Free Idaho Journeyman Electrician Exam Flashcards

Memorize 50 essential terms and definitions for the Idaho Journeyman Electrician License Examination. See the term, recall the definition, then flip to check yourself.

50 Flashcards
7 Topics
100% Free
TermClick to flip

A 12 Ω resistor has 48 V across it. What current flows?

Tap to reveal definition
Card 1 of 50General Electrical Knowledge

Filter by Topic

Jump to Card

About These Idaho Journeyman Electrician Flashcards

These 50 flashcards are designed to help you memorize key terms and definitions for the Idaho Journeyman Electrician License Examination. Each card shows a term on the front and its definition on the back—the classic flashcard format for vocabulary memorization. Use these alongside our practice questions to build both recall and comprehension.

Topics Covered

General Electrical Knowledge6 cards
Wiring and Protection12 cards
Wiring Methods and Materials10 cards
Equipment for General Use10 cards
Special Occupancies6 cards
Special Equipment3 cards
Special Conditions3 cards

Complete Flashcard Reference

Review every term in this set. Open any term to reveal its definition.

A 12 Ω resistor has 48 V across it. What current flows?

4 A. Rearrange Ohm’s law to I = V ÷ R, then divide 48 V by 12 Ω.

What is the total resistance of 8 Ω and 12 Ω in series?

20 Ω. Series resistances add because the same current passes through both resistors.

What is the equivalent resistance of 6 Ω and 3 Ω in parallel?

2 Ω. Add the reciprocals, 1/6 + 1/3 = 1/2, then invert. The equivalent resistance is below the smaller branch resistance.

A 240 V resistive heater draws 12 A. How much power does it use?

2,880 W. For a purely resistive load, multiply voltage by current.

How much energy does a 1.5 kW load use in four hours at full power?

6 kWh. Multiply power in kilowatts by time in hours.

How do NEC Chapters 5–7 relate to the general rules in Chapters 1–4?

Under 90.3, Chapters 5–7 can add to or modify the general requirements. Check the article for the specific occupancy, equipment, or condition before settling on a general rule.

Where does a branch circuit begin?

At the final overcurrent device protecting that circuit. The branch-circuit conductors run from that device to the outlets served.

What makes the conductors from service equipment to a downstream panel’s branch breakers a feeder?

They supply the final branch-circuit overcurrent devices. The branch circuits start on the load side of those devices. See Article 215 for feeder rules.

Which NEC article covers service conductors and service equipment?

Article 230. Start there for requirements such as the service disconnect. Feeder rules begin in Article 215.

A branch circuit supplies 16 A continuously plus 6 A noncontinuously. What minimum conductor ampacity does the general load calculation give before adjustment or correction?

26 A. Under 210.19(A)(1), add 125% of 16 A to 6 A. This is the general calculation before any separate ampacity checks or applicable exceptions.

What is a demand factor in a load calculation?

The ratio of maximum demand to the total connected load. Use the factors permitted by NEC Article 220 for the particular load and calculation method.

What current pattern causes a GFCI to trip?

An imbalance between current leaving and returning on the circuit conductors. The imbalance indicates current taking another path, which could be through a person.

What hazard is an AFCI intended to detect?

Arcing faults that can start a fire. The device recognizes characteristic arcing in a circuit and interrupts it.

Why does an equipment grounding path need low impedance?

It must carry enough fault current back to the source to operate the breaker or fuse promptly. NEC 250.4(A)(5) explains why earth alone cannot serve as that path.

In a typical feeder-supplied panel downstream of the service disconnect, how should the neutral bar relate to the enclosure?

Keep the neutral bar isolated from the enclosure and equipment grounding bar. Rebonding there would let normal neutral current divide onto metal grounding paths. See 250.24(A)(5).

What connects the grounded system to the grounding electrode system?

The grounding electrode conductor. It connects the system to electrodes such as qualifying concrete-encased electrodes or ground rods. See Article 250.

What must a breaker’s interrupting rating be compared with?

The available fault current at the breaker’s line terminals. Its interrupting rating at the circuit voltage must be at least that value. See NEC 110.9.

What must a multiwire branch circuit’s disconnecting means open together?

All ungrounded conductors of that branch circuit at its origin. That is the simultaneous disconnect requirement in 210.4(B).

