4.3 Repairs, Contractors and Development Consents
Key Takeaways
Apply the relevant statutory repair and fitness duties, then prioritise work by actual risk and any legal notice or deadline.
Arrange routine access properly, escalate immediate dangers promptly, and choose a contractor competent for the particular work.
Check the agreement, warranty, charge and authorisation. Disclose contractor commissions and verify the work before paying from the client account.
For development work, assess planning and building control, listed or conservation status, party wall procedure, access and any private consents independently.
Make an urgent defect safe and establish the cause. A claim for tenant damage must be for an evidenced breach and loss.
Identify the duty and the urgency
For an English tenancy in scope, section 11 of the Landlord and Tenant Act 1985 covers the structure and exterior and specified installations, including water, gas, electricity, sanitation and space and water heating. Apply the fitness covenant under sections 9A–10 where it applies. The tenant’s duty of reasonable care does not transfer ordinary structural or installation failures to them. Check the statutory limits, including a need to obtain rights over other parts of the building where applicable. In Wales, apply sections 91–98 of the Renting Homes (Wales) Act 2016 to the occupation contract. Section 97 addresses when the landlord is aware of the need for work and the reasonable time for compliance. Section 96 includes limits where the contract-holder or permitted occupier caused the problem through lack of care. English repair and fitness duties · Welsh repair and fitness duties
Record when and how the fault became known, who is affected and what evidence is available. Check any specialist duty, statutory notice, service agreement and warranty. Confirm who must respond and pay. For example, a boiler warranty may provide a route to an authorised engineer, but the agent still needs to address an immediate risk and track the landlord’s obligations.
| Priority | Response based on the facts |
|---|---|
| Immediate danger | A suspected gas escape, dangerous exposed electrical parts, uncontrolled water near wiring or sewage affecting the only toilet can require immediate action. Use the appropriate emergency service and arrange make-safe work. |
| Urgent defect | For an active roof leak, worsening damp or loss of heating, consider the time of year, severity and occupants’ vulnerability. Arrange investigation promptly and update the tenant. |
| Routine defect | Log a minor drip or loose cupboard hinge, agree an appointment and move it up the list if the risk changes. |
The priority labels are for managing the job. Check the actual legal timeframes. A private agent’s own response targets do not set a general legal deadline. The council’s Housing Health and Safety Rating System assessment is a separate enforcement route. It must take appropriate action for a Category 1 hazard and has powers for Category 2 hazards. The English social rented sector’s Awaab’s Law deadlines must be applied only to cases within that regime. The private-sector changes remain subject to implementation. Housing Act 2004, sections 5–7 · Private-sector Awaab’s Law consultation
If someone reports a strong smell of mains gas and feels unwell, prioritise getting people outside promptly and calling the National Gas Emergency Service (0800 111 999) from safety. Avoid flames and operating switches. Stay out until advised it is safe to return. A suspected carbon monoxide incident also requires evacuation and urgent medical help for symptoms. Call 999 for a serious medical emergency. Carbon monoxide itself has no smell. Arrange any subsequent gas work with a qualified Gas Safe engineer. HSE carbon monoxide guidance · UK Health Security Agency guidance · Gas safety regulation 3
Authorise safe work and arrange access
- Select a competent contractor. Check current insurance and that it covers the job. Public liability cover and its amount depend on the work and contract. Where employers’ liability insurance is legally required, the aggregate statutory minimum is £5 million. For relevant gas work, verify the Gas Safe registration and the engineer’s category for that work. For electrical inspections check the inspector’s qualifications and competence. For installation work confirm the building control or competent person route separately. Membership of a named trade body is one possible way of demonstrating competence for an appropriate job.
- Provide information and scope. Identify the applicable client and other dutyholders before construction work starts. Where the landlord is a commercial client under CDM 2015, ensure suitable arrangements and, where required for more than one contractor, appoint a principal designer and principal contractor. For intrusive work, establish whether asbestos is likely in the area and obtain the applicable assessment or survey before work starts. Pass relevant findings to the contractor. Use a licensed contractor where the asbestos work requires one.
- Agree authority, access and price. Check the repair spending limit, emergency authority and any required approvals. Compare quotes where appropriate and give an adequate brief. Disclose any benefit or commission to the landlord and obtain informed consent before proceeding. An agent’s undisclosed contractor commission is a secret profit. Protect access codes, keys and tenant information.
- Check work and payment. Match completion evidence and any required certificates to the authorised scope. Verify the itemised invoice and record the landlord’s approval where needed. Use the correct client ledger. Tell the occupier what was done and check further action if the defect continues.
