1.8 Electrical Inspections, Furniture and Fire Safety
Key Takeaways
In-scope English rented homes need fixed electrical inspections at least every five years, or sooner where required by the report. Give existing tenants the report within 28 days of inspection and new tenants a copy before occupation.
The English changes from 30 November 2026 remove specific references to further investigative work for new inspections. Savings preserve the earlier provisions for relevant inspections completed before that date.
Under the Welsh fitness regulations, give the contract-holder the electrical report within 14 days from the occupation date or, for a later inspection, within 14 days from completion.
The 2025 furniture amendments removed display labels. Permanent labels remain required where the amended furniture regulations specify them.
In England, the responsible person of an in-scope residential building above 11 metres must check communal fire doors at least quarterly and use best endeavours to check flat entrance fire doors at least annually.
Check the fixed installation and the report
The amended Electrical Safety Standards in the Private Rented Sector and Social Rented Sector (England) Regulations 2020 cover relevant English tenancies. Check the exceptions, such as accommodation the tenant shares with the landlord or a member of the landlord’s family. For a typical private rented home in scope, a qualified person inspects and tests the fixed installation, including wiring, sockets, fixed fittings and the consumer unit. The interval is at most five years, or less if the report requires a sooner test. Obtain the report, usually an Electrical Installation Condition Report (EICR), and check its results and the date of the next test. Keep the report until the next inspection deadline or the next inspection itself, whichever is later, unless a more recent qualifying report supersedes it. Give it to the next inspector. The fixed installation duty is distinct from the safety of portable appliances and from the additional equipment duties for registered social landlords. Check applicable licence conditions for a particular property. English electrical safety regulations · Government guidance
| Report observation | Meaning and action |
|---|---|
| C1 | Danger is present. Arrange immediate action to make it safe. |
| C2 | Potential danger makes the report unsatisfactory. Arrange the required remedial work in time. |
| C3 | Improvement recommended. This code alone does not make the report unsatisfactory. |
| FI | Further investigation required without delay. Check the report date and the applicable requirements. |
For an inspection completed under regulation 3 on 26 November 2026, arrange required remedial work or further investigation by a qualified person within 28 days starting with the date of the inspection and test, or sooner if the report specifies a shorter period. Within 28 days of completion, give the existing tenant and local authority written confirmation from the qualified person, together with the inspection report. For the inspection report itself, use the distinct delivery clocks below. Local councils can impose a financial penalty of up to £40,000 for specified breaches of the English regulations. Regulation 3 and the financial penalty provisions
| Recipient of the initial or periodic English report | Delivery rule |
|---|---|
| Existing tenant | Within 28 days of the inspection and test |
| New tenant | Before occupation |
| Prospective tenant | Within 28 days of receiving a written request |
| Local housing authority | Within seven days of receiving a written request |
Inspections before and from 30 November 2026
SI 2026/1196 takes effect on 30 November 2026 for the English regulations. It updates the referenced electrical standard to BS 7671:2018+A4:2026. It clarifies which still-current reports from qualifying inspections within five years can meet the pre-tenancy inspection requirement. It removes specific provisions on further investigative work for new inspections. Regulation 9 preserves the earlier further-investigation provisions for inspections completed under regulation 3 before 30 November. Keep responding to unsafe findings and follow the qualified person’s advice. For an inspection dated 26 November, the preserved requirements still govern any further investigative work required by that report, even if the action takes place after the amendment starts. 2026 amendment and savings
Wales has its own fitness rules
In Wales, apply regulation 6 of the Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022. A valid electrical condition report is required during occupation for contracts in scope, with a five-year maximum interval or any shorter period specified on the report. Give the contract-holder a copy within 14 days starting with the occupation date. Include the qualified person’s written confirmation of any investigatory or remedial work done after the corresponding inspection and before the occupation date. For a later inspection, give the new report within 14 days starting with the day the inspection was completed. Where investigatory or remedial work takes place after the occupation date, give written confirmation within 14 days starting with receipt of the confirmation by the landlord. These clocks differ from the English rules. Welsh regulation 6 · Welsh landlord guidance
