2.3 Termination, Letter of Release & Takeover (Reg 31, 2025 Amendment)

Key Takeaways

  • Regulation 31, as substituted from 5 November 2025, separately prohibits supplanting and knowing intervention. Paragraph 31(c) sets the routes for taking over an existing assignment for the same client.

  • Use consent from the first engineer or practice, formal client notification plus the first engineer’s confirmation of fee payment, or BEM approval. Circular No. 008 identifies the Letter of Release and sets out procedural steps.

  • For a fee dispute, the client may request BEM as stakeholder on Form SH. BEM assesses the deposit and issues a Confirmation Letter after receiving it.

  • Circular No. 001 clauses 1.2.2 and 2.2.2 make the incoming PEPC or PE responsible and liable for prior work in the assignment taken over. Review that work and confirm any authority substitution procedure before certifying it.

Last updated: November 2026

Identify the appointment before agreeing to take it over

A new engineer invited to finish someone else’s project must resolve two questions. First, can the engineer take over the appointment under Regulation 31? Second, what evidence supports the work they will become responsible for? An unpaid account, gaps in the existing design record and a pending inspection may all need separate action.

The Registration of Engineers Regulations 1990, as amended by P.U. (A) 403/2025 from 5 November 2025, prohibit supplanting or attempting to supplant another registered engineer or Engineering Consultancy Practice (ECP) and knowingly intervening or attempting to intervene in work already entrusted to them. For taking over an assignment for the same client, paragraph 31(c) specifies three routes.

RouteWhat the incoming practitioner establishes
Regulation 31(c)(i)Obtain the outgoing practitioner’s consent. Circular No. 008 describes this as a Letter of Release (LOR) addressed to the incoming engineer or ECP.
Regulation 31(c)(ii)Obtain the client’s formal notification of termination and the outgoing practitioner’s confirmation that fees have been paid. For a qualifying fee dispute, the client may ask BEM to be stakeholder.
Regulation 31(c)(iii)Obtain BEM approval. If the outgoing practitioner cannot give consent and the fee route cannot be established, ask BEM how to document the circumstances and seek approval.

Circular No. 008 and a disputed bill

BEM’s Circular No. 008 (Rev. 6, 26 June 2026) details the current procedure. The incoming practitioner checks the existing appointment and possible fee dispute with the client and relevant local authority, if applicable, and writes to the outgoing practitioner for release. The circular addresses a properly terminated appointment with no fee claim as well as one with fees claimed. In the no-claim case, the outgoing practitioner is to issue a release within 14 days of request. Where there is a fee claim, the outgoing practitioner is to respond within 14 days. If there is no reply, the incoming practitioner can refer the matter to BEM under paragraph 3.2.

For disputed fees, Form SH asks for the appointment and termination evidence, status of work, and details of unpaid fees. Under paragraph 3.3 and the Form SH conditions, BEM assesses the stakeholder sum and tells the client what to deposit. The client has 30 days from being informed to deposit it. BEM issues its Confirmation Letter after receiving that sum. The form provides for the client to initiate the defined fee-dispute action within 60 days of the letter. Form SH defines the action for the deposit terms as court proceedings or arbitration where agreed. Circular No. 008 separately lists adjudication under the Construction Industry Payment and Adjudication Act 2012 (CIPAA) in paragraph 3.6, which concerns action already commenced by the outgoing practitioner for the paragraph 3.5 exception. Read the rule for the procedure the parties are actually using.

Worked example. An outgoing civil consultancy claims RM480,000 after contractual termination. The client accepts RM220,000 and disputes the remainder. Subtracting the two gives a disputed balance of RM260,000. That arithmetic identifies the amount in dispute on the stated facts. BEM assesses the actual deposit under Form SH. The incoming practice should get the outgoing practitioner’s response, track BEM’s notice and receipt, and obtain the Confirmation Letter before acting on the stakeholder route. Even if the client settles the undisputed RM220,000, that does not establish confirmation of payment of the remaining claimed fees.

Technical responsibility and the authority record

Circular No. 001 clause 1.2.2 applies to a Professional Engineer with Practising Certificate (PEPC) taking over a piece of work. Clause 2.2.2 applies to a Professional Engineer (PE). Each assumes responsibility and liability for the work already done in the assignment taken over. That conduct rule informs the engineering review at handover. A separate claim against the outgoing practitioner still depends on its own facts and legal basis.

Start the engineering handover by listing the packages and revisions the appointment will cover. For a partially built podium, obtain the latest accepted plans, design assumptions, survey control, pile records, inspection results, as-built information and outstanding nonconformities. Match these to what can be inspected on site. Where work is concealed or documentation is missing, identify the additional investigation needed and make any necessary safety arrangements before relying on the affected work. Confirm the applicable local authority and agency procedures for a change of Submitting Person or Principal Submitting Person.

Worked example. A sole-proprietor PEPC dies during commissioning of a hospital upgrade. The incoming engineer first establishes the stage of the works and checks BEM’s current takeover procedure and whether a release is required on the facts. The client and incoming practice document the outgoing appointment and seek BEM guidance or approval where needed. They also contact the relevant authority about how to substitute the submitting professional and check who will verify completed installation and test results.

2025 amendment, regulation 31 · BEM Circular No. 008, paragraphs 2–3 and Form SH · BEM Circular No. 001, clauses 1.2.2 and 2.2.2

Loading diagram...
Regulation 31(c) routes and handover
Test Your Knowledge

After contractual termination, the outgoing ECP disputes the balance and responds that it will not release the assignment. Which sequence completes the Circular No. 008 stakeholder procedure for the incoming ECP?

A

Obtain an indemnity from the client and take over immediately

B

Wait 60 days after the client’s termination notice and treat the release as automatic

C

Have the client submit Form SH, deposit the amount assessed by BEM, and obtain BEM’s Confirmation Letter

D

Ask the local authority to accept the drawings as a substitute for the BEM process

Test Your Knowledge

Ir. Malik, a PEPC, lawfully takes over a partially built development. Under clause 1.2.2 of Circular No. 001, what duty does he assume towards work already done in the assignment he takes over?

A

Ir. Malik assumes all liability and responsibility for the works done prior to his taking over

B

Ir. Malik is strictly exempt from liability for any structural element cast prior to the date on his Letter of Release

C

Liability is automatically split 50/50 between the outgoing consultant and Ir. Malik regardless of fault

D

Liability transfers only if Ir. Malik explicitly agreed in writing to warrant the prior consultant's calculations

Test Your Knowledge
Ordering

For a disputed fee after contractual termination, put the Circular No. 008 stakeholder steps in order.

Arrange the items in the correct order

1

BEM receives the stakeholder sum and issues the Confirmation Letter

2

The client deposits the amount assessed by BEM within 30 days of being informed

3

The client applies for BEM to act as stakeholder on Form SH

4

BEM assesses the stakeholder sum and informs the client

Sections you finish are checked off in the contents.