4.3 Submitting Persons and Occupancy Certification

Key Takeaways

  • Under sections 70(20)–(21) of Act 133, the Principal Submitting Person issues the Certificate of Completion and Compliance after fulfilling the statutory supervision, conformity and safety duties.

  • A Submitting Person certifies their own scope. Signing a stage certificate as SP does not confer authority to issue the whole-building certificate.

  • Where Sabah’s Uniform Building By-Laws 2022 apply, by-laws 216–218 use Form E for CCC, Form E1 for partial CCC and F1–F22 for supporting certifications. Check prior approvals and the local authority’s records for projects using older occupation certificate procedures.

  • Under the Sarawak Buildings Ordinance 1994 Fourth Schedule, qualified persons certify their own work and the local authority issues an Occupation Permit after the applicable checks.

Last updated: November 2026

Identify the legal instrument and the responsible person

At project completion, a client may have evidence from many people. The signatory who certifies a foundation stage is not necessarily the person authorised to issue the occupation document. Establish the project location, the date and approval history, the applicable legislation, and the roles of each signatory before applying a form number.

In the Street, Drainage and Building Act 1974 (Act 133) framework, the Principal Submitting Person (PSP) is the qualified person responsible for the main building submission or a qualifying successor. A Submitting Person (SP) is a qualified person who submits plans other than building plans and can include a qualifying successor. A registered architect, engineering professional with the requisite practising authority, or registered building draughtsman may act within the scope allowed by their governing law and the applicable building rules. The role comes from the submission and the authority to undertake it. A specialist engineer engaged as SP for specific systems remains responsible for that scope.

RegimeOccupation or completion instrumentIssuer and supporting route
Selangor example under Act 133 and the applicable Uniform Building By-LawsCertificate of Completion and Compliance (CCC), Form F. Form F1 is the partial certificate under by-law 27.The PSP issues the certificate after meeting the applicable conditions, including relevant stage certifications and provision of essential services.
Earlier council certification in parts of Peninsular Malaysia where the older requirements still governCertificate of Fitness for Occupation (CFO)The local authority issued the CFO under the older approval framework. Check the provisions and approval record applicable to the existing building.
Sabah where its Uniform Building By-Laws 2022 applyForm E CCC, Form E1 partial CCCThe PSP issues the certificate. By-laws 216 and 217 use supporting forms F1–F22, and by-law 218 requires the deposit. Sabah authorities also refer to Occupation Certificates (OC). Check the local approval and savings provisions before applying the older process or the current forms.
Sarawak under the Buildings Ordinance 1994 (Cap. 8) Fourth ScheduleOccupation Permit (OP) in Schedule B Form G. Form H is for temporary occupation and Form I for partial occupation.The qualified persons submit the prescribed certification for their portions. Under by-law 21 the local authority or its authorised officer inspects, and the local authority issues the permit once the conditions are fulfilled.

Act 133 supervision and responsibility

Under section 70(20), only the PSP issues the CCC in the prescribed manner. Section 70(21) requires supervision to ensure conformity with approved plans and the statutory requirements, completion in conformity with those requirements and authority conditions, and a building safe and fit for occupation. By-law 25 of the Selangor Uniform Building By-Laws 1986 adds the statutory workflow for Form F including receipt of the stage certifications and provision of essential services. Match the issued certificate to the approved scope.

The local authority retains its control powers. Under section 70(23), it can issue a written notice requiring rectification and a written directive withholding the CCC until the noncompliance is rectified. A scheduling decision by the client cannot substitute for resolving the notice. The PSP should establish the written position and obtain verifiable evidence that the outstanding condition has been addressed before issuing the certificate.

Section 70(27) covers specified offences. They include knowingly issuing a false or fraudulent stage certification, issuing a CCC without the relevant prescribed forms, and occupying or allowing occupation without the required CCC. On conviction the section provides up to RM250,000, up to ten years’ imprisonment, or both. These are the Act 133 figures for the specified offences. The applicable conduct rules and any civil claim depend on their own elements.

Worked scenario. A phased handover

A developer in Selangor wants to open an office wing while the next wing remains under construction. The engineer responsible only for ventilation can certify the verified ventilation scope if the requirements for that stage are met. The PSP still has to determine whether the completed wing satisfies the applicable partial certification requirements. Check the area delineated, whether utilities and protective systems serving it are available, and applicable authority conditions. Document the outstanding work for the remaining wing. A Sarawak project would instead require the relevant local authority’s partial Occupation Permit under the Fourth Schedule, where applicable.

If the owner points to an old file labelled CFO, OC or OP, identify the original authorisation, location and current use. An existing approval record is evidence of the particular route, and any change to use or works may require a separate current approval. The stage certification section applies this distinction to the Selangor forms.

Act 133, sections 3 and 70 · Selangor Uniform Building By-Laws, by-laws 25 and 27 · Sabah Uniform Building By-Laws, by-laws 216–220 and 236 · Kota Kinabalu Building Control Department · Sarawak Buildings Ordinance, Fourth Schedule, by-laws 21–24

Test Your Knowledge

A mechanical PEPC is only the Submitting Person for ventilation on a new Selangor project. Who can issue the Form F Certificate of Completion and Compliance after all statutory conditions are met?

A

The ventilation SP because their system passed testing

B

The project’s qualified Principal Submitting Person

C

Any contractor who signed a stage certificate

D

The purchaser of the building

Test Your Knowledge
Matching

Match the legal setting and the full-building occupancy document used for that setting.

Match each item on the left with the correct item on the right

1

Selangor project under the current CCC route

2

Sabah project governed by the 2022 Uniform Building By-Laws

3

Sarawak project under the Buildings Ordinance Fourth Schedule

Test Your Knowledge

An applicable Act 133 project is occupied without a required CCC. What is the maximum punishment stated in section 70(27) on conviction for that offence?

A

RM250,000, up to ten years’ imprisonment, or both

B

RM10,000 only

C

RM50,000, up to three years’ imprisonment, or both

D

Cancellation of registration is the only possible order