3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions

Key Takeaways

  • Minnesota Rules part 1315.0200 incorporates the 2026 NEC (NFPA 70-2026) by reference, and DLI states that it became effective August 17, 2026, and is the edition used for exam questions.

  • NEC 90.5 makes rules using "shall" or "shall not" mandatory, rules using "shall be permitted" or "shall not be required" permissive, and Informational Notes explanatory only.

  • In the 2026 NEC, branch-circuit, feeder, and service load calculations are in Article 120, not Article 220.

  • Article 100 defines a continuous load as one where the maximum current is expected to continue for 3 hours or more.

  • Minnesota Rules part 3801.3620 requires electrical equipment to be listed and labeled by a testing laboratory unless an approved alternative evaluation is accepted.

Last updated: October 2026

3.1 Navigating the 2026 NEC: Article 90, Code Structure & Article 100 Definitions

Quick Answer: The Minnesota exam is based on the 2026 NEC, and DLI provides a soft-cover copy at the test site. Learn Article 90's rules for reading the Code, know where the 2026 edition moved familiar material (load calculations are now Article 120), and master the Article 100 definitions that decide many questions.

How Minnesota adopts the NEC

Minnesota Rules part 1315.0200 requires all new electrical wiring, apparatus, and equipment to comply with the 2026 edition of the National Electrical Code (NFPA 70-2026), Minn. Stat. 326B.35, and the Minnesota State Building Code. The NEC is incorporated by reference and made part of the State Building Code. DLI's exam guide states that the 2026 NEC became effective August 17, 2026, and is the edition used for exam questions.

DLI's exam guide adds two practical points:

  • The Code book provided at the exam is a soft-cover copy without tabs or other aids.
  • The NEC now shows SI (metric) units first with inch-pound units in parentheses. Compliance with either value is compliance with the Code, but all exam questions and answers use inch-pound units.

Article 90: reading the Code correctly

SectionWhat it saysExam use
90.1 PurposeThe practical safeguarding of persons and property from hazards arising from the use of electricityThe NEC is a minimum safety standard, not a design manual
90.2 ScopeCovers installation and removal of conductors, equipment, raceways, signaling and communications systems, and optical fiber for public and private premises, yards, lots, carnivals, and similar sitesUtility generation, transmission, and distribution under exclusive utility control are not covered
90.4 EnforcementThe authority having jurisdiction (AHJ) interprets the Code, approves equipment and materials, and may permit alternative methods where equivalent safety is achievedIn Minnesota the AHJ is the state electrical inspector or a local inspection program
90.5 Language"Shall" and "shall not" are mandatory; "shall be permitted" and "shall not be required" are permissive; Informational Notes are explanatory and not enforceableDo not answer a question with an Informational Note as if it were a requirement
90.9 UnitsSI units are primary, inch-pound units follow in parenthesesDLI questions use inch-pound units

Utility-owned office buildings, warehouses, garages, and similar buildings that are not an integral part of a generating plant, substation, or control center are covered by the NEC. Utility facilities used for the utility function are not. Minnesota mirrors this in Minn. Stat. 326B.36, which exempts utility facilities used for the utility function from inspection unless they are on the load side of the service point.

How the 2026 NEC is organized

The 2026 edition made large structural changes. Knowing where material now lives saves time on an open-book exam.

Change in the 2026 NECWhat to know
Article 120 (new location)Branch-circuit, feeder, and service load calculations moved here from Article 220
Article 130 (new)Energy management systems, including power control systems, moved from Article 750
Article 206 (new)General requirements for non-power-limited remote-control and signaling circuits
Article 406 (expanded)Now covers "wiring devices": receptacles, cord connectors, attachment plugs, snap switches, dimmers, and electronic control switches; small switch-type devices moved here from Article 404
Articles 245, 265, 266, 267, 268, 270, 305, 315, 495Over-1000 V ac (1500 V dc) overcurrent protection, branch circuits, feeders, outside circuits, services, grounding, wiring methods, MV cable, and equipment
Articles 720 to 723, 742, 750Consolidated general rules for limited-energy systems: wiring methods, power sources, cables, raceways and cable trays, overvoltage protection, and grounding and bonding
Article 772Fire-resistive cable systems (formerly Article 728)
Deleted articlesArticle 235 (its material moved to Articles 265 to 268), Article 770 (optical fiber), and Article 805 (communications circuits)

The Code also replaced "overcurrent protective device" with the acronym OCPD in many rules and added "ac" to rules that apply only to alternating-current systems.