Check the furniture being supplied
The Furniture and Furnishings (Fire) (Safety) Regulations 1988, as amended, apply to furniture supplied in the course of letting. The applicable fire resistance requirements depend on the item and its components. A supplied adult upholstered sofa is within scope. Carpets, curtains and ordinary duvets fall outside these specific furniture rules. Mattresses and bed bases have different requirements from upholstered seating, including an exception from the 1988 permanent labelling requirement. From 30 October 2025, the amendments removed display or swing labels and excluded specified products for babies and young children, including mattresses designed for them that are both shorter than 170 cm and narrower than 75 cm. Regulation 11 still requires permanent labels for the items specified in Schedule 7. Check the safety requirements when supplying second-hand items as well. If a regulated sofa is missing its required label, resolve the issue before supplying it with the flat. Furniture regulations · 2025 amending regulations
Identify the responsible person for common fire risks
The Regulatory Reform (Fire Safety) Order 2005 applies in England and Wales to relevant common parts and other areas in scope. For buildings with two or more sets of domestic premises, the Fire Safety Act 2021 clarified the coverage of structure, external walls and doors between domestic premises and common parts. Identify the responsible person or persons under the Order and the parts of the premises each controls. A suitable and sufficient fire risk assessment considers those risks and the measures required to address them.
In England, the Fire Safety (England) Regulations 2022 require the responsible person of a multi-occupied residential building in scope to provide residents with fire safety instructions and fire door information. When the height to the top storey exceeds 11 metres, the responsible person checks communal fire doors at least quarterly and uses best endeavours to check flat entrance fire doors at least every 12 months. The checks include testing self-closers. Record the steps taken to check flat entrances, including access attempts where necessary. Additional requirements apply to high-rise residential buildings at least 18 metres or seven storeys, including a secure information box and monthly routine checks of relevant lifts and essential firefighting equipment. Thus a 14-metre English block in scope still has the door checks. For a block in Wales, start from the Fire Safety Order and the applicable Welsh rules. England and Wales Fire Safety Order guidance · English regulations
Private English landlords already have safety and fitness duties. The government is consulting on additional statutory hazard-response timescales for the private sector under the Renters’ Rights Act 2025. The private-sector timescales are still to be set in regulations as of 26 November 2026. Apply existing duties to current private lettings. Private-sector Awaab’s Law consultation
On 20 November 2026 a qualified person inspects an occupied private rented home in England covered by the 2020 regulations. The report requires remedial work for a C2 finding and gives no shorter deadline. It also lists two C3 recommendations. What should the landlord do?
Treat the report as satisfactory because there is no C1 observation.
Send the report to the local authority within 28 days regardless of any request and leave the defect alone.
Arrange the C2 work by 17 December and provide the report and qualified person’s written confirmation to the existing tenant and local authority within 28 days of completion. The C3 observations are recommendations.
Complete the C2 and C3 items within seven days and test all of the tenant’s own appliances.
In November 2026, an English letting agent checks two mattresses intended for young children. Neither is modular. One measures 169 cm by 74 cm and the other measures 169 cm by 75 cm. How does the October 2025 size exclusion apply?
The 169 cm by 74 cm mattress meets the exclusion. The 169 cm by 75 cm mattress does not meet it.
Both mattresses meet the exclusion because each is shorter than 170 cm.
Both mattresses meet the exclusion because 75 cm is within the permitted width.
Neither mattress meets the exclusion because the change applies only to modular mattresses.
What door checks apply under the Fire Safety (England) Regulations 2022 to the responsible person for an English block whose top storey is 14 metres above ground level with multiple flats and common parts?
None because the block is under 18 metres.
Only monthly checks of every internal bedroom door.
Only whatever checks each leaseholder decides to carry out on their own flat entrance door.
Communal fire door checks at least quarterly and best endeavours to check flat entrance fire doors at least every 12 months.
Sections you finish are checked off in the contents.