Cheat sheet

NCCER Pipefitter Cheat Sheet

Quick Facts

Assessment
Industrial Pipefitter PFT08_03
Level
Journey-level knowledge assessment
Written items
125
Time and format
3 hours, closed book
Minimum passing score
75
Allowed reference
The Pipefitters Blue Book
Allowed calculator
Non-programmable, non-printing
Calculator types
Basic, scientific, or pipe-specific
Other study materials
No extra notes or books
Full craft certification
Knowledge assessment + performance verification
Curriculum
Pipefitting, 4th edition
Blueprint revision
November 2024

Hydrostatic vs Pneumatic

Hydrostatic

  • Liquid test medium
  • Vent trapped air during fill

Pneumatic

  • Gas test medium
  • Higher stored energy risk

Test to the approved plan

Safety Checks

  1. Portable ladder has damaged rung→Withdraw it from service
  2. Shift starts on scaffold→Competent person inspects
  3. Excavation exposed to rain→Competent person reinspects
  4. Approved hydro test filling→Vent trapped air(At high points)
  5. Liquid medium unsuitable→Use approved test plan(Pneumatic needs added controls)

Access and Excavations

Typical leaning ladder
Base setback ≈ ¼ working length
Damaged portable ladder
Mark and withdraw from service
Scaffold inspection
Competent person before each shift
Before excavating
Determine estimated utility locations
Trench after rainstorm
Competent person reinspects
Shoring
Supports excavation walls
Shielding
Protects workers within shield
Sloping
Cuts trench walls back

Pressure Test Setup

Test boundary
Defines isolated test segment
Hydrostatic test
Uses liquid, usually water
Pneumatic test
Uses compressed gas
High-point vent during hydro fill
Releases trapped air
Test pressure and duration
Use governing code and approved plan
Test gauge
Check calibration and range

Set, Roll, Then Travel

Square both shifts, root, then divide by sine.

Set = vertical shiftRoll = sideways shiftRoot gives true offset

Offset Calculator

  1. Offset stays in one plane→Use perpendicular offset directly
  2. Line shifts vertically and sideways→√(set² + roll²)(Find true offset first)
  3. Given travel angle and offset→Offset ÷ sin θ(Use true offset)
  4. Need run along original axis→Offset ÷ tan θ(Use true offset)
  5. Equal 45° offset fittings→True offset × 1.414(Center-to-center travel)

Offset Geometry

True rolling offset
√(set² + roll²)
Center-to-center travel
True offset ÷ sin θ
Run along original axis
True offset ÷ tan θ
22.5° travel multiplier
≈ 2.613 × true offset
30° travel multiplier
2 × true offset
45° travel multiplier
≈ 1.414 × true offset
60° travel multiplier
≈ 1.155 × true offset
Set 6″, roll 8″
True offset = 10 in
10 in offset at 45°
Travel ≈ 14.14 in

Layout Formulas

Offset angle θ
Between travel and original run
Rise or fall
Horizontal run × slope ratio
Pipe outside circumference
π × outside diameter
Inside diameter (ID)
OD − 2 × wall thickness
Degrees on calculator
Use degree mode

NPS vs Schedule

NPS

  • Nominal size designation
  • Look up actual OD

Schedule

  • Wall-thickness series
  • Look up wall by NPS

Specify both size and schedule

Hand and Power Tools

Pipe wrench
Turns round threaded pipe
Strap wrench
Grips polished pipe without teeth
Pipe vise
Holds pipe during fabrication
Reamer
Removes internal cut burr
Threading die
Cuts external pipe threads
Pipe stand
Supports stock during fabrication

Pipe Dimensions and Standards

NPS
Nominal Pipe Size
Pipe schedule
Wall-thickness series by size
OD
Measured outside diameter
Same NPS, thicker wall
Smaller inside bore
ASME B31.3
Process piping code
WPS
Welding procedure specification

Oxyfuel Cutting

Preheat flame
Raises steel to ignition temperature
Cutting oxygen
Oxidizes steel and ejects slag
Ordinary oxyfuel cutting
Suitable for carbon steel
Regulator
Controls gas delivery pressure
Kerf
Width of material removed
Oxygen equipment
Keep free of oil and grease

Field Routing

Field cut
Verify actual tie-in dimensions
Routing check
Confirm clearances and support locations
Vessel trim
Piping and fittings at vessel
Prepared weld bevel
Check approved joint detail

Butt Weld vs Socket Weld

Butt weld

  • Opposing ends align
  • Check specified root opening

Socket weld

  • Pipe enters socket
  • Check specified back-off gap

Follow the approved joint detail

Fit-Up Decisions

  1. Given center distance between fittings→Subtract both center-to-face dimensions
  2. Given clear faces, butt welds→Subtract both specified root gaps
  3. Given clear faces, threaded joints→Add both specified thread engagements
  4. Socket weld fit-up→Check insertion and specified gap
  5. Bevel angle or root gap→Check approved weld procedure(Use applicable joint detail)

Joint Types

Butt weld
Joins aligned pipe ends
Socket weld
Pipe inserts into fitting recess
Socket weld fillet
Around socket mouth
Socket weld fit-up
Leave specified insertion gap
NPT
Tapered American pipe thread
Thread engagement
Length inserted into threaded fitting
Thread sealant
Match fluid and service conditions

Takeouts and Fit-Up

Center-to-face dimension
Fitting centerline to end face
Clear face-to-face gap
Center distance − both center-to-face dimensions
Butt-weld cut length
Face distance minus both root gaps
Threaded cut length
Face distance plus both engagements
Takeout lookup
Use exact fitting dimensions
Hi-lo
Internal offset at joint
Miter turn
Angled cuts form the bend
Saddle layout
Template matches intersecting pipe contour

Line, Legend, Dimensions

Trace the line, read the legend, trust dimensions.