How does the NEC classify the inside of an aboveground raceway installed in a wet location?

As a wet location. Use conductors or cables suitable for wet locations under 300.9 and 310.10(C).

Where do you start a typical raceway conductor ampacity lookup?

Table 310.16, when its conditions apply. Match conductor size, material, and temperature column, then check corrections, adjustment factors, and termination ratings.

Can 90°C conductor insulation alone justify using the 90°C ampacity at 75°C terminals?

The 90°C ampacity can be the starting point for correction or adjustment. The result is still capped by the applicable 75°C terminal ampacity under 110.14(C).

A single-gang switch yoke has 12 AWG as its largest connected conductor. What box-fill volume does the yoke itself add?

4.50 in³. In the 2023 NEC, 314.16(B)(4) counts two volume allowances for the yoke. The table gives 2.25 in³ per 12 AWG allowance.

Does an insulated pigtail that stays entirely inside a box add a conductor-fill allowance?

No separate conductor allowance under 314.16(B)(1). Still count any applicable device, clamp, and grounding allowances separately.

What is the ordinary Chapter 9, Table 1 raceway fill limit for three or more conductors?

40% of the raceway’s internal cross-sectional area. Apply the table notes when a special case, such as a qualifying short nipple, applies.

What is the total bend limit in EMT between pull points?

360 degrees under 358.26. Add every bend, including the bends that make up offsets, when checking the total.

What protects Type NM cable through a punched hole in a steel stud?

A listed bushing or grommet secured in the opening and covering the exposed metal edges. NEC 300.4(B)(1) addresses abrasion where the cable passes through the stud.

How much free conductor is generally required for a splice or termination at a box?

At least 6 in. measured from where the conductor emerges from its raceway or cable sheath. NEC 300.14 also sets a reach requirement for small openings.

A 3 in. raceway is the largest in a straight pull with insulated 4 AWG or larger conductors. What minimum box length does the standard rule give?

24 in. in the direction of the pull. NEC 314.28(A)(1) uses eight times the largest raceway trade size for a straight pull.

Which conductor should an ordinary single-pole wall switch open on a 120 V lighting circuit?

The ungrounded (hot) conductor. Opening only the neutral can leave the fixture energized relative to ground. See 404.2(B).

What does a panelboard’s circuit directory need to tell you?

The specific purpose or location served by each circuit. A label such as “second-floor east office receptacles” identifies the circuit better than “plugs.” See 408.4(A).

Can an extension cord serve as a permanent substitute for fixed building wiring?

No. NEC 400.12 generally prohibits using flexible cords and cables as a substitute for a structure’s fixed wiring.

What location marking should you look for on a luminaire exposed directly to rain?

Marked suitable for wet locations. A damp-location marking alone is insufficient for direct rain exposure. See 410.10(A).

Where do you normally get the full-load current used to size branch-circuit conductors for a standard motor?

Use the applicable NEC Article 430 motor-current table under 430.6(A)(1). The section identifies motors and applications for which nameplate or other values apply.

What current is used to size separate overload protection for a standard motor?

The actual motor nameplate current. Use 430.6(A)(2) and the applicable rule in 430.32 to account for the motor’s characteristics.

What does a motor overload device protect against?

Sustained overload that can overheat the motor. Separate branch-circuit short-circuit and ground-fault protection addresses high fault currents. See 430.32 and 430.52.

A single continuous-duty motor has a table full-load current of 24 A. What is the general minimum branch-conductor ampacity?

30 A before other applicable checks. Under 430.22, multiply 24 A by 125%.

An ideal transformer has a 4:1 primary-to-secondary turns ratio and a 480 V primary. What secondary voltage results?

120 V. The ideal voltage ratio equals the turns ratio, so divide the primary voltage by four.

Which NEC section gives overcurrent protection limits for a general-purpose transformer?

Section 450.3. Select the table by the transformer’s voltage category, then use the applicable primary-only or primary-and-secondary protection row.

How do Class I and Class II hazardous locations differ?

Class I involves flammable gases or vapors. Class II involves combustible dust. See NEC Article 500 for the classifications.

In Class I, what operating condition generally distinguishes Division 1 from Division 2?

Ignitable concentrations may occur during normal operation in Division 1. In Division 2, they generally arise only under abnormal conditions, such as a leak or ventilation failure.

