4.2 Personal Performance, Supervision Control & Multidisciplinary Endorsement

Key Takeaways

  • Under Circular No. 001 clause 1.1.5, a PEPC signs engineering documents only when prepared personally or under their direction and control.

  • Clause 1.1.6 requires each technical segment to be personally signed and stamped by the qualified person involved before the coordinating PEPC signs and stamps the whole project.

  • Clause 1.2.1 requires both control over construction or installation supervision and satisfaction that the design and specifications have been fulfilled.

  • An incoming PEPC assumes responsibility and liability for prior work in the piece of work taken over. Identify the applicable takeover route and verify the engineering evidence before any certification.

  • Circular No. 001 clauses 5.2.1–5.2.4 specify the Inspector of Works’ recordkeeping, signing, reporting and authorisation duties.

Last updated: November 2026

Personal performance and use of specialist support

A client appoints an engineering consultancy and expects the responsible practitioner to perform the agreed services. Identify the arrangement before delegating any work. Clause 2.2 of the BEM Model Form 1999 restricts assignment of the benefit and transfer of obligations without the client's consent. If the parties use an amended form, read their signed wording. A specialist appointment can bring in needed expertise while the original consultant controls its own work and the qualified specialist takes responsibility for their assigned technical segment.

Circular No. 001 clause 1.1.5 allows a Professional Engineer with Practising Certificate (PEPC) to approve and sign engineering documents prepared personally or under the PEPC's direction and control. Examples of evidence of direction and control include the design basis issued to the team, revisions made after professional review, recorded decisions on assumptions and approved check calculations. An engineer receiving completed independent drawings from a contractor and applying a stamp as a favour has not demonstrated either permitted basis.

Coordinate the documents and endorsements

Under clause 1.1.6, signing and stamping a whole project as coordinator requires each technical segment to be personally signed and stamped by the qualified person involved in that segment. A coordinating PEPC can identify interfaces, such as how mechanical loads transfer to the structure, and resolve which designer owns each assumption. Coordination does not supply authority to sign an unrelated segment outside the PEPC's competence or registered branch.

Worked example. The electrical engineer changes the size of a standby generator, which changes both its loads and ventilation requirements. The coordinator tracks the new equipment data to the structural and mechanical designers, checks that the respective documents use the same revision, and obtains the segment endorsements needed for the coordinated submission. Signing a set based on superseded equipment can leave the interface unverified even if every segment has a stamp.

Section 8 of Act 138 governs ordinary engineering submission rights. Select the correct qualified person for the document and check the applicable authority process. The fact that the client retains one lead consultant does not change each discipline's responsibilities.

Completion certification and takeover

Clause 1.2.1 requires the PEPC to have control over the supervision of construction or installation and be satisfied that it fulfils the engineering design and specifications before certifying satisfactory completion of a piece of work. A design appointment alone does not establish that control. Inspect the appointment and actual supervision record, including who witnessed the required events and who could require corrective action. A site inspector's reports can support the assessment. The PEPC must still determine whether the two conditions are met and read the applicable certification rules.

A PEPC who takes over a piece of work assumes responsibility and liability for prior work within the assignment under clause 1.2.2. Apply the current regulation 31 takeover routes before accepting the replacement. Assess what completed work can be verified and what uncertainty remains. For concealed risers, locate the approved installation details, as-built revisions and witnessed test records. Decide which additional verification is justified. The code does not prescribe the same form of intrusive testing for every takeover.

Independent checks and evidence from site

Section 10B of Act 138 sets out registration for an Accredited Checker (AC) and reserves prescribed AC functions to someone so registered. BEM publishes guidance for geotechnical and structural checking and states that ACs must use its new AC stamp from 6 June 2023. The checker’s endorsement concerns the independent checking performed. Verify whether a check is required for the specific project and applicable local law. Keep the checker's role distinct from the original designer's responsibility and the overall submission.

Site inspection issueInspector of Works (IOW) action under Circular No. 001
TraceabilityUnder clause 5.2.1, keep proper records of participation, inspection and witnessing, including the date, time and relevant site conditions.
Signing an observationClause 5.2.2 requires the accuracy check and witnessing or inspection of the work before signing its documentation.
Work outside the specificationUnder clause 5.2.3, bring it to the engineer or employer's attention at the earliest possible opportunity.
Directions to the contractorUnder clause 5.2.4, issue instructions or verify or approve the contractor's work only when authorised by the engineer or employer.

If the required observation was missed because it happened before the scheduled inspection, make a factual entry and raise it to the supervising engineer. The record can distinguish batch paperwork from what was actually inspected and identify the next verification step. Before signing the completion certificate, the responsible PEPC uses the records to test the supervision and conformance conditions applicable to that item. If the record cannot support a proposed endorsement, identify the gap so the parties can address it.

BEM Circular No. 001, clauses 1.1.4–1.1.6, 1.2.1–1.2.2 and 5.2.1–5.2.4 · Act 138, sections 8 and 10B · BEM registration and AC stamp guidance · BEM Model Form 1999, clause 2.2

Test Your Knowledge

A mechanical PEPC is appointed under Regulation 31 RER 1990 to take over an unfinished hospital HVAC installation after the previous consultant resigned mid-construction. Chilled-water risers are already concealed inside drywall shafts. Under BEM Circular No. 001 cl.1.2.2, what is the incoming PEPC's liability position?

A

The incoming PEPC assumes responsibility and liability for the prior work in the assignment taken over and must evaluate whether the evidence supports certification

B

The incoming PEPC is liable only for ductwork and equipment installed after the formal takeover date

C

All prior-stage liability permanently remains with the outgoing PEPC provided a Letter of Release was issued

D

Liability is automatically transferred to the main M&E contractor once the takeover letter is filed with BEM

Test Your Knowledge

For a building design that requires a separate Accredited Checker under the applicable rules, which action reflects BEM’s current registration and stamp guidance?

A

The Submitting Engineer may simultaneously act as the Accredited Checker for the same building provided a second PEPC within the same firm co-signs

B

An Accredited Checker uses the ordinary PEPC stamp with a handwritten 'AC' notation next to the signature

C

Accredited Checkers are appointed only after Form F (CCC) is issued to audit maintenance compliance

D

Effective 6 June 2023, an Accredited Checker must use a separate standardized BEM AC stamp to signify independent structural or geotechnical verification

Test Your Knowledge
Fill in the Blank

Under BEM Circular No. 001 clause 1.2.1, a PEPC may certify satisfactory completion only when the PEPC has control over ___ of construction or installation and is satisfied that the design and specifications are fulfilled.

Type your answer below

Sections you finish are checked off in the contents.