4 storeys; own occupation
- Section 35
- Third-party/funding-dependent payment terms void
- Payment Response
- 10 working days after claim receipt
- Adjudication Claim
- 10 working days after acceptance receipt
- Adjudication Response
- 10 working days after claim receipt
- Adjudication Reply
- Five working days after response receipt
- Decision Clock
- 45 working days; later response/reply
- No Adjudication Response
- Decision clock starts at response expiry
- Section 29 Suspension
- 14 calendar days after written notice
Six Syllabus Project Stages
Preliminary; Design-I; Design-II; Tender; Construction; Post-construction
Project Stage Decision Picker
- Site data insufficient for selecting scheme→Advise investigations and compare feasible options(Feasibility/preliminary)
- Client selected proposal; interfaces unresolved→Coordinate scheme, criteria and typical calculations(Design I)
- Scheme approved; pricing documents needed→Complete detailed calculations, specifications and drawings(Design II)
- Offers received; award decision pending→Evaluate tenderers and advise client(Tender; written instruction before acceptance)
- Contractor proposes work or seeks certification→Inspect evidence; instruct/certify within appointment(Construction)
- Works handed over; defects remain→Track rectification and final-certification obligations(Post-construction; deliver required operating records)
Six Stages: Consultant Deliverables
- Feasibility/Preliminary
- Investigate constraints; advise options and viability
- Design I
- Develop coordinated scheme and design basis
- Design II
- Detail calculations, drawings, specifications and submissions
- Tender
- Evaluate suitability and offers; advise client
- Construction
- Inspect, instruct and certify within authority
- Post-construction
- Records, defects and final-certification duties
- BEM Form 5.7
- Written client instruction before tender acceptance
- BEM Form 8.7
- Site visits differ from continuous supervision
- BEM Form 2.7
- Engagement normally continues through final-retention certificate
- Stage Boundaries
- Follow appointment and applicable work type
Total and Free Float
Total Float
- Delay without moving project finish
- Equals LS minus ES
- Under stated CPM assumptions
Free Float
- Delay without moving successor’s early start
- Minimum successor ES minus EF
- For zero-lag finish-to-start relationships
Project finish differs from successor start
Project Control & Economy Picker
- Unconstrained CPM activity has zero float→Monitor critical-path completion impact(Multiple critical paths may exist)
- CPI below one→Investigate cost inefficiency(AC exceeds EV)
- SPI below one→Investigate earned-value schedule shortfall(Not days late)
- Comparing mutually exclusive alternatives→Compare NPV on consistent basis(Respect budget and other constraints)
- Alternatives have lifecycle costs→Include operations, replacements and disposal(Common analysis period)
Consultancy Scope and Project Controls
- Fee and Reimbursable Scope
- Agreement plus applicable BEM fee framework
- Written Appointment
- Define scope, responsibilities and fees
- CPM Total Float
- LS − ES; assess network assumptions
- CPM Free Float
- Successor ES − current EF; zero-lag
- CPI
- Earned value ÷ actual cost
- SPI
- Earned value ÷ planned value
- NPV Comparison
- Same horizon, discount basis and constraints
- Claims-Made Insurance
- Check retroactive date and notification terms
Governance, IP and Employment
- Directors: Companies Act 213
- Proper purpose, good faith and diligence
- Conflicted Transaction
- Disclose; follow applicable approval/participation rules
- Company Records
- Document informed decisions and supporting evidence
- BEM Form Copyright
- Consultant retains; client receives project licence
- Reuse on Another Project
- Obtain required written approval and terms
- Infringement Exposure
- Civil remedies; specified offences criminally punishable
- Employment Act Territory
- Peninsular Malaysia and Labuan
- Employment Act Coverage
- Contract-of-service employees; specific benefit exceptions
- Above RM4,000 Wages
- Check occupational exceptions before excluding overtime
- Minimum Employment Terms
- Less-favourable contractual terms cannot displace statute
- Sabah/Sarawak Employment
- Apply respective labour ordinances
Common Traps
Registration and Practising Authority
PE registration ≠ PEPC practising registration
Equity and Professional Control
Corporate share ownership ≠ Qualified director decision control
Paper and Part Pass
One paper passed ≠ Both papers of a part passed
Response Silence and Admission
Deemed dispute of entire claim ≠ Admission of payment liability
Hardship and Frustration
More expensive performance ≠ Supervening impossibility or illegality
Time Relief and Compensation
Extension of completion date ≠ Entitlement to additional payment
Contract Security
Performance bond instrument ≠ Contractual retention money
Separate Appeal Procedures
PCE examination result appeal ≠ Section 19 disciplinary appeal
Licence Scope and File Possession
Possessing a drawing file ≠ Permission for another-project reuse
Completion and Legal Time Limits
Practical completion date ≠ Cause-of-action accrual or statutory knowledge
Last Minute
- 1.Objective: 40 questions; 105 minutes
- 2.Essays: three answers; 120 minutes
- 3.Essay reading: additional 15 minutes
- 4.Both papers need 50% same sitting
- 5.Partial part pass: seven years
- 6.First sitting includes Parts A/B
- 7.Section 7A: no former 70% equity
- 8.Section 7B: 60% professionals; 10% PEPC
- 9.Discipline appeal: 21 days after notification
- 10.Takeover: apply amended Regulation 31
- 11.Coordinator threshold includes SHO-class condition
- 12.Withdrawal: notify; employer fails to act
- 13.CIDB levy applies to total value
- 14.CIPAA suspension notice: 14 calendar days
- 15.PCE appeal: two weeks after results-receipt
- 16.PCE appeal payment: RM400
- 17.Care standard differs from result promise
- 18.Six stages: identify actual consultant deliverables
- 19.Labour rules: jurisdiction and benefit exceptions