14.2 Preheat, PWHT, WPS & Welder Qualification
Key Takeaways
Preheat brings the weld zone to the required minimum before welding. For susceptible steels, controlling cooling and allowing hydrogen diffusion reduces hydrogen-assisted cracking risk.
Check the interpass temperature before the next pass. PWHT is a controlled cycle after welding that can reduce residual stress or temper hard regions, depending on material and procedure.
The WPS specifies how to weld. A PQR records procedure qualification variables and results. A separate performance qualification records what a welder or welding operator may do.
Fitter and welder duties follow the quality plan. Verify fit-up, cleanliness, material identity, thermal controls and qualifications before work proceeds.
Keep the specified material, weld and examination records. A heat number connects material to mill records. A welder identifier connects the weld to the person whose qualification must be verified.
Preheat, PWHT, WPS & Welder Qualification
Quick Answer: Verify preheat before welding and interpass temperature before the next pass. Apply PWHT after welding when required. Read the WPS for the production instructions and verify procedure and welder qualifications separately. Keep the material, welder and heat-treatment records required by the job.
Section 14.1 defined joint types and symbols. This section answers how a joint becomes a qualified, documentable pressure boundary: thermal control, procedure vs performance qualification, craft roles, and traceability. It deepens Module 08303 (codes/WPS awareness) and Fabrication welding literacy without replacing process/NDE details covered in Chapter 6.
Why thermal control is a joint-quality issue
Steel near a weld experiences rapid heating and cooling. On carbon and low-alloy steels—especially thicker walls, higher carbon equivalents, restrained spools, and moisture-contaminated prep—uncontrolled cooling can produce:
- Hard, brittle heat-affected zones (HAZ) prone to cracking
- Hydrogen-assisted cracking (cold cracking) when diffusible hydrogen, susceptible microstructure, and stress combine
- High residual stress locked into clamped, thick, or highly restrained joints
Preheat, interpass control, and—when required—PWHT are engineering responses written into the WPS and governing code. Craft workers do not invent temperatures; they achieve and verify them.
Preheat — purpose and craft practice
Preheat means bringing the base metal in the weld zone to a specified minimum temperature before welding starts (and often maintaining that minimum while welding).
| Preheat purpose | Craft meaning |
|---|---|
| Hydrogen control | Preheat can allow more diffusible hydrogen to escape during cooling. Clean, dry surfaces and suitable consumable handling limit hydrogen entering the weld. |
| Hardness and cooling rate | Controlled cooling can reduce the formation of hard, crack-sensitive microstructures in susceptible steels. |
| Code/WPS compliance | Many procedures set preheat from material, thickness, and chemistry—not from outdoor air temperature alone |
Temperature verification: ASME B31.3-2024 §330 specifies preheat requirements, verification and the zone to heat. Use an approved indicator or instrument at the specified locations. Select the heating method from the procedure. Depending on the joint, it may use approved manual heating, induction or electric resistance.
Common failures:
- Skipping preheat because “the sun is out” or the metal “doesn’t feel cold”
- Heating only a tiny spot at the bevel while the rest of the joint is below minimum
- Starting a tack or root before the required preheat is verified in the code- and procedure-defined zone
- Using oxidizing, sooty flames that contaminate stainless or leave carbon deposits on critical prep
Key Point: Ambient air temperature ≠ preheat temperature. A 70°F shop can still require 200°F (or another WPS value) on thick alloy or carbon steel.
Interpass temperature
Interpass temperature is the temperature at the specified location before the next pass is deposited.
| Limit type | Why it exists |
|---|---|
| Minimum interpass | Keep the joint from cooling below the qualified floor between passes (related to preheat logic) |
| Maximum interpass | Prevent overheating that can degrade toughness, corrosion resistance, or microstructure—critical on many stainless, nonferrous, and some low-alloy procedures |
Multi-pass pipe welds may need a pause to cool under a max limit, or continued heating to hold a min limit. The WPS states the envelope; the welder and fitter team measures and waits or reheats as required. Depositing “stringer after stringer” without checking max interpass is a procedure violation even if the bead looks fine.