Article 100 definitions that decide answers

All definitions are in Article 100, in one alphabetical list.

Access terms

TermMeaningExample
Readily accessibleCapable of being reached quickly for operation, renewal, or inspection without having to use tools (other than keys), climb over or under, remove obstacles, or use portable laddersService disconnects and most OCPDs must be readily accessible
Accessible (equipment)Admitting close approach; not guarded by locked doors, elevation, or other effective meansEquipment behind an unlocked door
Accessible (wiring methods)Capable of being removed or exposed without damaging the building structure or finishJunction boxes above lift-out ceiling panels
ConcealedRendered inaccessible by the structure or finish of the buildingCable inside a finished wall; wiring in concealed raceways is considered concealed even if it becomes accessible by withdrawing it

A box above a lay-in ceiling is accessible but not readily accessible, because reaching it requires a ladder.

Load and circuit terms

  • Continuous load: maximum current expected to continue for 3 hours or more. Conductors and OCPDs for continuous loads are generally sized at 125% of the continuous load plus 100% of the noncontinuous load.
  • Branch circuit: conductors between the final OCPD protecting the circuit and the outlets.
  • Feeder: conductors between the service equipment, a separately derived system source, or another power supply source and the final branch-circuit OCPD.
  • Service conductors: conductors from the service point to the service disconnecting means.
  • Outlet: a point on the wiring system at which current is taken to supply utilization equipment. A receptacle outlet, lighting outlet, and a hard-wired water heater connection are all outlets.

Equipment approval terms

TermArticle 100 meaning
ApprovedAcceptable to the authority having jurisdiction
ListedIncluded in a list published by an organization acceptable to the AHJ that evaluates products, maintains periodic inspection of production, and states that the item meets appropriate standards or has been tested and found suitable for a specified purpose
LabeledBearing a label, symbol, or other identifying mark of an organization acceptable to the AHJ that evaluates products and maintains periodic inspection, indicating compliance with appropriate standards
IdentifiedRecognizable as suitable for the specific purpose, function, use, environment, or application where described in a particular Code requirement

Minnesota adds its own rule. Minnesota Rules part 3801.3620 requires all electrical equipment used in an installation to be listed and labeled by a testing laboratory, except where the department accepts an alternative, such as an evaluation by a testing laboratory or by an independent registered electrical engineer with a written report filed with DLI. Equipment that the NEC specifically requires to be listed cannot use the alternatives.

Grounding and bonding terms

TermArticle 100 meaning
Grounded conductorA system or circuit conductor that is intentionally grounded (usually the neutral)
Equipment grounding conductor (EGC)The conductive path that provides a ground-fault current path and connects non-current-carrying metal parts of equipment together and to the system grounded conductor, the grounding electrode conductor, or both
Grounding electrode conductor (GEC)The conductor that connects the system grounded conductor or the equipment to a grounding electrode or to a point on the grounding electrode system
Main bonding jumperThe connection between the grounded circuit conductor and the EGC, or the supply-side bonding jumper, or both, at the service
System bonding jumperThe same connection at a separately derived system
Effective ground-fault current pathAn intentionally constructed, low-impedance path designed to carry ground-fault current to the source and allow OCPDs or ground-fault detectors to operate

Worked example: continuous loads

A store feeder serves 40 A of sales-floor lighting that operates 14 hours a day and 12 A of stockroom lighting used intermittently. The sales-floor lighting is a continuous load, so the minimum feeder ampacity is 40×1.25+12=6240 \times 1.25 + 12 = 62 A. Under 215.3, the feeder OCPD is sized the same way unless the assembly is listed for 100% continuous operation.

Test Your Knowledge

Under NEC 90.5, how should an Informational Note in the 2026 NEC be treated?

A

As explanatory material that is not an enforceable requirement

B

As a mandatory rule that the inspector must enforce

C

As a permissive rule that allows an alternative method

D

As a requirement that applies only to dwelling units

Test Your Knowledge

A junction box with splices is installed above a suspended ceiling with lift-out panels. Under Article 100, which term describes the box?

A

Readily accessible, as applied to equipment

B

Concealed, as applied to wiring methods

C

Not accessible, because a ladder is needed

D

Accessible, as applied to wiring methods

Test Your Knowledge

A candidate needs the dwelling unit standard load calculation in the 2026 NEC. Which article contains it?

A

Article 220

B

Article 120

C

Article 210

D

Article 230

Sections you finish are checked off in the contents.