How does intrinsic safety address ignition risk in a classified location?

The system limits electrical and thermal energy so that sparks or heating cannot ignite the specified atmosphere under the conditions evaluated. See Article 504.

What two grounding paths are generally used for branch circuits serving patient care spaces?

A qualifying metal raceway or metallic cable armor or sheath, plus an insulated copper equipment grounding conductor. NEC 517.13(A) and (B) give the requirements and exceptions.

Which NEC article is the starting point for wiring at a motor-fuel dispensing facility?

Article 514. Use its location classification rules to determine where an installation also needs classified-location wiring or equipment.

When must temporary wiring for construction be removed?

When the construction or other purpose for which it was installed is complete. NEC 590.3(D) ties removal to the end of that use.

Why is equipotential bonding used around a swimming pool?

It reduces voltage differences between conductive parts in the pool area, lowering the risk of shock from touching two points at different voltages. See 680.26.

Why can the DC side of a solar PV array remain energized when the utility supply is off?

Illuminated PV modules can still produce voltage. Turning off the utility source does not stop the modules from generating. See Article 690 for PV system requirements.

How does NEC 625.42 classify electric vehicle charging loads?

As continuous loads for Article 625. Use the continuous-load rules when checking circuit sizing for electric vehicle supply equipment.

Which NEC article covers emergency power for life-safety loads such as required egress lighting?

Article 700, Emergency Systems. It covers power for functions essential to life safety when the normal source fails.

Which NEC article covers legally required standby power for loads that prevent hazards during an outage?

Article 701, Legally Required Standby Systems. It applies when a law or governmental requirement calls for standby power for designated loads whose loss could create hazards or hinder rescue or firefighting.

Why does an optional standby generator need suitable transfer or interconnection equipment?

It prevents an unintended connection between the generator and the normal source, which could backfeed the utility. See Article 702.

Frequently Asked Questions

How many questions are on the Idaho journeyman electrician exam, and what score do I need?

PSI lists 100 questions, 270 minutes of testing time, and a minimum passing score of 70 in its bulletin effective July 9, 2026. The Idaho Electrical Board’s public minutes discuss pass-rate trends without giving a current percentage for this exam.

Which exam should I select in PSI’s Idaho portal?

Select ID Journeyman Electrician. Idaho administers the state exam developed by PSI. The Idaho Electrical Board also accepts passing NASCLA scores, and applicants taking the NASCLA exam schedule it through NASCLA.

What should I study first for the Idaho journeyman electrician exam?

Start with Wiring and Protection, which accounts for 25 of 100 questions. Wiring Methods and Materials and Equipment for General Use account for 19 each. Together those three domains account for 63 questions, so practice looking up protection, wiring methods, and equipment rules.

Which NEC book can I bring to the Idaho journeyman electrician exam?

The exam is open book. PSI lists the 2020 or 2023 NFPA 70 National Electrical Code and the 2023 Ugly’s Electrical References. It also lists the 2020 or 2023 editions of Ferm’s Fast Finder Index and Tom Henry’s Key Word Index as optional. Bring your own books. PSI allows advance highlighting, underlining, and permanent indexing. It prohibits loose papers, temporary markers, and writing in the books during the test.

Which NEC edition governs electrical installations in Idaho?

Idaho’s installation rules use the 2023 NEC with the amendments in IDAPA 24.39.10.600. For the licensing exam, use the NEC edition listed in PSI’s bulletin. The flashcards use 2023 section references.

Can I sit for the exam before I finish all 8,000 hours of apprentice work?

Yes, if you can show completion of the approved four-year sequence of instruction under IDAPA 24.39.10.100.02(a). To receive the license on that route, you must also document at least 8,000 hours of qualifying apprentice installation work and pass the exam. The experience-only route requires proof of 16,000 hours of qualifying electrical experience.

What happens if I fail the Idaho journeyman electrician exam?

PSI allows repeat attempts as needed and requires an exam fee for each attempt. The current bulletin does not give a fixed waiting interval or identify a separate waiting period after three failures. The score report gives a breakdown to guide your review before you reschedule.

Same family resources

Explore More Electrician License

Continue into nearby exams from the same family. Each card keeps practice questions, study guides, flashcards, videos, and articles in one place.