8.2 Rigging Practices & Inspection

Key Takeaways

  • Apply the inspection rules for the setting and gear. Check before use and during service as warranted.

  • Verify legible identification. Quarantine damaged or unidentifiable gear pending authorized disposition.

  • Check rope, webbing, roundsling, chain and hardware defects against the applicable removal criteria.

  • Verify the jack base, stroke and load share. Secure the load immediately after raising. Check hoist suspension and loading direction.

  • Use the approved signal method and assigned signal person. Honor stop signals and stop when required communication fails.

Last updated: November 2026

Rigging Practices & Inspection

Quick Answer: Safe lifts depend on inspection as much as hitch selection. Module 38102 applies inspection and safe use to slings, hardware, jacks and hoisting equipment. Check the applicable limits for broken wires, distortion, heat damage, cuts, stretched links, hooks and legible identification. Communicate clearly with the crane operator, use rated jacks and hoists correctly, and remove defective equipment from service immediately.

Section 8.1 covered what gear and hitches are. This section covers how you verify gear is fit for service and how you run the lift with disciplined practice—exactly the judgment the Rigging domain tests.

When and how to inspect

In construction, §1926.251(a)(1), (a)(6) requires pre-use rigging checks each shift, a competent-person sling and attachment inspection before use each day, and further inspection as warranted. The daily and as-needed inspection for covered general-industry slings is in §1910.184(d). Check the identification as well as the condition. Remove defective rigging immediately and keep it separate from serviceable gear.

Periodic inspection depends on the sling type, duty and requirements. For alloy chain, construction §1926.251(b)(6) and general industry §1910.184(e)(3) limit the interval to 12 months at most and require a record of the most recent inspection month. Service conditions may require shorter intervals. Use the applicable manufacturer and ASME B30 inspection criteria and the employer’s inspection program.

Inspect the full accessible length, eyes, fittings and markings in good light. Keep hands clear of protruding wires and pinch points. Isolate and refer any uncertain defect before lifting.

Wire rope sling inspection criteria

Remove wire rope slings from service when you find conditions such as:

DefectWhat you seeWhy it matters
Broken wiresVisible breaks. Apply the count and length specified for the setting and sling.Loss of strength; sharp hazard; progressive failure
BirdcagingRope strands forced outward like a birdcageCore/strand damage from shock, rotation, or crushing; severe strength loss
Kinks / crushed sectionsPermanent sharp bends, flattened ropeBroken wires inside; reduced strength
Heat damageVisible burn or heat damage, such as discolored wireRope damage or loss of strength
Corrosion / pittingRust scale, pitted wiresSection loss
Damaged eyes/splices/sleevesCracked swages, pulled eyes, broken thimblesTermination failure under load
Core protrusionCore pushing out between strandsStructural compromise

Apply the correct wire-rope sling rule. Construction §1926.251(c)(4) prohibits use if visible broken wires exceed 10% of the total wires in a length of eight rope diameters, or if excessive wear, corrosion or another defect is evident. General industry §1910.184(f)(5)(i) specifies 10 randomly distributed broken wires in one lay, or five in one strand in one lay. A lay is the axial length over which a strand makes one complete turn around the rope. Manufacturer instructions can require removal sooner. Crane running-rope criteria address different equipment. Birdcaging or other structural distortion warrants immediate removal.

Synthetic sling inspection

Apply the federal rules for covered synthetic web slings, including construction §1926.251(e) or general industry §1910.184(i), and the manufacturer’s inspection criteria. Reject defects such as:

  • Cuts, tears, snags — Edge cuts are especially dangerous; a small cut can open under load
  • Broken or worn stitching — Load-bearing seams coming apart
  • Holes, crushing, or abrasion that thins the webbing
  • Heat or chemical damage — Melting, charring, hard glassy spots, bleached or stiff areas from chemicals
  • Damaged eyes or fittings
  • Knots — Never use a knotted synthetic sling for lifting
  • Illegible or missing identification tag — Capacity and material info must be readable

Key Point: An illegible tag is not a paperwork annoyance—it is a remove-from-service condition. Without a tag, you cannot verify WLL, material, or hitch ratings.

