2.2 Horizontal Branch Drains, Pitch & Changes in Direction

Key Takeaways

  • Horizontal branch drains 2 inches or smaller need at least 1/4 inch per foot of pitch; branches larger than 2 inches need at least 1/8 inch per foot.

  • All horizontal drain piping 4 inches or larger must be pitched to produce a computed velocity of at least 2 feet per second flowing half full.

  • In Table 382.30-2, a horizontal branch may carry at most 3 dfu at 1-1/2 inches, 6 dfu at 2 inches, 20 dfu at 3 inches and 160 dfu at 4 inches.

  • Running threads, heel inlets placed horizontally, ledged enlargement chambers and drilling-and-tapping connections are prohibited drain fittings (SPS 382.30 (9) (c)).

  • Drain piping above food, ice or potable-liquid areas needs sleeves 1 inch above the floor, wall-mounted fixtures, seepage pans and accessible ceilings.

Last updated: October 2026

What counts as a horizontal branch

A horizontal branch drain collects fixture drains and carries them to a stack or a building drain. It is not a building drain, building subdrain, building sewer or private interceptor main sewer. Those are sized with Table 382.30-3 and are covered in section 2.4. Footnote b of Table 382.30-2 says this directly: the "drain piping other than stacks" column does not include building drains, subdrains, sewers or forced discharge piping.

Sizing horizontal branches with Table 382.30-2

Pipe diameter (in.)Max dfu, drain piping other than stacks
1-1/41
1-1/23
26
320
4160
5360
6620
81,400
102,500
123,900

Three points come up repeatedly:

  • A 2-inch branch holds 6 dfu. Seven dfu needs a 3-inch branch.
  • A 3-inch branch holds 20 dfu, and the jump to 4 inches allows 160.
  • The values are maximums "through any portion" of the pipe, so check the most heavily loaded segment, usually just upstream of where the branch joins the stack.

Minimum trap sizes still come from Table 382.30-1: a lavatory trap is 1-1/4 inches and a shower trap 2 inches. A branch sized from the dfu total alone must still accept those trap outlets.

Minimum pitch (SPS 382.30 (5))

PipeMinimum pitch
Horizontal branch drain, 2 in. or less1/4 inch per foot
Horizontal branch drain, larger than 2 in.1/8 inch per foot
Any horizontal drain 4 in. or largerPitch giving at least 2 ft/s computed velocity flowing half full
Building drains and building sewers up to 10 in.Per Table 382.30-3
Building sewers 12 in. and larger, private interceptor main sewers 8 in. and largerNR 110.13 municipal sewer criteria
Campground, RV park and manufactured home community drainsPer Table 382.30-3

Worked example. A 40-foot run of 3-inch horizontal branch at the minimum 1/8 inch per foot drops 40 x 0.125 = 5 inches. The same length of 2-inch branch at 1/4 inch per foot drops 10 inches. That drop often decides whether the branch can reach the stack above a basement ceiling.

Changes in direction (SPS 382.30 (8))

Changes in direction must use 45-degree wyes, long or short sweep quarter bends, or sixth, eighth or sixteenth bends (or equivalent combinations). For drain piping 8 inches or smaller, fittings must meet the minimum radii in Table 382.30-4:

Pipe (in.)Horizontal to verticalVertical to horizontal and horizontal to horizontal
1-1/41-1/82-1/4
1-1/21-3/82-3/4
21-7/83-1/4
32-7/84-1/16
43-3/44-7/8
54-1/26-1/2
657
868

Three exceptions relax the table for the first 90-degree fitting downstream of certain fixtures:

  1. Lavatory or sink trap, 1-1/2 inch drain: 1-3/4 inch minimum radius, and the fitting must be a tee or quarter bend.
  2. Water closet on 3-inch drain: 2-1/2 inch minimum radius.
  3. Water closet on 4-inch drain: 3-inch minimum radius.

Where blowout-type fixtures are installed back to back, fittings must keep waste from passing from one fixture into the other (SPS 382.30 (8) (b)).

Fittings and connections (SPS 382.30 (9))

Fittings may not retard flow more than normal friction. Specific rulings:

  • A 4 x 3 inch closet bend or collar reduction is not an obstruction.
  • The side inlet of a low- or high-pattern tee or bend may not be used as a vent connection when the side inlet is horizontal.
  • Prohibited for drain piping: a heel inlet bend with the heel inlet horizontal, any fitting with an enlargement chamber or a ledge or shoulder, a reduction in area in the direction of flow, running threads, and connections made by drilling and tapping (unless the department approves).
  • Pipe saddles must meet SPS 384.30 (5) (d).

Drain piping over food and pool areas (SPS 382.30 (13))

Where drain piping runs below the ceiling of a space where food, ice or potable liquids are prepared, handled, stored or displayed:

  1. Floor penetrations need sleeves bonded to the floor that protrude at least 1 inch above the finished floor, with the annular space sealed.
  2. Fixtures above, except bathtubs and showers, must be wall-mounted; bathtub waste-and-overflow connections must be made above the floor.
  3. Floor and shower drains above need integral seepage pans.
  4. Cleanouts must extend through the floor above.
  5. Piping that can sweat must be insulated.

The ceiling must be removable or have access panels. Exposed drain piping may not be located over a pool, surge tank or open pool filter unless a trough diverts seepage to an approved discharge point.

Loading diagram...
Sizing and installing a horizontal branch
Test Your Knowledge

What is the minimum pitch for a 2-inch horizontal branch drain under SPS 382.30 (5) (a)?

A

1/4 inch per foot

B

1/16 inch per foot

C

1/8 inch per foot

D

1/2 inch per foot

Test Your Knowledge

A horizontal branch drain will carry 18 dfu. What is the smallest diameter permitted by the drain-piping-other-than-stacks column of Table 382.30-2?

A

2 inches

B

4 inches

C

2-1/2 inches

D

3 inches

Test Your Knowledge

Which connection does SPS 382.30 (9) (c) prohibit in drain piping?

A

A 4 x 3 inch closet bend

B

A long sweep quarter bend

C

A connection made by drilling and tapping the pipe

D

A combination wye and eighth bend