PWHT — post-weld heat treatment
PWHT is a controlled thermal cycle after welding is complete (or after a defined stage): heat at a controlled rate, hold at a specified temperature for a time often based on thickness, then cool per procedure—frequently under insulation with recorded charts.
| PWHT purpose | Notes |
|---|---|
| Residual stress relief | Can lower and redistribute residual stresses from welding |
| Temper hard HAZ | Can temper hard microstructures in susceptible materials. The effect on properties depends on material and cycle. |
| Code/service requirement | B31.3-2024 §331 and the applicable design and WPS govern the cycle or any permitted exemption or alternative |
Preheat ≠ PWHT:
| Control | When | Goal |
|---|---|---|
| Preheat / interpass | Before and during welding | Control cooling, hydrogen, hardness during fabrication |
| PWHT | After welding (controlled cycle) | Stress relief, tempering, code-required properties |
Pipefitters may install blinds, support the spool, attach thermocouples as directed, wrap insulation, and protect adjacent equipment—but cycle parameters come from engineering, the WPS, and heat-treat procedures. Do not “give it a little heat with a torch after welding” and call it PWHT.
When is PWHT required? Use the governing code, material grouping, controlling thickness, engineering design and approved WPS. Under B31.3-2024 §331.1.3, control thickness depends on the weld and joined components. Use the approved heat-treatment instructions and any required time-temperature records for release.
WPS vs PQR (procedure qualification)
Under ASME BPVC Section IX, QW-200 describes the WPS and PQR. B31.3-2024 §328.2.1 also allows specified standard procedures adopted under the applicable Section IX Article V conditions.
| Document | Full name idea | Role |
|---|---|---|
| WPS | Welding Procedure Specification | Production instructions: process, base metals, fillers, joint design, positions, electrical ranges, preheat/interpass, PWHT, technique limits as qualified |
| PQR | Procedure Qualification Record | Certified record of applicable actual coupon variables and qualification test results. One or more PQRs may support a WPS. |
Rules of thumb for the field:
- You weld production joints to the WPS, not by rewriting the PQR on the deck.
- A change beyond the qualified essential or applicable supplementary essential variables requires qualification support under QW-200.1 before use. An authorized change to a nonessential variable still has to be documented in the WPS.
- Keep the current WPS available for production. Keep the supporting procedure and personnel qualification records available for review as required by §328.2.4.
- Fit-up that violates joint design on the WPS (gap, land, backing) is as wrong as using the wrong electrode.
Exam Tip: If a question asks which document the welder follows day-to-day, choose the WPS. If it asks what records the procedure qualification test variables and results, choose the PQR.
Welder performance qualification (ASME IX awareness)
The procedure qualification establishes the supported welding parameters. Welder performance qualification demonstrates the welder’s ability within recorded limits. Check the process and the applicable performance variables, such as backing, pipe diameter, deposited weld thickness or position. These limits are separate from the WPS ranges. ASME’s QW-484A form shows examples of performance ranges.
Awareness points for pipefitters:
- A welder may be qualified for SMAW 6G on certain thicknesses while GTAW roots require their own applicable qualification. Check the performance record for the processes and ranges.
- Section IX QW-322 governs continuity, expiration and revocation for the process. Verify continuity before assignment and use the applicable renewal or requalification provision when needed.
- For B31.3-2024 work, §328.5.1(c) requires qualified welders or welding operators for tack welds, including bridge tacks that will be removed.
- Pipefitters who are not qualified welders must not deposit production weld metal “to help” unless they hold the required qualification and authorization.
| Concept | Answers the question |
|---|---|
| WPS/PQR | Is this way of welding qualified? |
| Welder performance qual | Is this welder qualified to use that way in this position/process range? |
Both are required in a normal code-quality program: a qualified welder following an unqualified procedure—or an unqualified person following a perfect WPS—still fails the system.
Pipefitter vs welder responsibilities on a joint
Industrial work is a team quality system. Clear roles prevent finger-pointing after NDE rejects.
| Responsibility | Typical pipefitter ownership | Typical welder ownership |
|---|---|---|
| Material identity | Correct pipe/fitting, heat numbers, MTRs as required | Confirm base metal matches WPS before striking arc |
| Cut length & layout | Center-to-center, takeouts, square cuts | — |
| Bevel, land, root face | Prep to WPS/drawing | Verify prep acceptable before welding |
| Root gap, alignment, hi-lo | Fit-up with clamps/spacers | Accept or reject fit-up; do not “burn in” out-of-tolerance joints |
| Cleanliness | Remove oil, paint, slag, moisture from weld zone | Maintain cleanliness between passes |
| Tack plan | Support and verify geometry | Qualified personnel place tacks to the approved procedure |
| Preheat / interpass | Help heat, insulate, measure as directed | Maintain thermal limits while welding |
| Weld deposition | Not by unqualified fitters | Root, fill, cap per WPS |
| PWHT support | Spool handling, insulation, protection | Coordinate with heat-treat crew; no freestyle torch “PWHT” |
| Documentation | Heat numbers on spools, traveler sign-offs | Welder stamp/ID on weld map as required |
Key Point: Observe the job’s fit-up inspection point. If the joint falls outside the WPS or design, correct it or obtain an approved disposition before welding.