Roundslings enclose load-bearing yarns in a cover. OSHA’s roundsling guidance and the applicable manufacturer criteria address missing identification, exposed or damaged core yarns, heat or chemical damage and other defects. OSHA’s sling guidance distinguishes roundslings from the types specifically covered by its sling standards. Use applicable rigging rules, ASME B30.9 and the product instructions. Keep damaged slings out of service pending authorized disposition.

Chain sling inspection

Alloy chain slings require link-by-link attention:

  • Stretched links — Elongation or opening of the link shape
  • Gouges, nicks, cracks — Stress risers that lead to sudden failure
  • Bent or twisted links
  • Worn links below the applicable minimum remaining section. Check the OSHA wear table for the setting and the manufacturer limits.
  • Damaged master links, coupling links, or hooks
  • Missing or illegible identification

Remove suspect heat-damaged chain for disposition. For example, §1910.184(e)(6) requires permanent removal of covered alloy chain slings heated above 1,000°F, and a manufacturer-based reduction in service above 600°F. Check the product rating and any stricter limit.

Hardware inspection (shackles, hooks, eye bolts)

ComponentReject when…
ShacklesBent body or pin, stretched bow, damaged threads, wrong/missing pin, excessive wear, cracks
HooksPoint opened beyond throat tolerance, twist, cracks, bent shank, missing/broken latch where required, wear beyond limits
Eye boltsBent eye, stretched eye, damaged threads, shoulder not seating, cracks, unknown origin/rating
Master links / ringsDistortion, cracks, wear, elongation
Turnbuckles / hardwareThread damage, bent bodies, unknown ratings for lifting use

Compare hook throat opening, twist and wear with the applicable regulation and hook instructions. For hooks covered by Crosby’s instructions, the throat-opening limit is 5%, with a maximum increase of ¼ in. Visible bending or twist also warrants removal. Do not bend a hook back into shape. Verify each shackle uses its correct compatible pin.

Jacks and hoisting equipment

For covered construction jacks see §1926.305; for general industry see §1910.244(a). Read the jack rating, check the travel limit, inspect the jack and verify the foundation and load path. Multi-point systems need an approved plan for each jack’s load and load transfer. Follow the model instructions for cap contact, alignment and any blocking.

Secure the load immediately after raising it. Use approved blocking, cribbing or other securement and keep clear of crush points during load transfer. The Enerpac bottle jack instructions distinguish lifting from supporting a load for work. Check the footing and approved lifting direction before applying force.

For overhead hoists covered by construction §1926.554(a), the safe working load must be marked and respected. The support must have a safe working load equal to the hoist rating and allow the hoist to align with the load. For a chain or lever hoist, verify the suspension and attachment ratings, inspect controls, brake, chain and hooks, and keep the chain free of twist. The Ingersoll Rand LV hoist manual requires an in-line pull through the hooks, the load seated in the hook bowl, and use within rating. Never wrap the hoist load chain around the load as a sling. Use the rated trolley, clamp or structural attachment for the model and setup.

Reject and remove-from-service rules

When gear fails inspection:

  1. Stop — Do not complete “one more lift”
  2. Tag — Mark “Do Not Use” or follow site red-tag procedure
  3. Segregate — Remove from the gang box of serviceable rigging so nobody grabs it by mistake
  4. Report — Notify supervision; send for destruction, repair by authorized parties, or manufacturer disposition as appropriate
  5. Replace — Obtain inspected, tagged gear before resuming

Only the authorized process can reidentify, repair, test or permanently retire gear. For example, §1910.184(i)(8) requires manufacturer or equivalent repair and proof testing before a repaired covered general-industry web sling goes back into service. A field patch cannot restore a rating.

Communication with the crane operator

Many pipefitting lifts use a mobile crane, gantry, or overhead crane. Communication failures cause struck-by and crushed-by incidents.

