2.4 Building Drains, Building Sewers & Private Interceptor Main Sewers
Key Takeaways
Table 382.30-3 lets a 4-inch building drain or sewer carry 180 dfu at 1/8 inch per foot, 216 at 1/4 inch and 250 at 1/2 inch; 1/16-inch pitch is permitted only at 8 inches and larger.
A gravity-flow sanitary building sewer must be at least 4 inches in diameter; pressurized sewers must be at least 2 inches for ejectors and sewage pumps and 1-1/4 inches for grinder pumps.
The top of a building sewer must be at least 42 inches below finished grade, or 18 inches where it discharges to a septic tank, holding tank or grease interceptor.
Frost protection is required where the sewer top is less than 60 inches below a snow-cleared surface or less than 42 inches below a surface not cleared of snow.
Buried nonmetallic sewers draining to municipal mains need locating means, such as 18-gauge insulated copper tracer wire with green insulation within 6 inches above the pipe.
Definitions that drive the answer
- Building drain: horizontal piping within or under the fully enclosed part of a building, below the lowest fixture, that drains by gravity to the building sewer (SPS 381.01 (39)).
- Building subdrain: the horizontal portion that does not flow by gravity to the sewer, so it discharges to a sump (SPS 381.01 (47)).
- Building sewer: the part of the drain system outside the fully enclosed building that conveys discharge to a public sewer, private interceptor main sewer, POWTS or other discharge point (SPS 381.01 (44)).
- Private interceptor main sewer: a sewer serving 2 or more buildings that is not part of the municipal system (SPS 381.01 (193)).
Table 382.30-3: building drains, subdrains, sewers and private interceptor main sewers
| Diameter (in.) | 1/16 in./ft | 1/8 in./ft | 1/4 in./ft | 1/2 in./ft |
|---|---|---|---|---|
| 1-1/4 | NP | NP | 1 | 1 |
| 1-1/2 | NP | NP | 3 | 3 |
| 2 | NP | NP | 6 | 9 |
| 3 | NP | 36 | 42 | 50 |
| 4 | NP | 180 | 216 | 250 |
| 5 | NP | 390 | 480 | 575 |
| 6 | NP | 700 | 840 | 1,000 |
| 8 | 1,400 | 1,600 | 1,920 | 2,300 |
| 10 | 2,500 | 2,900 | 3,500 | 4,200 |
NP means not permitted. Pipes 3 to 6 inches cannot be laid at 1/16 inch per foot, and pipes 2 inches and smaller need at least 1/4 inch per foot. Building sewers 12 inches and larger, and private interceptor main sewers 8 inches and larger, follow the municipal criteria in NR 110.13.
Worked example. A commercial building drain carries 200 dfu. At 1/8 inch per foot a 4-inch drain is limited to 180, so it needs 5 inches; at 1/4 inch per foot a 4-inch drain (216) works. Pitch can save a pipe size.
Minimum sizes (SPS 382.30 (4) (b) and (c))
| Pipe | Minimum |
|---|---|
| Gravity sanitary building sewer | 4 inches (a municipality may require more between the lot line and the public sewer) |
| Pressurized sewer, ejector or sewage pump | 2 inches and 2 ft/s velocity |
| Pressurized sewer, grinder pump | 1-1/4 inches and 2 ft/s velocity |
| Gravity private interceptor main sewer | 4 inches |
Building drain elevation and backwater (SPS 382.30 (11) (b))
- Building drains go below the lowest floor on which fixtures may be installed, if the sewer elevation permits.
- Where an above-ground building drain discharges to a vertical pipe, it must connect to the building sewer at least 30 inches above the basement floor.
- A building drain subject to backflow must be protected by a backwater valve or a sump with pumping equipment. The valve must have full-pipe capacity when open and be readily accessible for cleaning.
- A floor that is entirely below grade and has a plumbing fixture or appliance must have a floor drain.
Depth and frost protection (SPS 382.30 (11) (c))
| Condition | Requirement |
|---|---|
| Minimum depth to top of building sewer | 42 inches below finished grade |
| Sewer discharging to septic tank, holding tank or grease interceptor | 18 inches minimum |
| Top less than 60 inches below a surface cleared of snow | Frost protection required |
| Top less than 42 inches below a surface not cleared of snow | Frost protection required |
Frost protection is not required: within 30 feet of the building drain where the sewer feeds a holding tank, POWTS tank or grease interceptor under an uncleared surface; where the predicted frost depth (Figure 382.30-1 and Table 382.30-6) doesn't reach the pipe; or for public facilities closed from November 15 to March 15 that are not places of employment.
The approved insulation methods are:
- Flat extruded polystyrene: at least 18 inches below grade and at least 6 inches above the pipe. Thickness and width come from Tables 382.30-5 and 382.30-7, and any height above 6 inches is added to the width.
- Box method: a 3-sided polystyrene box at least 12 inches below grade, 6 inches above and 6 inches to each side of the pipe.
- Lightweight insulating concrete: placed to the spring line, extending 6 inches each side, with the top at least 12 inches below grade.
Trenching, bedding and backfill (SPS 382.30 (11) (e))
- Use open-trench work unless a local ordinance or inspector allows otherwise.
- Where stone over 1 inch or bedrock is found, excavate 3 inches below grade and bed with material that passes a 3/4-inch sieve, compacted to 90 percent standard Proctor.
- Initial backfill extends 12 inches over the pipe, uses material passing a 1-inch sieve, and is placed in lifts of 6 inches or less, well tamped.
- Provide at least 36 inches of cover before wheel-loading the trench.
- Unstable bottoms: drive sheathing 48 inches below the trench bottom, remove 24 inches of soft material and replace it, or pour a reinforced concrete cradle or slab at least 3 inches thick.
Connections and location rules
- A building sewer may not pass under one building to serve another, except for farm buildings on one property or buildings on the same property with a piping document recorded with the register of deeds within 90 days.
- If no public sewer connection exists within 3 feet of the designated point, use an approved saddle, a cut-in tee or wye, or for concrete or clay mains a connection encased in at least 3 inches of concrete.
- A forced sewer connecting to a pressurized public sewer needs a curb stop, a check valve and an accessible quick disconnect upstream of the check valve.
- Separation from wells follows NR 811 and NR 812.
- Tracer wire for nonmetallic sewers: at least 18-gauge insulated single-conductor copper, within 6 inches above the pipe, green insulation, accessible at 400-foot intervals, and conductivity-tested. Warning tape is not a substitute. Recording GPS data with the municipality is an alternative.
- Storm and clear water may not discharge to a sanitary building drain connected to a publicly owned treatment works, except as SPS 382.36 (3) allows.
A building drain will carry 200 dfu. Which choice satisfies Table 382.30-3?
4-inch drain at 1/8 inch per foot
3-inch drain at 1/2 inch per foot
4-inch drain at 1/4 inch per foot
4-inch drain at 1/16 inch per foot
Under SPS 382.30 (11) (c), what minimum depth below finished grade is required for the top of a building sewer that discharges to a public sewer?
18 inches
30 inches
36 inches
42 inches
A building sewer's top will be 50 inches below a driveway that is plowed all winter. What does SPS 382.30 (11) (c) 2. require?
Frost protection, because the sewer is less than 60 inches below a snow-cleared surface
No frost protection, because the sewer is deeper than 42 inches
Frost protection only if the sewer is plastic
A larger pipe size instead of insulation
Sections you finish are checked off in the contents.