9.3 Design Flow, Septic & Holding Tanks and Tank Construction

Key Takeaways

  • Design wastewater flow is at least 150% of estimated daily flow; a dwelling's combined flow is estimated at 100 gallons per bedroom per day (60 gray and 40 black when segregated).

  • A holding tank must hold at least 5 times the estimated daily flow or 2,000 gallons, whichever is greater, with its service opening within 25 feet of an all-weather road.

  • Tank manhole openings are at least 23 inches; septic tank manholes rise to within 6 inches of grade, while those over pumps and holding tank service openings extend at least 4 inches above grade.

  • Holding tank suction and discharge lines are at least 3 inches with a quick-disconnect service port at least 2 feet above grade, and may not allow gravity or siphon drainage.

  • Septic tanks are pumped when sludge plus scum equals 1/3 of tank volume; holding tanks when the level is 1 foot below the inlet invert.

Last updated: October 2026

Estimating flow (SPS 383.43 (2) to (6))

Flow typeEquation (B = bedrooms, 2 persons each)
Combined graywater, clear water and blackwater from a dwelling100 gallons x B
Segregated graywater and clear water60 gallons x B
Segregated blackwater40 gallons x B
Public buildings and places of employmentMeasured flow or a detailed per-capita or per-use estimate

Design wastewater flow must be at least 150 percent of the estimated daily flow to cover peaks.

Worked example. A 4-bedroom house: estimated flow = 100 x 4 = 400 gpd; design flow = 400 x 1.5 = 600 gpd. A restaurant on the same POWTS adds its own estimate from the SPS 383 Appendix or metered data. Its grease interceptor for a POWTS must be at least 1,000 gallons (SPS 382.34 (5)).

General design requirements (SPS 383.43 (8))

  • Gravity piping between components: at least 1 ft/s computed velocity at half full.
  • Pressurized piping upstream of in situ soil components: at least 2 ft/s.
  • Gravity piping inside an in situ soil component: level, or pitched downstream no more than 4 inches per 100 feet.
  • Alarms: mechanical treatment or distribution devices need an automatic visual or audible failure alarm on a circuit separate from the device. Pump alarms stay on until manually silenced, and duplex pumps must switch over automatically. A holding tank needs an alarm that warns when servicing is needed.
  • Tanks in saturated soil must be anchored against flotation. Components inside buildings must be gastight.
  • Every component that needs maintenance must be accessible.

Tank construction (SPS 384.25)

TopicRequirement
Watertightness, concrete with coverHold a vacuum of 2 in. Hg for 60 minutes, or hold water for 1 hour after a 24-hour soak and refill to the top of the cover
Watertightness, steel with cover5 psig air for 15 minutes, or 5 psig water for 60 minutes
Concrete durabilityProtective coating above the lowest liquid level, or concrete with a water-cement ratio of 0.45 or less
SteelCoated inside and out; buried tanks need cathodic protection (UL 1746 or STI-P3)
VentingEvery tank (except camping-unit transfer containers) vents gases; vent terminals per SPS 382.31 (16)
ManholesAt least 23 inches in least dimension
Septic (anaerobic) tanks below groundManhole over the inlet of the first compartment, in each compartment, and over all treatment apparatus and pumps; manholes within 6 inches below grade, but those over apparatus and pumps at least 4 inches above grade
Holding tank service openingsAt least 4 inches above grade, at least 23 inches, over any pumps or siphons
SecurityCovers at or above ground on openings larger than 8 inches need locking devices or other effective measures
Warning labelCovers on openings over 8 inches get a permanent warning label, at least 4 x 5 inches, lettering at least 1/2 inch
Tank labelsManufacturer, capacity of each compartment or model number; NSF 40 aerobic units carry 2 label plates with rated daily flow

Holding tanks (Holding Tank Component Manual, version 2.1, May 2022, valid through May 2027)

SpecificationRequirement
Capacity5 x estimated daily flow, or 2,000 gallons, whichever is greater
Service accessFarthest service opening or pump-out port within 25 feet of an all-weather road
AlarmHigh-level warning per SPS 383.43 (8) (e) 2. and SPS 384.25 (10)
Vent2-inch inside diameter, Table 384.30-1 material, opening oriented down
SetbacksTable 383.43-1

Service lines (SPS 383.43 (8) (j)):

  • Suction and discharge lines at least 3 inches.
  • A quick-disconnect service port with a removable plug, at least 2 feet above grade, labeled with a permanent sign and secured to a support.
  • The line may not allow the tank to drain by gravity or siphon.
  • A lift station discharge may be 2 inches, with a keyed switch at the port.

Worked example. A seasonal cabin with 2 bedrooms: estimated flow 200 gpd, and 5 x 200 = 1,000 gallons. The 2,000-gallon minimum is greater, so the tank must hold 2,000 gallons. A 6-bedroom lodge (600 gpd) needs 5 x 600 = 3,000 gallons. Above 3,000 gpd design, plan review moves from the county to the department or a designated agent (Table 383.22-2).

When tanks must be pumped (SPS 383.54 (3) and (4))

TankService trigger
Anaerobic treatment (septic) tankWhen combined sludge and scum equal 1/3 of tank volume
Holding tankWhen wastewater reaches 1 foot below the inlet invert
RV transfer tankServiced so nothing discharges to soil or ground surface

These triggers apply to systems installed before July 1, 2000 as well. The management plan must specifically address servicing if a tank bottom is more than 15 feet below the servicing pad elevation or more than 150 feet horizontally away. Servicing is done by licensed septage operators under NR 113 and NR 114.

Grease and remodels

Kitchen and food wastes from non-dwelling occupancies on a POWTS pass through a grease interceptor of at least 1,000 gallons. In remodels where separating kitchen and toilet waste isn't practicable, the combined waste may go to a POWTS tank sized with the interceptor capacity added to the septic tank capacity (SPS 382.34 (5) (b) 2.).

Loading diagram...
Sizing a holding tank
Test Your Knowledge

What is the estimated daily wastewater flow for a 3-bedroom dwelling under SPS 383.43 (3) (a), and what is its design flow?

A

300 gpd estimated; 450 gpd design

B

150 gpd estimated; 225 gpd design

C

450 gpd estimated; 675 gpd design

D

300 gpd estimated; 300 gpd design

Test Your Knowledge

What minimum capacity does the Holding Tank Component Manual require for a dwelling with an estimated daily flow of 300 gallons?

A

1,000 gallons

B

1,500 gallons

C

2,000 gallons

D

3,000 gallons

Test Your Knowledge

When must an anaerobic treatment (septic) tank be serviced under SPS 383.54 (3) (b)?

A

Every 12 months regardless of contents

B

When the liquid reaches 1 foot below the inlet invert

C

When sludge alone fills half the tank

D

When combined sludge and scum equal 1/3 of the tank volume

Sections you finish are checked off in the contents.