For covered construction cranes apply §§1926.1419–1422 and 1926.1428 as appropriate. Agree on the signal method, directions from the operator’s perspective, and the qualified signal person when one is required. Use one person at a time for operational signals. Everyone must signal Stop or Emergency Stop when they detect a safety problem. If the required signal path is lost or signals conflict, safely stop. Restore a reliable signal path and clear direction before continuing. Switch methods only when the crew has the applicable qualified means of communication in place.

Brief the load weight, radius, route, blind spots, wind and power-line controls. Keep workers clear of the swing and fall zones except as the applicable work rules allow. Keep people off the load and hook during material handling.

Pre-lift briefing checklist for pipe crews:

ItemConfirm
Load weight and CGKnown and within crane/rigging capacity at the working radius
GearInspected; hitch chosen; specified edge protection in place
PathPick, swing, and set locations clear; tag-line plan
Exclusion zoneBarricaded; nonessential personnel out
Power lines / overheadDistance and spotter rules met
Weather / windWithin limits for the load’s sail area
SignalsMethod and designated person identified

Site practices that protect pipefitters

  • Use the specified edge protection at flanges, beveled ends and sharp steel
  • Select the bridle and lift points to support and stabilize the load. Check all leg tensions and assembly ratings (Section 8.3).
  • Keep unused sling legs controlled so they do not snag
  • Land loads on dunnage so slings can be extracted without rolling the load onto hands
  • Watch for dynamic loading when loads break free of mud, friction, or temporary fasteners

Scenario: illegible tag on a “favorite” web sling

A crew has used the same green web sling for months. This morning the capacity tag is worn blank and one edge shows a cut through several rows of weave. Production wants the 350 lb check valve hung now. Correct action: remove the sling from service, tag it out, and select a different sling with a legible tag and no cuts. The few minutes spent swapping gear are nothing compared with a dropped valve in a rack full of people.

Scenario: operator and signal conflict

Two pipefitters wave different directions while a spool hangs over a grating opening. Correct practice: stop the lift (Emergency Stop if needed), clear all but one signal person, reestablish the plan, and only then continue. Conflicting signals are a known cause of load swing into structure.

Putting Module 38102 inspection practice together

  1. Inspect every sling and hardware piece before use.
  2. Know rejection signs: broken wires, birdcaging, heat damage, cuts, stretch, opened hooks, illegible tags.
  3. Keep jacks and hoists within their ratings. Secure jack-raised loads at once with approved blocking or support.
  4. Tag out and segregate bad gear; replace before lifting.
  5. Brief the lift; one signal person; Emergency Stop authority for all; stop when communication is lost.

Inspection and communication turn basic hitch knowledge into reliable field practice—the difference between a routine valve set and an incident report.

Test Your Knowledge

A synthetic web sling’s identification tag is worn completely blank so capacity cannot be read. What is the correct action?

A

Use it only for loads under 500 pounds

B

Estimate capacity from the sling width

C

Remove it from service pending authorized reidentification or replacement

D

Knot the sling to shorten it and continue

Test Your Knowledge

Which wire rope condition is characterized by strands forced outward from the rope core, resembling an open cage?

A

Proper lubrication bloom

B

Birdcaging

C

Normal constructional stretch only

D

Acceptable surface rust that always increases strength

Test Your Knowledge

During a crane lift of a pipe spool, two workers give opposite hand signals. What should happen?

A

The lift stops until a single designated signal person directs the operator

B

The operator averages the two signals and continues swinging

C

Both workers climb onto the load to steer it by hand

D

The operator ignores signals and uses only the load moment indicator

Test Your Knowledge

A hydraulic jack has raised one end of a pump base so pipefitters can align anchor bolts. Which practice is correct?

A

Leave the pump on the jack while workers reach below the base

B

Side-load the jack to push the base into position

C

Use an unmarked jack if its body looks strong enough

D

Secure the raised load immediately with approved blocking and keep clear during load transfer

Sections you finish are checked off in the contents.