Gas safety regulation 36 · Employers’ liability insurance regulations · English electrical inspection regulation 3 · HSE CDM duties · HSE asbestos surveys · Supreme Court, FHR European Ventures v Cedar Capital
Access. In England, section 11(6) provides for entry to view the condition and state of repair at a reasonable time after at least 24 hours’ written notice. Use any relevant contractual or statutory basis for carrying out works and arrange access with the tenant. Under Welsh section 98, give the contract-holder at least 24 hours’ notice before reasonable-time entry for inspection or work under sections 91 or 92, subject to the applicable terms and scope. If access is refused, record attempts, offer workable alternatives and use the formal route if needed. Do not force routine access or use a retained key against an occupier’s refusal. A genuine emergency may justify immediate access under the applicable rules. English section 11(6) · Welsh section 98 · Government guidance on repair access
Damage claim. Clear a blocked sole toilet promptly where it poses a hygiene risk. Establish whether a defective pipe or proven occupier misuse caused it. For misuse by an identified tenant, check the obligation breached and the reasonable loss actually caused. Explain and evidence a genuine claim, with an opportunity to dispute it. In an English case, the ban on unpermitted default fees does not prevent recovery of genuine contract damages through an evidenced agreement, the applicable deposit dispute procedure or the courts. Do not relabel a penalty as damages or divert rent to the charge. Tenant Fees Act 2019, Schedule 1 paragraph 5 · Tenant Fees Act statutory guidance on damages
Identify consents before starting development
| Question | Practical check |
|---|---|
| Is the proposal development? | The Town and Country Planning Act 1990 covers building or other operations and material changes of use. Check whether work such as an extension or change of use needs express permission, is permitted development under the applicable national rules, or is outside the definition. Check conditions and any local restriction on permitted development. |
| Is building control needed? | Building regulations address technical compliance, including structure, fire safety, ventilation and electrical safety. Check the proper notification or approval route. For example, installing a new circuit or replacing a consumer unit in an English dwelling is notifiable under Part P and the relevant procedural rules. An appropriately registered installer may be able to self-certify. Check the separate Welsh rules, including relevant work in kitchens, special locations and special installations. Obtain the correct completion or compliance evidence. |
| Is the building listed or in a conservation area? | Check whether proposed work affects a listed building’s special character. Listed building consent is distinct from planning permission. The English 1990 listed buildings Act and the Historic Environment (Wales) Act 2023 provide separate routes. For conservation areas check local restrictions and demolition controls. |
| Does the work affect an adjoining owner or require access? | The Party Wall etc. Act 1996 may apply to boundary or party structure work or certain excavations near neighbouring foundations. Use the relevant notice and resolve a dispute under the Act. Party structure work generally requires two months’ notice, and a qualifying excavation normally requires one month. If ordinary preservation work, such as repairing a wall, cannot reasonably be done without entering a neighbour’s land, first seek permission. Where the statutory conditions apply a court can make an access order under the Access to Neighbouring Land Act 1992. |
| Is permission needed under a lease or covenant? | Check the freeholder or other party’s approval and the agent’s authority. A planning approval alone does not satisfy a private restriction or a party wall duty. |
For a listed flat with a proposed new circuit and an external alteration, check whether the alteration needs planning permission and whether either part affects the building’s listed character. Check Part P for the circuit and the headlease for landlord consent. If the associated works require qualifying excavation next to a neighbouring foundation, check the Party Wall Act separately. Keep written approvals, notices and compliance certificates with the works records.
A breach of planning control can lead to a planning enforcement notice and its own appeal route. In England the ordinary enforcement period for unauthorised operational development substantially completed from 25 April 2024 is ten years. In Wales the ordinary period for operational development remains four years from substantial completion, and four years also generally applies to a change to use as a single dwellinghouse. Check the breach category, dates, savings and exceptions. Building control can separately require work that breaches applicable building regulations to be altered or removed. Unauthorised character-affecting works to a listed building may be a criminal offence. Planning Act sections 55, 57 and 171A–174 · English enforcement guidance · Welsh planning enforcement and appeals · Building Regulations 2010 · Welsh electrical building rules · Building Act section 36 · English historic environment guidance · Cadw listed building guidance · Cadw conservation areas · Party Wall etc. Act 1996 · Access to Neighbouring Land Act 1992, section 1
Recognise a statutory nuisance complaint
In England and Wales, premises in a state prejudicial to health or amounting to a nuisance may fall under the Environmental Protection Act 1990. A local authority must take reasonably practicable steps to investigate a complaint by a person living in its area. If satisfied that a statutory nuisance exists or is likely to occur or recur, it generally serves an abatement notice on the person responsible, subject to the statutory rules. A person aggrieved can also use the separate magistrates’ court route under section 82 after the required notice. A report about damp can require several responses: repair or fitness action by the landlord, possible housing enforcement, and consideration of the nuisance test on the evidence. Environmental Protection Act sections 79–82
For noise, identify its source, duration, repetition and impact, and keep dated reports. Section 79 of the 1990 Act covers qualifying noise from premises at any time. The Noise and Statutory Nuisance Act 1993 added qualifying noise from vehicles, machinery or equipment in a street, subject to exceptions. The separate Noise Act 1996 procedure can allow council warning notices for excessive noise during 11 pm to 7 am. For example, repeated amplified music overnight in a neighbouring flat could warrant both a statutory nuisance investigation and consideration of the night-noise warning procedure where available. The council assesses the statutory tests. The agent should record and refer the concern and deal independently with any breach of the letting terms. Noise and Statutory Nuisance Act 1993, section 2 · Noise Act 1996 · Government noise guidance
A tenant reports a strong smell of mains gas near their boiler and says they feel dizzy. What is the priority?
Obtain quotes and wait for the landlord’s approval.
Give notice for an inspection the following afternoon.
Get occupants out promptly, avoid switches and flames, call the gas emergency service from safety, and get urgent medical help for symptoms.
Send a general handyman to open the boiler casing.
A maintenance supplier offers a managing agent a personal rebate for sending landlords' boiler work to it. The client agreement authorises the agent to instruct repairs within a spending limit but says nothing about rebates. What should the agent do before accepting?
Accept because a repair spending limit also authorises any supplier rebate.
Disclose the benefit to each affected landlord and obtain informed consent before taking it.
Accept and tell the landlords only if a repair costs more than the spending limit.
Treat the offer as income earned for the clients and keep it in the agent's business account without telling them.
An English tenant’s sole toilet is blocked. The agent arranges prompt clearance. Evidence establishes that the named tenant breached the tenancy by flushing unsuitable wipes and that the reasonable loss was £180. What should the agent do about the cost?
Explain and evidence the £180 damages claim, allow it to be disputed and use the agreed or lawful recovery route.
Wait for the tenant to pay the plumber before arranging clearance.
Apply £180 of the next month’s rent to repairs and treat the rent as unpaid.
Assume the tenant can never be liable because the problem involved a toilet.