Documentation and heat numbers
Traceability links physical metal to test reports and the installed location.
Heat number: A mill identifier for a heat of material. The applicable specification and purchase requirements govern marking and transfer. QA programs often require:
- Heat number visible on the piece (or transferred mark when cut)
- Matching Material Test Report (MTR) on file
- Mapping heats to spool numbers, weld numbers, and isometric line numbers on travelers or as-built records
If identity is lost: Hold the piece for the approved material-control disposition. PMI can help verify alloy chemistry within the limits of the method. A heat-specific record needs evidence that connects that individual piece to its documented heat.
Other documents on a welded joint package may include:
- Issued WPS number used
- Welder ID applied or documented as permitted under §328.5.1(b) and project rules
- Fit-up and VT sign-offs
- NDE reports (RT, UT, PT, MT)
- PWHT charts with time-temperature records when PWHT applies
- Hydro/pneumatic test records after the system is complete
Scenario: thick chrome-moly butt weld
A chrome-moly pipe butt weld uses material in P-No. 5A and a GTAW/SMAW WPS. The job requires preheat, interpass limits and PWHT. Verify these items in order:
- Confirm materials and heat numbers against MTRs and the traveler.
- Prep bevel/land/gap; fit alignment and hi-lo; clean thoroughly.
- Check the applicable welder qualification record and continuity for each process. Record the welder identifier as specified.
- Verify preheat before tacking or welding and check interpass temperature before the next pass.
- Weld to the WPS and keep the required in-process inspection stages accessible.
- Support the spool for PWHT; run the cycle to procedure with recorded charts—not torch guessing.
- Complete the prescribed examination after heat treatment for this P-No. 5A material under §341.3.1(a). Complete the applicable leak test and file the required documents.
Skipping preheat to “save an hour” or welding with an unqualified helper on the cap can scrap a high-value alloy joint and fail audit even if radiography has not run yet.
Common exam traps
- Calling PWHT the same as preheat.
- Saying the PQR is what the welder follows on every production pass (they follow the WPS).
- Believing any warm metal satisfies preheat without measurement.
- Treating welder qualification as optional if the WPS is on the wall.
- Assuming fitters may deposit production weld metal without performance qualification.
- Ignoring heat numbers because the OD stencil “looked like carbon steel.”
Putting Section 14.2 and Chapter 14 together
| Chapter 14 focus | Outcome |
|---|---|
| 14.1 Joint types & symbols | Right joint family, right prep, right side, shop vs field |
| 14.2 Heat, WPS/PQR, quals, roles, docs | Right thermal control, right procedure, right person, right paperwork |
Joint quality is not only a nice bead. It is geometry + heat + qualified process + qualified people + traceable materials. Master that system and you support first-time NDE pass rates, code compliance, and safe pressure boundaries—exactly what journey-level industrial pipefitting demands when drawings, WPS sheets, and inspectors meet at the same joint.
What is the primary distinction between preheat and post-weld heat treatment (PWHT)?
Preheat is only for stainless; PWHT is only for copper tube
Preheat and PWHT are identical terms for the same torch technique after the cap pass
Preheat establishes the initial weld-zone temperature. PWHT is a controlled cycle applied after welding when required.
PWHT replaces the need for any WPS or welder qualification
What does ASME Section IX use a Procedure Qualification Record (PQR) to document?
It is the daily production checklist the welder marks after each pass in place of a WPS
It records the qualification test weld and results that support a Welding Procedure Specification (WPS)
It is only a shipping document for empty electrode cans
It authorizes any fitter to weld without performance qualification
On a code-quality butt weld, which task is primarily a pipefitter responsibility rather than weld deposition by the welder?
Fit the joint to the specified root opening, alignment and internal offset limits before welding.
Selecting a random electrode not listed on the WPS because it runs hotter
Certifying a welder’s performance qualification on the strength of a fit-up check
Running the final cap pass without holding any qualification
Why do quality programs track heat numbers on pipe and fittings used in welded systems?
Heat numbers only decorate the pipe and have no QA purpose
Heat numbers replace the need for isometric drawings
Heat numbers set the fillet weld leg size on socket joints automatically
Heat numbers link installed material to MTRs and location records for traceability