Line number keeps continuityLegend decodes symbolsWritten dimensions govern

P&ID vs Isometric

P&ID

  • Process connections and flow
  • Instrument tags and signals

Isometric

  • Spatial pipe routing
  • Fabrication dimensions and elevations

Trace flows on the P&ID

Drawing Picker

  1. Trace process flow and controls→P&ID
  2. Locate equipment in plant→General arrangement
  3. Find elevations and offsets→Piping isometric
  4. Fabricate one numbered assembly→Spool drawing
  5. Count fittings for spool→Bill of materials

Pipe Drawings

P&ID
Piping and instrumentation diagram
Instrument signal line
Shows control or measurement connection
General arrangement
Shows equipment placement and routing
Piping isometric
Shows spatial routing and dimensions
Spool drawing
Details one fabricated pipe assembly
Bill of materials
Lists components and quantities
Elevation
Height relative to project datum
Continuation reference
Follow line onto another sheet

Vertical vs Basket Hitch

Vertical

  • Single straight sling leg
  • Use vertical hitch rating

Basket

  • Both sling ends support load
  • Use rated basket configuration

Read hitch and angle rating

Lift Checks

  1. Sling identification missing→Remove equipment from service
  2. Sling angle becomes flatter→Recheck rated configuration
  3. Sharp edge contacts sling→Use suitable edge protection
  4. Emergency stop signal received→Stop the lift

Hitches and Sling Loads

Vertical hitch
Single straight sling connection
Basket hitch
Sling cradles load from underneath
Choker hitch
Sling cinches around load
Flatter sling angle
Higher leg tension, same load
Sling tag
Check rated configurations
Defective rigging
Remove from service
Sling over sharp edge
Protect sling from edge damage
Emergency stop
Obey regardless of signaler

Isolate, Regulate, Check

Gate isolates, globe regulates, check blocks backflow.

Gate: isolationGlobe: throttleCheck: one-way duty

Gate vs Globe

Gate

  • Typical isolation duty
  • Normally fully open or shut

Globe

  • Typical regulating duty
  • Suitable trim for throttling

Choose by duty and service

Valve and Support Picker

  1. Typical line isolation needed→Gate valve(Check service specification)
  2. Typical throttling needed→Globe valve(Check service specification)
  3. Backflow prevention needed→Check valve(Verify flow arrow)
  4. Automatic overpressure protection needed→Specified relief device
  5. Limit sideways pipe drift→Specified guide
  6. Support pipe through vertical travel→Specified spring hanger

Valve Functions

Gate valve
Typical on-off isolation
Globe valve
Typical throttling service
Check valve
Closes against reverse flow
Check valve flow arrow
Matches intended flow direction
Relief valve
Opens at set pressure

Guide vs Anchor

Guide

  • Permits designed axial travel
  • Limits lateral movement

Anchor

  • Fixes pipe at design point
  • Transfers restraint forces to structure

Check the support detail

Support and Movement

Clevis hanger
Suspends pipe from structure
Rest support
Carries downward pipe load
Guide
Restrains lateral movement
Anchor
Restrains pipe at fixed point
Spring hanger
Carries load during vertical travel
Pump nozzle
Observe allowable piping loads

Grooves Grip, Gasket Seals

Housing grips grooves, gasket seals the joint.

Housing engages pipe groovesGasket seals mating pipe ends

Soldering vs Brazing

Soldering

  • Filler liquidus below 450°C
  • Copper base metal stays solid

Brazing

  • Filler liquidus above 450°C
  • Copper base metal stays solid

Compare filler metal liquidus

In-Line Devices

Steam trap
Discharges condensate, limits steam loss
Drip leg
Collects condensate for drainage
Strainer
Screens debris from flow
Thermowell
Protects temperature sensor
Expansion joint
Accommodates specified pipe movement
Desuperheater
Lowers superheated steam temperature

Installation and Special Joints

Buried pipe bedding
Provides uniform support
Haunching
Supports lower sides of pipe
Flanged joint gasket
Seals between mating faces
Grooved coupling
Housing engages grooves, gasket seals
Copper soldered joint
Lower-temperature capillary filler
Copper brazed joint
Higher-temperature capillary filler

Common Traps

Excavation protection

Shoring supports trench walls ≠ Shielding shelters workers

Offset geometry

True offset across runs ≠ Travel between fitting centers

Dimensional labels

Nominal pipe size designation ≠ Measured outside diameter

Cut layout

Kerf width removed ≠ Bevel angle created

Fit-up dimensions

Fitting center-to-face dimension ≠ Thread engagement into fitting

Drawing scale

Isometric drawn appearance ≠ Verified written fabrication dimension

Rigging capacity

Sling tension per leg ≠ Total load weight

Steam line devices

Steam trap discharges condensate ≠ Strainer catches debris

Last Minute

  1. 1.Fabrication carries 20 written items
  2. 2.Blue Book allowed during assessment
  3. 3.Hydro test filling vents air
  4. 4.Roll and set combine perpendicularly
  5. 5.45° travel ≈ 1.414× true offset
  6. 6.Size and schedule determine wall thickness
  7. 7.Allow for both butt-weld root gaps
  8. 8.P&ID traces flow and instrumentation
  9. 9.Flatter sling angles raise leg tension
  10. 10.Gate isolates, globe throttles
  11. 11.Guides allow designed axial movement
  12. 12.Steam traps discharge condensate