7.3 Nevada Residential Construction Recovery Fund (NRS 624.470–624.510)

Key Takeaways

  • The Recovery Fund is for eligible injured owners of covered single-family residences. The Board or its designee evaluates actual damages caused by a Chapter 624 violation.

  • NRS 624.470 lists biennial assessment ceilings of $200 for limits through $1 million, $500 for higher limited licenses, and $1,000 for unlimited licenses.

  • NRS 624.510 limits individual payments to $40,000 and sets a separate aggregate limit of the lesser of $750,000 or 20% of the account balance for claims against one contractor.

  • File a Board complaint within four years of completion of qualified services, or follow the separate judgment application route within two years after obtaining a qualifying judgment.

  • NRS 624.510 excludes specified cases, including a claimant who applied for and obtained a building permit for the residence at issue or constructed it as the owner-builder.

Last updated: November 2026

Nevada Residential Construction Recovery Fund

The Recovery Fund is a separate account from an individual contractor’s license bond. It may compensate eligible injured owners when a licensed residential contractor’s violation of Nevada Revised Statutes (NRS) Chapter 624 or its regulations causes actual damages. A Board claim requires evidence of the contract, loss, and other recovery. An unpaid invoice by itself does not establish Fund eligibility.

Identify the Owner and the Qualified Work

Under NRS 624.420–.455, look for an injured owner and qualified services, such as remodeling or repairs by a residential contractor on an owner-occupied single-family residence. The definition can include a qualifying owner-occupied condominium, townhouse or duplex unit. Common areas and non-family rentals covered by the statutory exclusion are outside that definition. Eligibility may also extend to a subsequent owner under the statutory definitions. A qualifying loss can include paying to release a lien where the contractor received sufficient funds for the materials or services but willfully or deliberately failed to pay when due.

NRS 624.510(2) separately excludes specified claims. Check whether the contractor’s license was suspended or revoked at contract signing, whether the claimant applied for and obtained a building permit for the residence or constructed it as an owner-builder, and whether a disqualifying personal or business relationship applies. The statute also addresses false documents, unperfected liens by lien claimants, and intent to rent, lease or sell within one year of completion. An offer within that year creates a rebuttable presumption of such intent. Work by a person who was never a licensed residential contractor fails the threshold for this Fund.

Separate the Contractor Assessment from the Owner’s Claim

The Board administers the Fund from a biennial assessment collected from residential contractors in addition to the license fee. Under NRS 624.470, the statutory assessment ceilings are:

Contractor monetary limitBiennial assessment ceiling
Up to and including $1,000,000$200
More than $1,000,000, with a limited license$500
Unlimited$1,000

Subsection 3 requires a reduction when the account balance reaches 150% of the highest balance in the previous fiscal year. The assessment used to fund the account does not determine an individual homeowner’s award. Separately, NRS 624.520 requires the residential contractor to give the owner a written statement of Fund rights in the agreement for qualified services.

Choose the Filing Path and Track Its Deadline

Keep the signed contract, approved changes, proof of payments, documents supporting actual damages, and any bond payment or lien release. The Board’s claim instructions ask for payment records and a copy of a qualifying court judgment if applying through that route.

PathTime limit and key step
Complaint to the Board or its designeeFile within four years after completion of qualified services under NRS 624.480. NRS 624.500 provides for a hearing and requires action on the complaint within six months of filing with the Board.
Application based on a court judgmentApply within two years after obtaining the qualifying judgment under NRS 624.490. Proceedings, including appeals, must have ended. Provide the required form and satisfactory proof of the judgment. On payment, assign enforcement rights to the Board up to the amount paid.

Determine Potential Payment and Later Rights

NRS 624.510(3) allows payment of actual damages, up to $40,000. Under the judgment route, only actual damages included in the judgment and still unpaid qualify, subject to the same ceiling. Subsection 5 requires the Board to deduct amounts recovered from sources other than the Fund. Its guidance instructs claimants to exhaust other means of recovery. Subsection 7 separately limits all claims against one contractor to $750,000 or 20% of the account balance, whichever is less, measured as specified on the date the Board approves payment of the claims.

For example, a qualified homeowner has $36,000 in actual damages and has collected $6,000 from license security. Assuming all eligibility requirements are met and sufficient aggregate capacity remains, the difference is $30,000. If the account balance on the approval date is $2.5 million, 20% is $500,000. That is the aggregate ceiling for the contractor because it is less than $750,000. In a separate example with $54,000 in actual damages, no outside recovery and sufficient aggregate capacity, the individual ceiling is $40,000.

After payment, the Board is subrogated to the injured person’s rights to the extent paid. That can include rights against a bond or cash deposit. The Board can order repayment under NRS 624.300. NRS 624.530 also permits suspension or revocation and restrictions on obtaining or renewing a license pending repayment in the specified case involving the owner’s payment to release a lien. An award and a disciplinary action are distinct Board decisions.

Nevada Recovery Fund statutes, NRS 624.400–.560 · NSCB Recovery Fund eligibility and claim instructions

Loading diagram...
Recovery Fund Claim Decisions
Test Your Knowledge

A licensed residential contractor holds a Nevada license with a monetary limit of $1,500,000. What is this contractor's biennial Residential Construction Recovery Fund statutory assessment ceiling under NRS 624.470?

A

$100 per biennium

B

$200 per biennium

C

$1,000 per biennium

D

$500 per biennium

Test Your Knowledge
Multi-Select

Suppose a claim otherwise meets the law’s substantive and procedural requirements. Which facts would independently prevent recovery from Nevada’s Residential Construction Recovery Fund? Select all that apply.

Select all that apply

The homeowner applied for and obtained the building permit for the residence and work at issue.

The eligible injured owner filed the administrative complaint three years after completion of qualified services.

The contractor's license was already suspended by the NSCB on the date the construction contract was signed

The business hired to perform the work never held a Nevada contractor license.

Test Your Knowledge

An eligible homeowner has $36,000 in actual damages and has already recovered $6,000 from a contractor license bond. No other offsets apply and the contractor’s aggregate limit leaves enough funds. Under NRS 624.510, what is the maximum Fund payment in this example?

A

$36,000

B

$30,000

C

$40,000

D

$6,000

Sections you finish are checked off in the contents.