13.8 Time-Critical Nontraumatic & Pregnancy Emergencies
Key Takeaways
Choose the examination that answers the most urgent plausible diagnosis. An acute coronary, aortic, pulmonary vascular or oesophageal question needs a different workflow.
In a suspected perforation or postoperative leak, describe direct and indirect evidence and communicate urgent concern even if the defect is not visible.
A pregnancy of unknown location needs a planned clinical and imaging pathway. No single hCG level locates the pregnancy.
In major trauma during pregnancy, assess and stabilise the mother promptly. Do not withhold clinically necessary imaging or exclude abruption on a negative ultrasound alone.
Match Acute Chest Pain to the Urgent Question
Assess physiology and immediate clinical tests before choosing a scan. Electrocardiography and the acute coronary syndrome pathway take priority when infarction is suspected. An indication for coronary CTA in a selected stable patient does not make it the default test for unstable acute coronary disease. If the presentation suggests an acute aortic syndrome, use the aortic pathway and cover the root, arch and distal aorta as indicated. If pulmonary embolism is the main question after probability assessment, time the pulmonary arterial acquisition to answer that question. A single routine portal-venous examination or an unmodified protocol from another indication can miss the target finding. A combined acquisition can be considered only when justified by the differential and technically supported. AHA/ACC acute chest-pain guideline and ESC aortic guideline.
After forceful vomiting, severe chest pain with mediastinal air and a new pleural effusion can indicate oesophageal perforation. A little mediastinal air is nonspecific. Look for gas or fluid adjacent to the oesophagus, wall abnormality, mediastinal inflammation or collection and any direct extraluminal contrast. Contrast-enhanced CT with CT oesophagography where appropriate can evaluate the source and extent. Coordinate oral contrast and airway safety with the team. A pleural collection can be a clue to thoracic contamination. Contact the responsible emergency or surgical team promptly if concern persists even without a visible wall defect. WSES oesophageal emergencies guidance.
Look for the Actionable Finding in an Acute Abdomen
| Clinical question | What imaging needs to resolve |
|---|---|
| Sudden pain with concern for acute mesenteric ischaemia | Urgent CTA assesses arterial and venous supply and bowel enhancement. The absence of pneumatosis does not exclude earlier ischaemia. Communicate arterial occlusion, poor enhancement and other signs of threatened bowel. |
| Sepsis or pain after bowel surgery | Review operative site and timing. A new or enlarging perianastomotic gas and fluid collection is concerning; visible extraluminal contrast from the anastomosis is more specific. If indicated and safe, tailor water-soluble enteric contrast to the surgical site. Failure of contrast to reach the join limits the test. |
| Fever and an obstructed kidney | Localise the obstruction and assess adjacent findings. A clinically infected obstructed system needs urgent decompression. Absence of definite pus on imaging does not remove the risk. |
| Unexplained progressive abdominal deterioration after a nondiagnostic scan | Reassess procedure, contrast phase, anatomy and vital course, communicate the residual concern, and discuss whether targeted imaging or immediate exploration is needed. |
For a stable patient with a suspected colorectal anastomotic leak, a collection near the join on CT and contrast demonstrably escaping from the bowel are different levels of evidence. Describe the exact site and extent, drainage options if relevant and limitations. Never let a technically negative study override increasing clinical concern. WSES acute mesenteric ischaemia guidance, original rectal contrast study, EAU urolithiasis guideline.
Adapt the Immediate Pathway in Pregnancy
With early pregnancy pain or bleeding, use transvaginal ultrasound as appropriate and assess the uterus, adnexa and free fluid. A single serum human chorionic gonadotropin result cannot locate pregnancy. In a stable patient with no probable or definite pregnancy at either site, arrange follow-up as a pregnancy of unknown location, with clinical safety advice and repeat testing through the early-pregnancy team. Deterioration or concern for haemoperitoneum takes priority over scheduled follow-up. In suspected adnexal torsion, an oedematous enlarged ovary or twisted pedicle can justify urgent review even when Doppler detects arterial flow. Interpret clinical and imaging findings together.
In pregnant trauma, maternal resuscitation and detection of maternal injuries take priority, with early obstetric involvement. Use ultrasound for appropriate questions such as pregnancy and fetal assessment, but a negative study does not reliably exclude abruption or serious maternal injury. Perform indicated CT when it is needed to answer an urgent maternal question. Tailor coverage to the indication, coordinate contrast decisions and avoid unnecessary phases or duplicate acquisitions. Imaging complements obstetric assessment and fetal monitoring where indicated. NICE early-pregnancy guideline, ESER acute pelvic pain recommendations and CETARS/CAR pregnant trauma guideline.
For a pregnant patient with suspected appendicitis, ultrasound or noncontrast MRI can be appropriate. If the first test is nondiagnostic, arrange the next examination according to clinical urgency and availability. A poorly visualised appendix does not establish a normal examination. Imaging decisions should account for the risk of delaying diagnosis as well as exposure. ACR right lower quadrant pain guidance.
Recognise Emergency Handover Triggers Outside the Torso
- Sudden focal deficit: activate the stroke pathway. Prompt brain imaging assesses haemorrhage, and vascular imaging can identify an occlusion for the reperfusion team. Do not wait for a visible infarct on unenhanced CT before alerting the team.
- Suspected metastatic cord compression with new neurological symptoms: arrange urgent specialist assessment and whole-spine MRI under the pathway. Imaging may show more than one level. NICE specifies imaging as soon as possible and always within 24 hours of suspected metastatic cord compression.
- Suspected complicated orbital or deep neck infection: report extension, drainable collections, vascular or intracranial complications and any airway threat. Severe airway compromise needs urgent clinical action.
- Suspected acute limb compartment syndrome: clinical assessment and timely decompression take priority. Imaging does not provide a safe exclusion pathway.
National Clinical Guideline for Stroke acute care, NICE metastatic cord compression, ESR head and neck infection guidance and BOAST compartment guidance.
A stable adult develops severe chest pain after repeated vomiting. Initial imaging shows new peri-oesophageal gas and a pleural effusion. What is the best next imaging consideration if oesophageal perforation is suspected?
Treat the gas as incidental without further assessment.
Use contrast-enhanced CT with CT oesophagography as appropriate, and communicate concern urgently.
Use a routine unenhanced brain scan to exclude mediastinal complications.
Wait for the effusion to resolve before evaluating its source.
A clinically stable patient with early pregnancy pain has a positive pregnancy test. Transvaginal ultrasound shows neither a probable nor definite intrauterine or ectopic pregnancy. What is the appropriate assessment?
An ectopic location is established by the serum hCG level alone.
An intrauterine pregnancy is established because there is no visible adnexal mass.
Pregnancy of unknown location, with structured follow-up and reassessment if symptoms change.
No follow-up is required after a single empty ultrasound.
A pregnant patient has major blunt trauma and an urgent suspected maternal internal injury. An initial targeted ultrasound is nondiagnostic. Which principle applies?
Proceed with clinically indicated imaging to answer the urgent maternal question and involve the obstetric team.
Withhold all CT until after delivery regardless of the maternal findings.
A negative ultrasound excludes placental abruption and all maternal internal injury.
Replace clinical observation and obstetric monitoring with one normal scan.
Sections you finish are checked off in the contents.